DOT 49 CFR PART 179-2010 SPECIFICATIONS FOR TANK CARS.pdf
《DOT 49 CFR PART 179-2010 SPECIFICATIONS FOR TANK CARS.pdf》由会员分享,可在线阅读,更多相关《DOT 49 CFR PART 179-2010 SPECIFICATIONS FOR TANK CARS.pdf(59页珍藏版)》请在麦多课文档分享上搜索。
1、1067 Pipeline and Hazardous Materials Safety Admin., DOT Pt. 179 (6) Instrumentation. A recording potentiom-eter or other suitable instrument with an ap-propriate range must be used to measure and record the outputs of the calorimeter and the thermocouples. (7) Timing Device. A stopwatch or other de
2、-vice must be used to measure the time of flame application and the time of flame pen-etration, if it occurs. (e) Preparation of Apparatus. Before calibra-tion, all equipment must be turned on and allowed to stabilize, and the burner fuel flow must be adjusted as specified in paragraph (d)(2). (f) C
3、alibration. To ensure the proper ther-mal output of the burner the following test must be made: (1) Remove the burner extension from the end of the draft tube. Turn on the blower portion of the burner without turning the fuel or igniters on. Measure the air velocity using a hot wire anemometer in th
4、e center of the draft tube across the face of the opening. Adjust the damper such that the air velocity is in the range of 1550 to 1800 ft./min. If tabs are being used at the exit of the draft tube, they must be removed prior to this measure-ment. Reinstall the draft tube extension cone. (2) Place t
5、he calorimeter on the test stand as shown in Figure 2 at a distance of 8 inches (203 mm) from the exit of the burner cone to simulate the position of the horizontal test specimen. (3) Turn on the burner, allow it to run for 2 minutes for warm-up, and adjust the damp-er to produce a calorimeter readi
6、ng of 8.0 0.5 BTU per ft.2sec. (9.1 0.6 Watts/cm2). (4) Replace the calorimeter with the ther-mocouple rake. (5) Turn on the burner and ensure that each of the seven thermocouples reads 1700 F. 100 F. (927 C. 38 C.) to ensure steady state conditions have been achieved. If the temperature is out of t
7、his range, repeat steps 2 through 5 until proper readings are ob-tained. (6) Turn off the burner and remove the thermocouple rake. (7) Repeat (1) to ensure that the burner is in the correct range. (g) Test Procedure. (1) Mount a thermo-couple of the same type as that used for cali-bration at a dista
8、nce of 4 inches (102 mm) above the horizontal (ceiling) test specimen. The thermocouple should be centered over the burner cone. (2) Mount the test specimen on the test stand shown in Figure 1 in either the hori-zontal or vertical position. Mount the insu-lating material in the other position. (3) P
9、osition the burner so that flames will not impinge on the specimen, turn the burn-er on, and allow it to run for 2 minutes. Ro-tate the burner to apply the flame to the specimen and simultaneously start the tim-ing device. (4) Expose the test specimen to the flame for 5 minutes and then turn off the
10、 burner. The test may be terminated earlier if flame penetration is observed. (5) When testing ceiling liner panels, record the peak temperature measured 4 inches above the sample. (6) Record the time at which flame pene-tration occurs if applicable. (h) Test Report. The test report must in-clude th
11、e following: (1) A complete description of the materials tested including type, manufacturer, thick-ness, and other appropriate data. (2) Observations of the behavior of the test specimens during flame exposure such as delamination, resin ignition, smoke, etc., in-cluding the time of such occurrence
12、. (3) The time at which flame penetration occurs, if applicable, for each of the three specimens tested. 72FR55099, Sept. 28, 2007 PART 179SPECIFICATIONS FOR TANK CARS Subpart AIntroduction, Approvals and Reports Sec. 179.1 General. 179.2 Definitions and abbreviations. 179.3 Procedure for securing a
13、pproval. 179.4 Changes in specifications for tank cars. 179.5 Certificate of construction. 179.6 Repairs and alterations. 179.7 Quality assurance program. 179.8 Limitation on actions by states, local governments, and Indian tribes. Subpart BGeneral Design Requirements 179.10 Tank mounting. 179.11 We
14、lding certification. 179.12 Interior heater systems. 179.13 Tank car capacity and gross weight limitation. 179.14 Coupler vertical restraint system. 179.15 Pressure relief devices. 179.16 Tank-head puncture-resistance sys-tems. 179.18 Thermal protection systems. 179.20 Service equipment; protection
15、sys-tems. 179.22 Marking. Subpart CSpecifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114, and 120) 179.100 General specifications applicable to pressure tank car tanks. 179.1001 Tanks built under these specifica-tions shall comply with the requirements VerDate Mar2010 15:30 Dec
16、30, 2010 Jkt 220213 PO 00000 Frm 01077 Fmt 8010 Sfmt 8010 Q:49X49220213.XXX ofr150 PsN: PC150Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1068 49 CFR Ch. I (10110 Edition) Pt. 179 of 179.100, 179.101 and when applicable, 179.102 and 179.103. 179.1
17、003 Type. 179.1004 Insulation. 179.1006 Thickness of plates. 179.1007 Materials. 179.1008 Tank heads. 179.1009 Welding. 179.10010 Postweld heat treatment. 179.10012 Manway nozzle, cover and protec-tive housing. 179.10013 Venting, loading and unloading valves, measuring and sampling devices. 179.1001
18、4 Bottom outlets. 179.10016 Attachments. 179.10017 Closures for openings. 179.10018 Tests of tanks. 179.10019 Tests of safety relief valves. 179.10020 Stamping. 179.101 Individual specification require-ments applicable to pressure tank car tanks. 179.1011 Individual specification require-ments. 179.
19、102 Special commodity requirements for pressure tank car tanks. 179.1021 Carbon dioxide, refrigerated liquid. 179.1022 Chlorine. 179.1023 Materials poisonous by inhalation. 179.1024 Vinyl fluoride, stabilized. 179.10217 Hydrogen chloride, refrigerated liquid. 179.103 Special requirements for class 1
20、14A * * * tank car tanks. 179.1031 Type. 179.1032 Manway cover. 179.1033 Venting, loading and unloading valves, measuring and sampling devices. 179.1034 Safety relief devices and pressure regulators. 179.1035 Bottom outlets. Subpart DSpecifications for Nonpressure Tank Car Tanks (Classes DOT-111AW a
21、nd 115AW) 179.200 General specifications applicable to non-pressure tank car tanks (Class DOT 111). 179.2001 Tank built under these specifica-tions must meet the requirements of 179.200, and 179.201. 179.2003 Type. 179.2004 Insulation. 179.2006 Thickness of plates. 179.2007 Materials. 179.2008 Tank
22、heads. 179.2009 Compartment tanks. 179.20010 Welding. 179.20011 Postweld heat treatment. 179.20013 Manway ring or flange, pressure relief device flange, bottom outlet nozzle flange, bottom washout nozzle flange and other attachments and openings. 179.20014 Expansion capacity. 179.20015 Closures for
23、manways. 179.20016 Gauging devices, top loading and unloading devices, venting and air inlet devices. 179.20017 Bottom outlets. 179.20019 Reinforcements, when used, and appurtenances not otherwise specified. 179.20021 Closures for openings. 179.20022 Test of tanks. 179.20023 Tests of pressure relief
24、 valves. 179.20024 Stamping. 179.201 Individual specification require-ments applicable to non-pressure tank car tanks. 179.2011 Individual specification require-ments. 179.2012 Reserved 179.2013 Lined tanks. 179.2014 Material. 179.2015 Postweld heat treatment and cor-rosion resistance. 179.2016 Manw
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT49CFRPART1792010SPECIFICATIONSFORTANKCARSPDF

链接地址:http://www.mydoc123.com/p-702055.html