1、BSI Standards PublicationGuide for life cycle costing of maintenance during the in use phases of buildingsBS 8544:2013ENDOFLIFEDESIGNCONSTRUCTIONMAINTAINPLANNINGRENEWALBS 8544:2013 BRITISH STANDARDPublishing and copyright informationThe BSI copyright notice displayed in this document indicates when
2、the document was last issued. The British Standards Institution 2013. Published by BSI Standards Limited 2013ISBN 978 0 580 71085 8ICS 91.040.01The following BSI references relate to work on this document: Committee reference CB/101 Draft for comment 12/30218913 DCPublication historyFirst published
3、September 2013Amendments issued since publicationDate Text affected The British Standards Institution 2013 iBS 8544:2013BRITISH STANDARDContentsForeword iii0 Introduction 11 Scope 22 Normative references 33 Terms, definitions and abbreviations 44 Process and applications 105 Guiding principles and i
4、nstructions 126 Methods, rules and techniques for identifying, prioritizing and presenting the LCC plans 237 Maintenance costs for inclusion or exclusion and how to express them 338 Interoperability of LCC of maintenance with BIM 489 Information sources and data required to undertake LCC of maintena
5、nce 5010 Informing the decision-making process 55AnnexesAnnex A (informative) Example of standardized and integrated asset data structure 60Annex B (informative) Examples of methods, rules and techniques 64Annex C (informative) Menu and cost mapping to various standards and classification structures
6、 71Annex D (informative) Example of methods of economic evaluations, discount techniques and equations used for LCC of maintenance works 76Annex E (informative) Example of a LCC risk log and mitigation guidance 78Annex F (informative) Information and data assumptions used for undertaking LCC of main
7、tenance 82Bibliography 95List of figuresFigure 1 Life cycle costing during the various phases of a facilitys life 1Figure 2 Key stages of life cycle costing of maintenance 2Figure 3 Key stages and steps for LCC of maintenance 13Figure 4 Maintenance costs (renewal and maintain), as part of the wider
8、LCC 34Figure 5 Alignment of NRM 1 cost data structure 1 with COBIE data structure (BIM) 49Figure 6 Information sources and data required to undertake LCC of maintenance 51Figure A.1 Example of a portfolio level data structure 61Figure A.2 Example of elemental levels linked to a maintainable asset da
9、ta structure 62Figure A.3 Example of elemental, sub elemental and component level aligned to a maintainable assets data structure and service life codes 63Figure B.1 Example of asset criticality-based prioritization of maintenance expenditure (by priority 1, 2 and 3) 66Figure B.2 ACR and PARL method
10、s 67Figure B.3 Formula for FCI for rating how assets are performing 68Figure B.4 Example of FCI benchmarking by function types over a number of establishments: graphical summary 70Figure C.1 Menu for scoping the costs included in LCC of maintain and renewal works with links to the construction cost
11、categories 72List of tablesTable 1 Key constituents of maintenance work cost estimates and cost plans 34Table 2 Cost breakdown structure for maintenance and wider LCC 35Table 3 Key LCC metrics for maintain and LCR 47Table 4 Examples of factoring the RSL 54BS 8544:2013ii The British Standards Institu
12、tion 2013BRITISH STANDARDTable B.1 Example: how to prioritize the PPM maintenance service levels, by using the ACR method 65Table B.2 Example of method and rules of condition categories, descriptions and definitions 67Table B.3 Example of FCI: summary output by size and function type over a 5 and 10
13、 year period 69Table C.1 Cost mapping BS 8544 to PD 156865 and BS ISO 15686-5 73Table C.2 Cost mapping BS 8544 to the ITOC codes and the RICS service charging cost structures 74Table C.3 Cost mapping BS 8544 to BS EN 15643-4: building life cycle information 75Table E.1 General risks log applicable t
14、o all elements of LCC of maintenance 78Table F.1 Information for the brief and capture stages 82Table F.2 Information for the evaluate and implement stages 88Summary of pagesThis document comprises a front cover, an inside front cover, pages i to iv, pages 1 to 96, an inside back cover and a back co
15、ver. The British Standards Institution 2013 iiiBS 8544:2013BRITISH STANDARDForewordPublishing informationThis British Standard is published by BSI Standards Limited, under licence from The British Standards Institution, and came into effect on 30 September 2013. It was prepared by Technical Committe
16、e CB/101, Service life planning. A list of organizations represented on this committee can be obtained on request to its secretary.The initial drafting of this British Standard was produced in association with BIS as part of their ongoing programme of support for standardization.Relationship with ot
17、her publicationsThis British Standard is the second supplementary guide to BS ISO 15686-5. The first supplementary guide is PD 156865, which covers the life cycle cost during construction projects.Information about this documentThe guidance in this British Standard is aligned with industry cost plan
18、ning data structures and methodology given in the RICS New Rules of Measurement (NRM) 1 1.This British Standard gives an approach to life cycle costing that places the focus on maintenance costs.Clause 4 and Clause 5 describe the integrated LCC processes, key stages and the guiding principles and in
19、structions for undertaking LCC of maintenance works. Clause 5 details how to undertake the cyclical process of LCC of maintenance through each of its stages and how this can be periodically updated throughout the in use phases of a building, facility or constructed asset. Clause 6 describes various
20、methods, rules and techniques used in the process to agree the brief and subsequently plan, capture, evaluate, implement and review the LCC for maintenance works. Clause 7 categorizes and defines which maintenance costs to include or exclude and how to express them; it also provides a maintenance br
21、eakdown structure and cost categorization definitions. Clause 8 provides guidance on how the building data should be structured and classified to be interoperable with BIM data exchange formats. Clause 9 gives advice regarding the applicable information sources and data required to cost maintain and
22、 renewal works during the in use phases. Clause 10 provides practical guidance on how to inform the decision-making processes; it also helps the user to input information into other economic evaluations relating to wider property estate asset management and maintenance strategies.Use of this documen
23、tAs a guide, this British Standard takes the form of guidance and recommendations. It should not be quoted as if it were a specification or a code of practice and claims of compliance cannot be made to it.Presentational conventionsThe guidance in this standard is presented in roman (i.e. upright) ty
24、pe. Any recommendations are expressed in sentences in which the principal auxiliary verb is “should”.Commentary, explanation and general informative material is presented in smaller italic type, and does not constitute a normative element.BS 8544:2013iv The British Standards Institution 2013BRITISH
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS85442013GUIDEFORLIFECYCLECOSTINGOFMAINTENANCEDURINGTHEINUSEPHASESOFBUILDINGS 建筑 使用 阶段 期间 生命周期 维护 成本

链接地址:http://www.mydoc123.com/p-547481.html