ASTM F2448-2004(2007) Standard Practice for Manufacturer Quality Assurance System for Weight-Shift-Control Aircraft《重量转移控制飞行器用生产商质量保证体系的标准实施规程》.pdf
《ASTM F2448-2004(2007) Standard Practice for Manufacturer Quality Assurance System for Weight-Shift-Control Aircraft《重量转移控制飞行器用生产商质量保证体系的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2448-2004(2007) Standard Practice for Manufacturer Quality Assurance System for Weight-Shift-Control Aircraft《重量转移控制飞行器用生产商质量保证体系的标准实施规程》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2448 04 (Reapproved 2007)Standard Practice forManufacturer Quality Assurance System for Weight-Shift-Control Aircraft1This standard is issued under the fixed designation F 2448; the number immediately following the designation indicates the year oforiginal adoption or, in the case of
2、revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers minimum requirements for a qual-ity assurance program for weight-shift-con
3、trol aircraft.1.2 This practice applies to weight-shift-control aircraftseeking civil aviation authority approval, in the form of flightcertificates, flight permits, or other like documentation.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use.
4、It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Significance and Use2.1 The purpose of this practice is to provide the minimumrequirements necessary for the establish
5、ment of a writtenquality assurance program for a light sport aircraft manufac-turer, or component supplier.2.2 If final assembly is completed outside of the mainproduction facility, the manufacturer shall specify the requiredprocedures and what persons are authorized to perform them.3. Materials and
6、 Manufacture3.1 Drawing Control ProcedureA written procedure shallbe in effect so that appropriate manufacturing drawings, theirmanufacturing revisions, and related documents are utilized foreach project.3.2 Component Control Procedure:3.2.1 A written procedure shall be in effect so that materials,p
7、rocesses, and components, including raw materials, are inaccordance with the manufacturing specifications.3.2.2 This procedure shall provide the purchasing agentwith all of the information required to order appropriatematerial.3.2.3 A written receiving procedure shall be in effect so thatincoming ma
8、terial and components are checked against thepurchasing specifications.3.2.4 A written procedure shall be in effect so that materialin stock can be properly identified for future use.3.2.5 Documentation on any material, process, or compo-nents certified shall be filed for reference.4. Inspection4.1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF244820042007STANDARDPRACTICEFORMANUFACTURERQUALITYASSURANCESYSTEMFORWEIGHTSHIFTCONTROLAIRCRAFT 重量

链接地址:http://www.mydoc123.com/p-538733.html