ASTM F2536-2006b Standard Guide for Installing Plastic DWV Piping Suspended from On-Grade Slabs《安装悬浮在高级厚板上塑料排气管道的标准指南》.pdf
《ASTM F2536-2006b Standard Guide for Installing Plastic DWV Piping Suspended from On-Grade Slabs《安装悬浮在高级厚板上塑料排气管道的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2536-2006b Standard Guide for Installing Plastic DWV Piping Suspended from On-Grade Slabs《安装悬浮在高级厚板上塑料排气管道的标准指南》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2536 06bStandard Guide forInstalling Plastic DWV Piping Suspended from On-GradeSlabs1This standard is issued under the fixed designation F 2536; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revisi
2、on. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.Note Sections 2 and 5 were revised from the previous 2006a version and the year date was changed on Sept. 29, 2006.1. Scope1.1 This guide pr
3、ovides procedures for the installation ofDWV piping in buildings that are built where soil conditionsrequire the use of pier or piling supported grade beamconstruction or in filled ground where the soil compaction isless than 95 %. These procedures are intended to ensure thatthe DWV piping suspended
4、 from the on grade concrete slabs isnot damaged or destroyed by movement of the soil or fill underthe slab after the building is completed and occupied.1.2 In this type of construction, the area within the gradebeams is filled with soil up to a level that allows the concreteslab to be poured directl
5、y on the fill without a supporting form.In this process the sanitary waste piping is installed bytrenching into the fill, and then putting hangers with supportrods on the pipes as they are installed. The hanger rodsextending upward must be long enough so that the top of therod will be embedded in an
6、d anchored in the concrete.1.3 The hanger rods are intended to provide adequatestrength and corrosion resistance to assure long term service.1.4 The details of installation are intended to ensure that therods remain vertical, that they extend into the concrete anadequate amount and that the upper en
7、ds are terminated so thatthey have adequate “pull out”strength.1.5 The details of backfill are intended to limit or minimizethe loads on the a suspended piping. These loads result fromconsolidation or movement of the soil/fill beneath the slab.1.6 This standard does not purport to address all of the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF25362006BSTANDARDGUIDEFORINSTALLINGPLASTICDWVPIPINGSUSPENDEDFROMONGRADESLABS 安装 悬浮 高级 厚板 塑料 排气 管道

链接地址:http://www.mydoc123.com/p-538936.html