DLA MIL-PRF-1 1589 E-2012 ELECTRON TUBE KLYSTRON TYPE 8237.pdf
《DLA MIL-PRF-1 1589 E-2012 ELECTRON TUBE KLYSTRON TYPE 8237.pdf》由会员分享,可在线阅读,更多相关《DLA MIL-PRF-1 1589 E-2012 ELECTRON TUBE KLYSTRON TYPE 8237.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-PRF-1/1589E 17 January 2012 SUPERSEDING MIL-PRF-1/1589D(NAVY) 12 July 1999 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, KLYSTRON TYPE 8237 * This specification is approved for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the electron tube de
2、scribed herein shall consist of this document and the latest issue of MIL-PRF-1. DESCRIPTION: Amplifier, pulsed, 2,900 to 3,100 MHz. ABSOLUTE RATINGS: Parameter: Unit: Ef V ac if (surge) a tk minutes I(focus) A epy kv epx kv ik a Ik mA Pi kW Du - Maximum: Minimum: 7.88 7.12 54 - - 12 6.0 3.8 23/ 105
3、 - 2/ 30 - 68 - 285 - 24 - 0.0042 - 4/ Parameter: Unit: Po kW tp s prr pps VSWR - T(outlet coolant) C Coolant flow (distilled water) GPM Coolant flow (60/40 ethylene glycol) GPM Maximum: Minimum: 6.72 - 11 - 3/ 2,000 - 2.5:1 - 85 - 7/ Collector - 4 Body - 0.625 Collector - 8 Body - 2 Parameter: Unit
4、: Waveguide pressurization (dry air) psia Hydrostatic pressure psig TA C TA C Maximum: Minimum: 55 24 200 - Operating +85 -20 Nonoperating +85 -62 7/ PHYSICAL CHARACTERISTICS: Base: Mounting: Weight: Special (See figure 1). 5/ 130 pounds (max). Input: Output: Dimensions: Coaxial connector UG-972/U.
5、“S“ band waveguide. See figure 1. TEST CONDITONS: Parameter: Unit: Ef Vac tk minutes I(focus) A epy kv pd - tp s Du(rf) - VSWR - Coolant flow (distilled water) GPM Tolerance: - minimum - 5 - 1 - - - Collector Body Test 1: 7.5 12 23/ 90 15/ 10 0.0042 1.2:1 6.0 1.5 Test 2: 7.8 12 23/ 96 2/ 15/ 10 3/ 0
6、.0039 4/ 1.5:1 6.0 1.5 See footnotes at end of table I. _ GENERAL: Qualification - Not required. This specification sheet uses accept on zero defect sampling in accordance with MIL-PRF-1, table III. _ * Replaces types: VA811C, L-3742. AMSC N/A FSC 5960 INCH-POUND Provided by IHSNot for ResaleNo repr
7、oduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1589E 2 TABLE I. Testing and inspection. Method Limits Inspection MIL-STD-1311 Notes Test Conditions Symbol Min Max Unit Conformance inspection, part 1 Pressurizing (waveguide) 4003 1/ 8/ - Method A; 55 psia; t = 900 - - - - Hyd
8、rostatic pressure - 8/ - 140 psig; collector and body inlet closed - - - - Forced cooling (pressure drop) 1143 - - 4 GPM to collector 1 GPM to body (distilled water) P P 6 4 20 20 psia psia Heater current, nonoperating 4289 - - Ef = 7.5 V; tk = 720 (minimum) If 27 38 A Electrode current (cathode) 12
9、56 - 1 pd = 0 ik 49.6 58.4 a Power output 4250 6/ 14/ 1 F = 2,910 to 3,100 MHz po - - kw Output power variation (1) 4251 21/ 1 pd = 1 dB from the identification plate value; F = 2,980 to 3,100 MHz po(1) - - kw Output power variation (2) 4251 9/ 21/ 1 I(focus) = 2 percent from identification plate va
10、lue po(2) - - kw Cathode emission 4214 17/ 1 pd = 0 ik/ik - 10 % Stability 4261 - 1 pd = 0 po - 2 w X-radiation 4006 14/ 16/ 1 - - 3 mr/hr Conformance inspection, part 2 Permanence of marking 1105 - - - - - - Output power variation (3) 4251 22/ 1 epy = 90 kv +3 to -7 percent po(3) - - kw Direct-inte
11、relectrode capacitance 4266 13/ - Cak - 30 pF Internal arc - 19/ 2 F = 2,980 to 3,100 MHz - - - - Conformance inspection, part 3 Life test - 6/ 1 Group D t 1,000 - hrs Life test end-point: Power output - 4250 - 1 2,980 to 3,100 MHz po 800 - kw See footnotes at end of table. Provided by IHSNot for Re
12、saleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1589E 3 TABLE I. Testing and inspection - Continued. Method Limits Inspection MIL-STD-1311 Notes Test Conditions Symbol Min Max Unit Conformance inspection, part 3 - Continued Low-frequency vibration 1031 10/ 18/ 24/
13、- No voltages applied - - - - Variable-frequency vibration 1031 10/ 18/ 24/ - No voltages applied - - - - Vibration fatigue 1031 18/ 24/ - Ef = 7.5 V - - - - Shock, specified pulse 1042 12/ 18/ 24/ - 10 G; t = 11 ms; no voltages applied - - - - Humidity 1011 18/ 24/ - t = 96 hours - - - - Ion pumps
14、4268 11/ 18/ - - - - - Heater resistance, cold - 18/ - - 0.023 0.030 Ohms Waveguide arc - 18/ 20/ 1 VSWR = 1.5:1 - - - - 1/ Inspection shall be 100 percent. 2/ Any short transient spike on the voltage pulse shall not exceed 115 kv in magnitude. 3/ The pulse duration (tp) is defined as the time inter
15、val between the first and last instances at which the instantaneous amplitude attains 90 percent of the peak amplitude excluding spikes. 4/ One scan cycle shall consist of rf pulses of 10, 4.6, or 2.5 s programmed within the following limits: a. The maximum instantaneous duty cycle (defined as d/D,
16、where d = pulse width in seconds and D = time separation in seconds between the leading edges of two successive pulses) shall be 0.011. b. The scan cycle program shall be such that the average duty cycle shall not exceed 0.0042 over the scan cycle which shall have a maximum duration of 30,000 s. 5/
17、The tube under test (TUT) shall be mounted with its beam axis within 30 degrees of the vertical. A flexible length of waveguide or other equivalent connection shall be provided between the TUT output flange and load or output waveguide system to prevent excessive forces from being applied to the out
18、put flange. The cathode stem shall be immersed in oil as shown on figure 1. 6/ The TUT shall amplify frequencies over the band from 2,910 to 3,100 MHz without any change of the electrical or mechanical parameters. Further, in setting up for the conformance inspection, part 1 tests, the focus coil cu
19、rrents, the drive power, and other parameters (within their specific ranges), shall be adjusted to the values specified herein. Once adjustment values are set, no further change in values shall be allowed. 7/ During storage and extended nonoperating periods, the coolant shall be removed to avoid dam
20、age to the tube and cooling paths shall be dried and sealed. 8/ There shall be no leakage at maximum limit specified herein. 9/ The TUT shall provide the power output specified herein when each coil current is varied 2 percent of the value specified on the identification plate. All coil current shal
21、l be varied simultaneously in the same polarity. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1589E 4 TABLE I. Testing and inspection - Continued. 10/ The TUT shall be vibrated in each of two planes specified below: a. Where the orientat
22、ion of the TUT has the main axis and major cross section of the TUT elements normal to the direction of the accelerating force. b. Where the orientation of the TUT has the main axis of the TUT normal and the major cross section parallel to the accelerating force. 11/ The Vacion pump, or equivalent,
23、shall have the following ratings: ABSOLUTE RATINGS: Unit: kV mA V(pk ripple) Maximum: 3.2 10 108 Minimum: - - - Absolute ratings for the pump apply during all conditions. The pump current is proportional to the voltage applied and the pressure in the pump. The pump is operative when the applied volt
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLAMILPRF11589E2012ELECTRONTUBEKLYSTRONTYPE8237PDF

链接地址:http://www.mydoc123.com/p-691998.html