ASTM F2454-2005(2016)e1 Standard Practice for Sealing Lateral Connections and lines from the mainline Sewer Systems by the Lateral Packer Method Using Chemical Grouting《使用化学灌浆通过侧向封.pdf
《ASTM F2454-2005(2016)e1 Standard Practice for Sealing Lateral Connections and lines from the mainline Sewer Systems by the Lateral Packer Method Using Chemical Grouting《使用化学灌浆通过侧向封.pdf》由会员分享,可在线阅读,更多相关《ASTM F2454-2005(2016)e1 Standard Practice for Sealing Lateral Connections and lines from the mainline Sewer Systems by the Lateral Packer Method Using Chemical Grouting《使用化学灌浆通过侧向封.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F2454 05 (Reapproved 2016)1Standard Practice forSealing Lateral Connections and lines from the mainlineSewer Systems by the Lateral Packer Method, UsingChemical Grouting1This standard is issued under the fixed designation F2454; the number immediately following the designation indicates
2、 the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEEditorial changes were made throughout in May 2016.INT
3、RODUCTIONThe infiltration of water in sanitary sewer systems through the lateral service connection and thefirst few joints of the lateral below the groundwater table is a major problem for collection systemowners. The combined length of the lateral services often exceeds the length of the mainline
4、sewers.Often, the lateral services have been built with little or no supervision and little or no above-groundaccess for monitoring and inspection.1. Scope1.1 This practice covers the procedures for testing andsealing sewer lateral connections and lateral lines from themainline sewer with appropriat
5、e chemical grouts using thelateral packer method. Chemical grouting is used to stopinfiltration of ground water and exfiltration of sewage ingravity flow sewer systems that are structurally sound.1.2 This practice applies to mainline sewer diameters of 6 to24 in. with 4, 5, or 6 in. diameter lateral
6、s. Larger diameter pipeswith lateral connections and lines can be grouted with specialpackers or man-entry methods. The mainline and lateral pipesmust be structurally adequate to create an effective seal.1.3 Worker safety training should include reviewing thebiohazards and gases from sewage, confine
7、d spaces, pumpingequipment, and related apparatus. Additional safety consider-ations including proper handling, mixing, and transporting ofchemical grouts should be provided by the chemical groutmanufacturer or supplier, or both. Their safe operating prac-tices and procedures should describe in deta
8、il appropriatepersonal protective equipment (PPE) for the various groutingoperations. Operations covered should include the properstorage, transportation, mixing, and disposal of chemicalgrouts, additives, and their associated containers.1.4 The values stated in inch-pound units are to be regardedas
9、 standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of th
10、is standard to establish appro-priate safety and health practices and to determine theapplicability of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2F2304 Practice for Sealing of Sewers Using ChemicalGrouting2.2 NASSCO Standard:3NASSCO Specification Guidelines Wastew
11、ater CollectionSystem Maintenance and Rehabilitation, 20033. Significance and Use3.1 The inspection, testing, and repair of lateral connectionsfor sanitary sewers are regular practice necessary for themaintenance and optimal performance of the system. It isimportant to identify methods that use the
12、most currentcompounds and technology to ensure the reduction of infiltra-tion and exfiltration. It is important to minimize disruption to1This practice is under the jurisdiction of ASTM Committee F36 on Technologyand Underground Utilities and is the direct responsibility of Subcommittee F36.20on Ins
13、pection and Renewal of Water and Wastewater Infrastructure.Current edition approved April 1, 2016. Published May 2016. Originallyapproved 2005. Last previous edition approved in 2010 as F2454 05(2010). DOI:10.1520/F2454-05R16E01.2For referenced ASTM standards, visit the ASTM website, www.astm.org, o
14、rcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from National Association of Sewer Service Companies (NASSCO),Inc., 2470 Longstone Lane, Suite M, Marriottsville, MD 2110
15、4, http:/www.nassco.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1traffic and lessen the environmental impacts for both themunicipal and private owners.3.2 This practice serves as a means to inspect, test, and sealsewer lateral
16、connections and a predetermined portion of thelateral lines from the mainline sewer, having selected theappropriate chemical grouts using the lateral packer method.Television (or optical) inspection and sewer lateral connectiontesting are used to assess the condition and document anyrepairs.3.3 This
17、 practice should not be used where mainline andlateral connections are found with longitudinally cracked pipe,structurally unsound pipe, or flattened or out of round pipe.4. Contract Responsibilities4.1 The lateral connection sealing contracts should define oraffix responsibility for, or make provis
18、ions for, the followingitems:4.1.1 Notice of Client/Owner Requirements, which are rel-evant to, and within the scope of, work to be performed underthe contract.4.1.2 Municipal and Other Licenses and Permits, (seePractice F2304) and assistance in obtaining approvals orconsent from utilities or carrie
19、rs or other persons or organiza-tions upon whose property or authority might be impinged bythe performance of work under the contract; or a writtenrelease from responsibility for the performance of work underthe contract if and to the extent that such work is precluded bythe inability to obtain appr
20、ovals or consent. If working onprivate property permission from the owners representative,the sewer line owner and the building department.4.1.3 Access to Site of Work, to be provided to the extent thatthe owner is legally able to do so, if unable to, a written releasefrom responsibility for the per
21、formance of work at sites whereaccess cannot be made available.4.1.4 Clearances of Blockages or Obstructions, in the sewersystem, if any, if such clearance is required for performance ofwork under the contract and if such clearance is not otherwiseprovided for within the contract.4.1.5 Location and
22、Exposure of All Manholes, unless other-wise provided for in the technical specifications of the contract.4.1.6 A Manhole Numbering System, for all areas of theproject, and accurate manhole invert elevations when requiredfor performance of the work.4.1.7 The Shutdown or Manual Operation of Certain Pu
23、mpStations, if such becomes necessary for performance of thework.4.1.8 Water, necessary for performance of work under thecontract, with permission to use water from fire hydrants at thesite of work, or other suitable designated sources within areasonable distance from work areas.4.1.9 Disposal Area,
24、 for all materials removed from thesewers during the performance of the work and the unencum-bered right of the contractor to transport and expeditiouslydispose of such materials at a location designated by the owner.4.1.10 A Secure Storage Area, of a size adequate to accom-modate the required vehic
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF245420052016E1STANDARDPRACTICEFORSEALINGLATERALCONNECTIONSANDLINESFROMTHEMAINLINESEWERSYSTEMSBYTHELATERALPACKERMETHODUSINGCHEMICALGROUTING

链接地址:http://www.mydoc123.com/p-538748.html