1、 Manufacturing StandardsFord Motor Company198207 STRAIGHT SIDE PRESSES DR-11Engineering Standards noresponsibility for this operation will be accepted by the FordCompany.The press supplier is responsible for the full installation ofall air receivers, oil tanks, etc. and must provide thenecessary fix
2、ing bolts, brackets, and support frames.The press supplier is responsible for loss or damage ofmaterial or equipment regardless of cause, until the completedmachine is accepted and handed over to production Ford MotorCompany cannot accept responsibility for the safekeeping ofany tools, tackle, or eq
3、uipment belonging to the presssupplier.A competent engineer is to be in attendance to supervise anddirect the installation of the press. The engineer should haveauthority to initiate through the offices of his company theorder or supply of equipment not supplied with the machine, orwhich has suffere
4、d damage in transit, and to organize laborrequired to correct faults found on the machine duringinstallation on site.Manufacturing StandardsFord Motor Company198207 STRAIGHT SIDE PRESSES DR-11Engineering Standards & Printed copies are uncontrolled.Systems Engineering (ESSE) Page 11 of 47All labor, t
5、ools, tackle, materials, equipment, andscaffolding, etc. required to erect the press is to beprovided by the press supplier. For safety and housekeeping onsite, the press supplier is to ensure that local nationalrequirements are complied with. These will be made availableby the Requisitioning Activi
6、ty before commencement ofinstallation.Erection can be sub-contracted to a reputable organization whoare fully experienced and equipped for this type of work.Sub-contractors general clause of contract which are contraryto the contents of this standard or the Ford contract will notbe accepted.It is th
7、e press suppliers responsibility to ensure that allequipment and work to fully erect and commission each machineis covered by their sub-contractors specifications.All fabrications, castings, etc. should be dressed to presentclean lines when assembled. The press should be thoroughlycleaned and free o
8、f rust, oil, or other foreign material, andfully prepared using filler where necessary before painting.Presses are to be painted in accordance with localrequirements.1.6.4 INSTALLATION BY OTHER THAN PRESS SUPPLIER: If the pressinstallation is to be carried out by Ford or others, the presssupplier mu
9、st provide technical representatives to assist inthe installation of presses and related equipment.1.6.5 FINAL ACCEPTANCE TESTS AND INSPECTION: The final acceptancetests for each press will be made at the designated Ford planton completion of installation. These will be comprised ofexaminations of a
10、ll functions, full dimensional checks,finish, and compliance with standards.After satisfactory testing all electrical functions, includingthe correct adjustment of limit and pressure switches, andsetting the slide(s) in the correct conditions for operatingwith respect to parallelism, vertical runnin
11、g and gibclearances, etc., electrical and mechanical service personnelin the press suppliers employ will be required to carry out a(48) hour test run.The 48 hour test run is to be made with the press control setto single stroke at 80% of its continuously rated speed,against a load of 80% of the rate
12、d tonnage. During the courseof the test run, the following items are to b checked:Manufacturing StandardsFord Motor Company198207 STRAIGHT SIDE PRESSES DR-11Engineering Standards & Printed copies are uncontrolled.Systems Engineering (ESSE) Page 12 of 47Friction block wear, temperature of clutch and
13、brake unit,bearings and air pipework, condition of gibs, lubrication, andair leaks.It is expected that on completion of the test run, allfunctions will be correctly set and adjusted, and that thepress will be fully ready for inspection and hand-over forproduction.2. MECHANICAL:2.1 RATINGS:2.1.1 LENG
14、TH OF STROKE: The stroke of a press slide (includingblankholder slide) is the actual lineal distance travelledduring the down-stroke (working stroke) from its upperposition (T.D.C.) to the bottom dead center (B.D.C.) position.2.1.2 SHUT HEIGHT: The shut height is the vertical distance (strokedown, a
15、nd slide adjustment up) between the slide surface andthe top surface of the bed bolster plate. When the press isequipped with sliding bolster, the shut height is specifiedfrom the upper surface of the sliding bolster. (See supplementPage 38).2.1.3 CLEARANCE BETWEEN UPRIGHTS: The clearance between up
16、rights isthe maximum unobstructed distance between the inside faces ofthe uprights, measured between the closest projecting items,such as gibbing, oil catchers, light fittings, etc. Thisrepresents the maximum width available for die loading.2.1.4 MAXIMUM TONNAGE: The rams or slides are to be rated f
17、ormaximum tonnage as follows:DISTANCE ABOVE BOTTOM OF STROKEEnglish System Presses Metric-System PressesRam or inner slide 12.5 mm Up (1/2“ Up) 25 mm Up (1“ Up)Outer slide 6.5 mm Up (1/4“ Up) 10 mm Up (2/5“ Up)Ram of Blanking presses 6.5 mm Up (1/4“ Up) 12.5 mm Up (1/2“ Up)2.1.5 ENERGY: The usable e
18、nergy of the press including energyrequired for cushions in accordance with its tonnage andrating distance must be available with a maximum permittedflywheel speed loss corresponding to the rated slip of themain drive.Manufacturing StandardsFord Motor Company198207 STRAIGHT SIDE PRESSES DR-11Enginee
19、ring Standards & Printed copies are uncontrolled.Systems Engineering (ESSE) Page 13 of 47Unless otherwise specified, the actual energy available forwork shall be equal to or greater than that calculated usingthe formula on Page 35. This formula assumes cushion tonnageof 1/6 rated press tonnage. Cush
20、ion tonnage in excess of thisamount will be treated as a special case.2.1.6 STROKES PER MINUTE: The rated strokes per minute f the pressare to be the number of complete cycles of the slide in oneminute, that can be maintained on a continuous basis whileusing on each stroke the maximum usable energy
21、as previouslydefined.On intermittent operation, the press has to provide 80% ofrated strokes per minute using the maximum energy on eachstroke.2.2 DEFINITIONS:2.2.1 STRAIGHT SIDED PRESS: The term “straight side press“ as usedin this specification refers to mechanical presses of tie-rodconstruction c
22、omprised of a bed, a crown, and two uprights(columns). The uprights may in fact be designed with openingsfor moving bolster equipment or other purposes, but must stillin effect comprise, with the other frame components, a rigid“box“ structure.2.2.2 SUSPENSION POINTS: Presses are also designated in t
23、erms ofthe number of suspension points. This is defined as the numberof slide connections to the eccentric drive gears. Forexample, a two point press would normally have two eccentricstrap connections to the slide. For double action presses, thenumber of suspension points is applicable to the ram.2.
24、2.3 FRONT TO BACK DRIVE: A front to back drive system is soarranged that the clutch/brake unit, eccentric gear shafts,etc., are designed so that their axis of rotation is alignedfrom front to back of the crown. Designs in which the axis ofrotation run from left to right are not acceptable withoutpri
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDDR111982WORLDWIDESTANDARDFORSINGLEANDMULTIPLEACTIONSTRAIGHTSIDEPRESSES 多动式闭式 压力机 全球 标准 PDF

链接地址:http://www.mydoc123.com/p-744784.html