DIN 1961-2016 German construction contract procedures (VOB) - Part B General conditions of contract relating to the execution of construction work《德国建筑工程主管承包条例(VOB) 第B部分 建筑工程施工的通用合.pdf
《DIN 1961-2016 German construction contract procedures (VOB) - Part B General conditions of contract relating to the execution of construction work《德国建筑工程主管承包条例(VOB) 第B部分 建筑工程施工的通用合.pdf》由会员分享,可在线阅读,更多相关《DIN 1961-2016 German construction contract procedures (VOB) - Part B General conditions of contract relating to the execution of construction work《德国建筑工程主管承包条例(VOB) 第B部分 建筑工程施工的通用合.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、September 2016 English price group 9No part of this translation may be reproduced without prior permission ofDIN Deutsches Institut fr Normung e. V., Berlin. Beuth Verlag GmbH, 10772 Berlin, Germany,has the exclusive right of sale for German Standards (DIN-Normen).ICS 91.010.20!%2U“2561550www.din.de
2、DIN 1961German construction contract procedures (VOB) Part B: General conditions of contract relating to the execution of construction work,English translation of DIN 1961:2016-09VOB Vergabe- und Vertragsordnung fr Bauleistungen Teil B: Allgemeine Vertragsbedingungen fr die Ausfhrung von Bauleistung
3、en,Englische bersetzung von DIN 1961:2016-09Cahier des charges allemand pour des travaux de btiment (VOB) Partie B: Clauses gnrales pour lexcution des travaux de btiment,Traduction anglaise de DIN 1961:2016-09SupersedesDIN 1961:2012-09www.beuth.deDocument comprises 28 pagesDTranslation by DIN-Sprach
4、endienst.In case of doubt, the German-language original shall be considered authoritative.09.16 DIN 1961:2016-09 2 Contents Page Foreword 3 German construction contract procedures Part B (VOB/B) Notes on VOB/B, 2016 edition 5 VOB/B: General conditions of contract relating to the execution of constru
5、ction work 7 1 Nature and extent of work . 7 2 Remuneration . 7 3 Documentation . 9 4 Execution of work . 10 5 Periods of completion of work . 13 6 Hindrance and interruption of work . 14 7 Distribution of risk . 15 8 Termination by client 15 9 Termination by contractor . 17 10 Liabilities of contra
6、cting parties . 17 11 Penalties 18 12 Acceptance . 19 13 Warranty claims 20 14 Settlement of accounts . 22 15 Hourly wage work . 22 16 Payment . 23 17 Surety . 25 18 Disputes . 27 DIN 1961:2016-09 3 Foreword This document has been prepared by the Deutscher Vergabe- und Vertrags-aussschuss fr Bauleis
7、tungen (DVA) (German Committee for Construction Contract procedures). Amendments This standard differs from DIN 1961:2012-09 as follows: a) the document has been revised in form and content to reflect developments in the construction sector. The original German text of the document has been adapted
8、so as to be identical with VOB Part B in the version printed in the 2016 Bundesanzeiger (Federal Gazette).*)b) the primary reason for this revision of VOB/B (DIN 1961) was to implement Articles 71 and 73 of Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on pub
9、lic procurement; c) in 4 clause (7) sentence 3, and clause (8) no. 1 sentence 4, the words “to withdraw the contract if, on expiration of the deadline.” have been replaced by the words “to terminate the contract if, on expiration of the deadline.”; d) 4 clause (8) no. 3 now reads as follows: “3. The
10、 contractor shall provide the client, without being requested to do so, with the name(s) of his subcontractors and their subcontractors, including their legal representatives and contact information, no later than the time at which the subcontractor(s) begin(s) to work. At the clients request, the c
11、ontractor shall submit descriptions and proof of the suitability of his subcontractors”; e) in 5 clause (4), the words “to withdraw the contract if, on expiration of the deadline, the contract has not been duly fulfilled” have been replaced by the words “to terminate the contract if, on expiration o
12、f the deadline, the contract has not been duly fulfilled”; f) in 8 clause (3) no. 1 sentence 1, the text in parentheses “(withdrawal of contract)” has been deleted; g) in 8 clause (3) no. 1 sentence 2, and no. 2 sentences 1 and 2, the words *)https:/www.bundesanzeiger.de DIN 1961:2016-09 4 “withdraw
13、al of the contract” have been replaced by “termination of the contract”; h) 8 clause (4) now reads as follows: “The client may terminate the contract, 1. if the contractor has, to gain the contract, entered into a price agreement which amounts to an unacceptable restraint of competition. Clause (3)
14、no. 1 sentence 2, and nos. 2 to 4 shall apply accordingly. 2. where this has been included in the scope of Part 4 of the Gesetz gegen Wettbewerbsbeschrnkungen (GWB) (German Act Against Restraints of Competition), a) if, due to grounds for a compulsory exclusion that existed at the time contracts wer
15、e awarded, the contractor should not have been awarded the contract. Clause (3) no. 1 sentence 2, and nos. 2 to 4 shall apply accordingly. b) where considerable changes have been made to the contract or where a serious breach of the Treaty on European Union (TEU) and the Treaty on the Functioning of
16、 the European Union (TFEU) has been established by the European Court of Justice. The work actually executed shall then be paid for in accordance with 6 clause (5). Any claims for damages by either party shall remain unaffected. Notice of termination shall be given within twelve working days after d
17、isclosure of the reason for such termination.”; i) after 8 clause (4), a new clause, clause (5), has been added: “Where, regardless of the scope of Part 4 of the Gesetz gegen Wettbewerbsbeschrnkungen (GWB) (German Act Against Restraints of Competition), the contractor has assigned the work, in whole
18、 or in part, to a subcontractor, then the contractor also has the right to terminate that contract in accordance with clause (4) no. 2 b), if the contract naming him as the contractor (main contract) has been terminated in accordance with clause (4) no. 2 b). The same applies to each client along th
19、e chain of subcontractors, where that clients respective client has terminated the contract in accordance with sentence 1.”; j) clauses (5), (6) and (7) of 8 are now clauses (6), (7) and (8). Previous editions DIN 1961: 1926-05, 1934-08, 1937-01, 1937-06, 1952x-11, 1973-11, 1979-10, 1988-09, 1990-07
20、, 1992-12, 1996-06, 1998-05, 2000-12, 2002-12, 2006-10, 2010-04, 2010-08, 2012-09 DIN 1961:2016-09 5 German construction contract procedures Part B (VOB/B) Notes on VOB/B, 2016 edition In implementing Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public pr
21、ocurement into German law, the Deutscher Vergabe- und Vertragsaussschuss fr Bauleistungen (DVA) (German Committee for construction contract procedures) decided to modify VOB/B (DIN 1961) not only to ensure the provisions relating to public procurement laid down in Directive 2014/24/EU are implemente
22、d in German procurement law, but also to incorporate into VOB/B (DIN 1961) the legal provisions relating to contracts laid down in Articles 71 and 73 of Directive 2014/24/EU. Reasons for each provision are given below: Re 4 clause (8) no. 3 VOB/B This new wording incorporates into VOB/B (DIN 1961) t
23、he provisions laid down in Article 71 (5) subparagraphs 1, 2, 3 and 4 b) of Directive 2014/24/EU. Re 8 clauses 4 and 5 VOB/B The change in clause (4) reflects the addition of 133 to the Gesetz gegen Wettbewerbsbeschrnkungen (GWB), which implements Article 73 of Directive 2014/24/EU. The new grounds
24、for an extraordinary termination of contract by the client as standardized here, and the legal consequences of such a termination as regards remuneration and payment of damages have been incorporated into VOB/B (DIN 1961) and integrated into the existing catalogue of grounds for termination and cons
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DIN19612016GERMANCONSTRUCTIONCONTRACTPROCEDURESVOBPARTBGENERALCONDITIONSOFCONTRACTRELATINGTOTHEEXECUTIONOFCONSTRUCTIONWORK

链接地址:http://www.mydoc123.com/p-654417.html