《ASTM F2985-2014 Standard Practice for Installation of a PVC Segmental Panel Liner System in Man-Entry Size Sewers and Conduits《成人可进入下水道和管涵中PVC分段面板沉淀系统安装的标准实践规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2985-2014 Standard Practice for Installation of a PVC Segmental Panel Liner System in Man-Entry Size Sewers and Conduits《成人可进入下水道和管涵中PVC分段面板沉淀系统安装的标准实践规程》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F2985 14Standard Practice forInstallation of a PVC Segmental Panel Liner System in Man-Entry Size Sewers and Conduits1This standard is issued under the fixed designation F2985; the number immediately following the designation indicates the year oforiginal adoption or, in the case of rev
2、ision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 The practice describes the procedures for the rehabili-tation of gravity pipes, culverts, tunnels,
3、and conduits by theinstallation of a field-fabricated PVC liner system. Afterinstallation of the liner system, cementitious grout is pumpedinto the annular space between the liner and the host structure.The rehabilitation of the host structure by this installationpractice results in a rigid composit
4、e structure (PVC liner/grout/existing pipe). This type of rehabilitation process is suitable fora variety of gravity pipe applications such as storm sewers,sanitary sewers, and culverts; and with geometries includingcircular, egg, ovoid, elliptical, arch, and site-specific compositeshapes.1.2 The va
5、lues stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated wit
6、h its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C109/C109M Test Method for Compressive Strength ofHydraulic Cement
7、Mortars (Using 2-in. or 50-mm CubeSpecimens)C827/C827M Test Method for Change in Height at EarlyAges of Cylindrical Specimens of Cementitious MixturesF2984 Specification for Segmental Panel System for theGrout-in-Place-Liner (GIPL) Rehabilitation Method ofExisting Man-Entry Size Sewers, Culverts, an
8、d Conduits3. Terminology3.1 Definitions:3.1.1 cementitious grout, nthe cementitious grout materialis a mixture of Type B Portland cement, sand, and variousadmixtures designed to perform in a wet environment.3.1.2 panel assembly hardware, nthe connecting longscrew rods, bolts, and nuts made from carb
9、on steel meetingSAEs classification No. 1020 with uni-chrome plating.3.1.2.1 DiscussionThe uni-chroming process depositschromium onto the surface of the steel producing ananticorrosion, crack-free barrier that is compliant with thestrain properties of the steel.3.1.3 PVC liner, na tubular assembly f
10、ield fabricated frominjection molded PVC profile wall segments which are boltedtogether to form circumferential rings which are then joinedtogether such that some portion of the entire inner circumfer-ence of the host structure is isolated from the fluid beingtransported.3.1.4 PVC segmental panels,
11、nan injection molded ele-ment available in various geometries, consisting of a smoothinner surface and a ribbed outer surface (profile) with edgeconfigurations to allow precise mechanical locking and sealingof adjacent panels.4. Significance and Use Summary of Practice4.1 This practice is for use by
12、 engineers and ownersinvolved in the rehabilitation of gravity piping, conduits, andsmall-scale tunnels. This practice conveys the necessary globalinformation for the proper installation of a grout in place linersystem that can lead to a full restoration of the original hostsoil-structure interactio
13、n system when properly designed by thelocal practicing engineer. In addition, this practice will alsoprovide guidance to the design professional on how to addressany modifications that must be made for any unique site-specific job conditions.5. Materials5.1 The injection-molded PVC panel segments an
14、d relatedsmall parts used for the field fabrication of the PVC liner shallmeet the requirements in Specification F2984. The injection-molded PVC panel segments shall be sufficiently translucent soas to allow grout filling operations to be visually monitored.1This practice is under the jurisdiction o
15、f ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.67 onTrenchless Plastic Pipeline Technology.Current edition approved Dec. 1, 2014. Published January 2015. DOI: 10.1520/F2985-142For referenced ASTM standards, visit the ASTM website, www.astm.org, orc
16、ontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States15.2 The adhesive/sea
17、lant used in the joining process of thepanel pieces shall be polyurethane, mono-liquid, moisturesetting type flexible gasket material.5.3 The panel assembly hardware shall consist of carbonsteel bolts, threaded rods, and nuts (long and standard) meetingthe SAE classification 1020 that have been plat
18、ed using theunichrome process or an approved equal.5.4 The cementitious grout shall be a self-consolidatingmixture of Type B Portland cement, sand, and various admix-tures (shrinkage resistant and water-reducing agent, anti-foaming agent and viscosity promoter) that is displaysinseparable, constant,
19、 and insoluble characteristics when in thepresence of water. Grout mixtures that bleed are not acceptable.Maximum particle size of the sand used shall be 0.047 in. (1.2mm). The cementitious grout shall exhibit no shrinkage beforeor after hardening when measured in accordance with TestMethod C827/C82
20、7M. The compressive strength of the groutshall be a minimum of 5000 psi at 28 days or as required perthe design of the composite liner system for the site-specificconditions encountered.6. Installation6.1 Cleaning and Inspection:6.1.1 Prior to entering access areas such as manholes andperforming ins
21、pection or cleaning operations, an evaluation ofthe atmosphere to determine the presence of toxic or flammablevapors or lack of oxygen shall be undertaken in accordancewith local, state, and federal safety and confined space entryregulations.6.1.2 Cleaning of PipelineInternal debris shall be re-move
22、d from the existing pipeline. Additionally, the wallsurfaces shall be water blasted using a minimum of 3000 psi atthe nozzle held at a distance of 6 in. (152.4 mm) to ensure thatthe exposed wall is free from contamination of foreign mate-rials and corrosion products and that the resultant surface th
23、atthe grout will bond to is hard, competent material.6.1.3 Inspection of the PipelineInspection of the pipelineor structure shall be performed by experienced personneltrained in locating and identifying conditions that must beaddressed in the design of the grout in place liner system.Specifically, t
24、he interior of the pipe or structure shall becarefully inspected to determine the location of any conditionsthat may prevent or adversely impact proper installation of thePVC liner such as protruding service connections, missingbrick or pipe wall pieces, variations in horizontal and verticalalignmen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF29852014STANDARDPRACTICEFORINSTALLATIONOFAPVCSEGMENTALPANELLINERSYSTEMINMANENTRYSIZESEWERSANDCONDUITS

链接地址:http://www.mydoc123.com/p-539859.html