GME 14018-2007 Testing the Force Fit of Pipe Connections of Exhaust System Pipes (English German Note This specification may be applied only for current projects It is Superceded f49.pdf
《GME 14018-2007 Testing the Force Fit of Pipe Connections of Exhaust System Pipes (English German Note This specification may be applied only for current projects It is Superceded f49.pdf》由会员分享,可在线阅读,更多相关《GME 14018-2007 Testing the Force Fit of Pipe Connections of Exhaust System Pipes (English German Note This specification may be applied only for current projects It is Superceded f49.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Test ProcedureLaboratory GME14018Testing the Force Fit of Pipe Con-nections of Exhaust System PipesRohrsteckstellenfestsitzprfungvon AbgasanlagenrohrenNote: This specification may be applied only forcurrent projects. It is Superceded for all futureprojects and replaced by GMW14449.Hinweis: Diese Spe
2、zifikation darf nur noch frlaufende Projekte angewendet werden und istfr alle zuknftigen Projekte ungltig und ersetztdurch GMW14449.1 Introduction 1 Einleitung1.1 Purpose. Determining the force fit of exhaustsystem pipe connections in laboratory test.1.1 Zweck. Ermittlung des Festsitzes der Abgasan-
3、lagenrohrsteckverbindung im Laborversuch.1.2 Foreword. Not applicable. 1.2 Vorwort. Nicht anwendbar.1.3 Applicability. For all exhaust system pipe con-nections which are connected by means of a clamp.1.3 Anwendbarkeit. Fr alle Rohrsteckverbindun-gen der Abgasanlage, die mit einer Schelle verbun-den
4、sind.1.4 Definitions. Not applicable. 1.4 Definitionen. Nicht anwendbar.Note: Nothing in this standard supersedes applica-ble laws and regulations.Hinweis: Die Vorschrift darf keine anzuwendendenGesetze und Regelungen auer Kraft setzen.Note: In the event of a conflict between the GermanandtheEnglish
5、language,the Germanlanguageshalltake precedence.Hinweis: Im Falle von Unstimmigkeiten zwischendem deutschen und dem englischen Text ist derdeutsche Text ausschlaggebend.2 References 2 ReferenzenNote: Only the latest approved standards are appli-cable unless otherwise specified.Hinweis: Wenn nicht an
6、ders angegeben, ist jeweilsdieneueste Fassung der angegebenenReferenz gl-tig.2.1 External Standards/Specifications. None. 2.1 Externe Normen/Vorschriften. Keine.2.2 GM Group Standards/Specifications. 2.2 GM Gruppe Normen/Vorschriften.GME31493 Resources 3 Gerte und Einrichtungen3.1 Facilities. 3.1 Ei
7、nrichtung. Copyright 2007 General Motors Corporation All Rights ReservedPublication Department: GME Specification CenterJune 2007 - Issue No. 2 Page 1 of 8PRD045 - VPRE ST 1 10/03GME14018 GM EUROPE ENGINEERING STANDARDS3.1.1 Heating oven to condition the pipe connection(+600 C min.)3.1.1 Heizofen zu
8、m Temperieren der Rohrsteckver-bindung (+600 C min.)3.1.2 Torsion testing device 3.1.2 Torsionsprfeinrichtung3.1.2.1 Data acquisition (X-Y recorder) 3.1.2.1 Datenerfassung (X-Y-Schreiber)3.1.2.2 Torque load cell (measuring range(10.500) Nm)3.1.2.2 Drehmomentenmessdose (Messbereich(10.500) Nm)3.1.2.3
9、 Torque angle gauge (measuring range(0.90) )3.1.2.3 Drehwinkelmesser (Messbereich (0.90) )3.1.2.4 Leak measuring equipment according toGME3149.3.1.2.4 Leckagemesseinrichtung nach GME3149.3.2 Equipment. 3.2 Ausrstung.3.2.1 Torque wrench (measuring range(10.100) Nm).3.2.1 Drehmomentenschlssel (Messber
10、eich(10.100) Nm).3.3 Test Vehicle / Test Piece. The test shall be per-formed on 5 new 300 mm long pipe sections manu-factured under production conditions, the dimensionsof which are the upper tolerance range, according tothe drawing specifications. The surface properties ofthe pipe sections shall co
11、rrespond to the series pro-duction parts, as per the part drawing for the pipe.3.3 Testfahrzeug/Probekrper. DiePrfungerfolgtan 5 neuen produktionsmig gefertigten 300 mmlangen Rohrabschnitten deren Rohrabmessungen imToleranzband der Zeichnungsvorschrift liegen. DieOberflcheneigenschaften der Rohrabsc
12、hnitte ms-sen entsprechend der Rohrteilzeichnung den Serien-teilen entsprechen.3.4 Test Time. Not applicable. 3.4 Prfzeit. Nicht anwendbar.3.5 Test Required Information. Not applicable. 3.5 Zum Prfen bentigte Informationen. Nichtanwendbar.3.6 Personnel / Skills. Not applicable. 3.6 Personal / Fhigke
13、iten. Nicht anwendbar.4 Procedure 4 Durchfhrung4.1 Preparation. 4.1 Vorbereitung.4.1.1 Pairing the Pipe Sections. To pair the pipesections, the 300 mm long sections of insert andpush-on pipes shall be measured in the connectionarea. The outer lower (min.) and upper (max.)diameters of the insert pipe
14、 shall be determined. Theinner lower (min.) and upper (max.) diameters of thepush-on pipe shall be determined.4.1.1 Paarung der Rohrabschnitte. Zur Paarungder Rohrabschnitte sind die 300 mm langen Ein- undAufsteckrohrabschnitte im Steckstellenbereich zuvermessen. Am Einsteckrohr ist der uere untere(
15、min.) und obere (max.) Durchmesser zu ermitteln.Am Aufsteckrohr ist der innere untere (min.) undobere (max.) Durchmesser zu ermitteln.The measured values shall be documented inTable 1.Die ermittelten Werte sind in Tabelle 1 zu dokumen-tieren. Copyright 2007 General Motors Corporation All Rights Rese
16、rvedPage 2 of 8 Issue No. 2 - June 2007PRD045 - VPRE ST G 10/03GM EUROPE ENGINEERING STANDARDS GME14018To pair the pipe sections, the tolerances of the insertand push-on pipes (column I in Table 1) shall be inthe upper range.Zur Paarung der Rohrabschnitte muss die ToleranzzwischenEin-undAufsteckrohr
17、(SpalteIinTabelle 1)im oberen Bereich liegen. Copyright 2007 General Motors Corporation All Rights ReservedJune 2007 - Issue No. 2 Page 3 of 8PRD045 - VPRE ST U 10/03GME14018 GM EUROPE ENGINEERING STANDARDSTable1:PipePairingReportTabelle1:ProtokollderRohrpaarungPipewallthickness:/Rohrwanddicke:Pipem
18、aterial:/Rohrmaterial:Surfacecondition:/Oberflchenzustand:.Pipemanufacturer:/Rohrhersteller:.ABCDEFGHIInsertPipe-OuterDiameter/Einsteckrohr-AuendurchmesserinmmPush-OnPipe-InnerDiameter/Aufsteckrohr-InnendurchmesserinmmPartno./Teil-Nr.minmaxAveragevalue/MittelwertPartno./Teil-Nr.minmaxAveragevalue/Mi
19、ttelwertTolerance/ToleranzNominalmin/Sollmin(Note1)Nominalmax/Sollmax(Note1)Nominalmin/Sollmin(Note1)Nominalmax/Sollmax(Note1)Note1:NominalvalueinaccordancewithCTS/partdrawingNote1:SollwertgemCTS/Teilzeichnung Copyright 2007 General Motors Corporation All Rights ReservedPage 4 of 8 Issue No. 2 - Jun
20、e 2007PRD045 - VPRE ST G 10/03GM EUROPE ENGINEERING STANDARDS GME14018Explanatory note to Table 1:Test no. of pipe - column A, Emeasured pipe diameter - column B, C, F, Gcolumn D = (B + C)/2, H = (F + G)/2columnI=H-DErluterung zu Tabelle 1:Prf-Nr. des Rohres - Spalte A, Egemessener Rohrduchmesser -
21、Spalte B, C, F, GSpalteD=(B+C)/2,H=(F+G)/2Spalte I = H - D4.1.2 Mounting the Pipes. When mounting thepipes, which shall be performed according to the partdrawing, the following shall be noted:4.1.2 Montage der Rohre. Bei der Montage derRohre, die nach der Teilzeichnung durchzufhren ist,ist zu beacht
22、en:1 the depth to which the insert pipe is inserted intothe push-on pipe,1 die Einstecktiefe des Einsteckrohres in das Auf-steckrohr,2 the positioning of the clamp on the push-on pipeand2 die Positionierung der Schelle auf dem Aufsteck-rohr und3 the bolt tightening torque (Ma) of the clamp screwconn
23、ection.3 das Schraubenanzugsmoment (Ma) der Schellen-verschraubung.4.1.3 Measuring the Leakage Rate of the PipeConnection. Determining the leakage rate of thepipe connection according to GME3149.4.1.3 Leckratenmessung der Rohrsteckstellen-verbindung. Ermittlungder Rohrsteckstellenleckratenach GME314
24、9.Determining the leakage rate shall be performed fol-lowing paragraph 4.1.2.Die Leckratenmessung erfolgt im Anschluss anAbschnitt 4.1.2.The permissible leakage rate can be taken from theCTS/part drawing.Die zulssige Leckrate ist der CTS/Teilzeichnung zuentnehmen.The measured leakage rates shall be
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GME140182007TESTINGTHEFORCEFITOFPIPECONNECTIONSOFEXHAUSTSYSTEMPIPESENGLISHGERMANNOTETHISSPECIFICATIONMAYBEAPPLIEDONLYFORCURRENTPROJECTSITISSUPERCEDEDF49PDF