《ASTM F2233-2003(2009) Standard Guide for Safety Access Rights Construction Liability and Risk Management for Optical Fiber Networks in Existing Sewers《现有污水管中光纤网络的安全性、使用权限、建造、义务和风险管.pdf》由会员分享,可在线阅读,更多相关《ASTM F2233-2003(2009) Standard Guide for Safety Access Rights Construction Liability and Risk Management for Optical Fiber Networks in Existing Sewers《现有污水管中光纤网络的安全性、使用权限、建造、义务和风险管.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2233 03 (Reapproved 2009)Standard Guide forSafety, Access Rights, Construction, Liability, and RiskManagement for Optical Fiber Networks in Existing Sewers1This standard is issued under the fixed designation F 2233; the number immediately following the designation indicates the year o
2、foriginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide addresses only primary safety concerns,easement
3、s, constructability, liability of the various parties, andrisk management related to constructing, installing, maintain-ing, or changing an optical fiber network in an existing sewer.1.2 The text of this standard references notes and footnoteswhich provide explanatory material. These notes and footn
4、otes(excluding those in tables and figures) shall not be consideredas requirements of the standard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and healt
5、h practices and determine the applica-bility of regulatory requirements prior to use. See 4.1 and5.1-5.1.7 for specific safety information.2. Referenced Documents2.1 OSHA Documents:OSHA 29 CFR Part 1926 Occupational Safety and HealthStandards for the Construction Industry22.2 Other Documents:U.S. DO
6、T MUTCD Part VI Manual on Uniform TrafficControl Devices33. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.1 access rightsagreements between various parties toobtain temporary and permanent access to property for thepurpose of constructing, maintaining, or changing optical fiberne
7、tworks.3.1.2 competent persona person properly trained in thesafety aspects of an activity.3.1.3 confined spaceman entry area that has restrictedaccess and egress.3.1.4 constructabilitythe term used to denote the condi-tion of a completed set of plans and specifications for a opticalfiber network an
8、d its impact to the host utility, which have beenprepared with an analysis of practical, feasible methods ofconstruction.3.1.5 liabilitythe exposure to claims for damage to an-other partys health, well-being, or property; in the event thata “bond” is considered from a liability perspective, furnishi
9、nga bond will guarantee performance or payment of all bills, orboth.3.1.6 optical fiber networktelecommunications cablefrom central office to user.3.1.7 partneringin construction, teaming between theowner, engineer, contractor, and other involved parties.3.1.8 risk managementthe process of identifyi
10、ng the riskson a construction project, and assigning the risks to the partiesmost capable of controlling the risks.3.1.9 safetyphysical and mental activities that protect thehealth, well-being, and life of workers and third-party people,and activities that protect the property of all parties.4. Sign
11、ificance and Use4.1 Safety factors must be addressed and incorporated intothe work to protect the workers and the public, and construc-tion activities may need to be altered accordingly. Engineeringand construction costs are a part of the analysis.4.2 Access rights to the work should be considered i
12、n thedesign of the project.4.3 A construction professional, who has field experience inconstruction activities similar to the scope of work anticipated,should review the plans for constructability prior to starting theproject.4.4 Proper insurance and surety bonding to protect theinterests of all par
13、ties to the agreement or contract should beconsidered.4.5 Risk management assessment will identify the partiesthat are in the best position to control and be responsible for thedifferent risks.5. Performance Requirements5.1 Safety PracticesSafety practices should follow theguidelines of OSHA 29 CFR
14、Part 1926 and other state andlocal regulations. The installer should refer to OSHA, state,1This guide is under the jurisdiction of ASTM Committee F36 on Technologyand Underground Utilities and is the direct responsibility of Subcommittee F36.10on Optical Fiber Systems within Existing Infrastructure.
15、Current edition approved May 1, 2009. Published June 2009. Originallyapproved in 2003. Last previous edition approved in 2003 as F 2233 03.2Available from Occupational Safety and Health Administration (OSHA), 200Constitution Ave., NW, Washington, DC 20210, http:/www.osha.gov.3Available from the Amer
16、ican Traffic Safety Services Association (ATSSA), 15Riverside Parkway, Suite 100, Fredericksburg, VA 22406, http:/.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.and local regulations before work begins. These guidelines willaddress
17、 confined spaces, a competent person, safety training,structural hazards, trench safety, manhole safety, traffic safety,and equipment safety.5.1.1 Confined SpacesPerhaps the most dangerous ele-ment of safety risk is exposure to underground confined spaces.In the United States, OSHA requires that con
18、fined spaceentrants, attendant, entry supervisor, and rescue team betrained, provide special equipment, and follow certain proce-dures when entering a manhole or underground sewer. Theattendant must be equipped to test the atmosphere, monitor theatmosphere and the crew, control the activities in the
19、 confinedspace, and call an emergency response team for any accident.Besides the air atmosphere, the confined space crew mustrecognize and protect members from sewage or water in thesewers, which can injure or drown a crew member.5.1.2 Structural HazardsWhen cleaning, inspecting, re-pairing the sewe
20、r, or installing and maintaining and changingthe fiber and conduit, the crew should inspect entry structuresand large diameter sewers for structural deficiencies, andconsider possible point collapses, which could flood the pipewith sudden infiltration, or subject the crew to other hazards.Therefore,
21、 appropriate judgment and other precautions shouldbe considered.5.1.3 Trench SafetySome open trench work or directionaldrilling is required for interconnections and for final connec-tions to users and other telecommunication companies. Acompetent person trained to recognize dangerous conditionsand t
22、o protect the crew must be on site. The most commonsafety concerns in open trench work are cave-ins and otherutility hits. Therefore, shoring, trench boxes, manhole boxes,ladders, locating equipment, and air atmosphere monitoringdevices are needed to perform these activities. All OSHAconstruction st
23、andards must be followed.5.1.4 Traffc SafetyCrews cleaning, inspecting, repairing,installing optical fiber and conduit, repairing sewers andmanholes, and installing new conduit in open trench may beexposed to traffic. U.S. DOT MUTCD Part VI requires thattraffic control devices and flaggers must be i
24、n place to protectthe crew and the public, if there is exposure to traffic. Acompetent person should be in charge of these activities.NOTE 1The AGC4offers information on Safety, Constructability,Liability and Risk Management, and Partnering through its website.Additional information about constructa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF223320032009STANDARDGUIDEFORSAFETYACCESSRIGHTSCONSTRUCTIONLIABILITYANDRISKMANAGEMENTFOROPTICALFIBERNETWORKSINEXISTINGSEWERS

链接地址:http://www.mydoc123.com/p-538130.html