ASTM F2184-2002 Standard Guide for Installation of Paintball Barrier Netting《彩弹球障碍网安装的标准指南》.pdf
《ASTM F2184-2002 Standard Guide for Installation of Paintball Barrier Netting《彩弹球障碍网安装的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2184-2002 Standard Guide for Installation of Paintball Barrier Netting《彩弹球障碍网安装的标准指南》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2184 02An American National StandardStandard Guide forInstallation of Paintball Barrier Netting1This standard is issued under the fixed designation F 2184; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of
2、last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.INTRODUCTIONThis guide is intended to outline installation requirements for the safe and effective installation ofpaintball barri
3、er netting. The proper installation of safe paintball barrier netting at paintball playingfacilities is critical to protect non-players from accidental impact of a paintball.Paintball is a sport that, like all sports, has intrinsic hazards for the active participants. These hazardsinclude being hit
4、by paintballs. Spectators not separated from the active playing field by an appropriatebarrier can experience accidental impact of a paintball. Although surrounding an active playing fieldwith paintball barrier netting cannot eliminate all injuries, paintball barrier netting can substantiallyreduce
5、the severity and frequency of injuries when properly installed.This guide is written within the current state-of-the-art of paintball barrier netting technology. Theintent is to revise this guide whenever substantive information becomes available that justifies revisingexisting requirements or addin
6、g new requirements.1. Scope1.1 This guide provides recommendations for the installa-tion of paintball barrier netting that may be used to delineateplaying fields, chronograph areas, target ranges, and other“goggle-on” areas of an active paintball site.1.2 The values stated in SI units are to be rega
7、rded as thestandard. The inch-pound units in parentheses are provided forinformation only.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practic
8、es and determine the applica-bility of regulatory requirements prior to use.2. Referenced Documents2.1 ASTM Standards:2F 1979 Specification for Paintballs Used in the Sport ofPaintball3. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.1 barrel, nthat portion of a paintball marker t
9、hroughwhich the paintball is discharged.3.1.2 billowing, nlateral movement of the netting thatmay occur from influence of the wind.3.1.3 muzzle, nthe end of the barrel at which the ball exitsthe barrel.3.1.4 paintball, na spherical ball, commonly with a diam-eter of 17.3 mm (0.68 in.), composed of a
10、 shell and a fill, thatis designed to be expelled from a paintball marker andconforms to Specification F 1979.3.1.5 paintball barrier netting, nnetting used in the sportof paintball as a protective barrier.3.1.6 paintball marker, na device specifically designed todischarge paintballs. The device is
11、sometimes referred to as apaintball gun.3.1.7 SAT (Standard Ambient Temperature), nused todescribe a substance at a temperature of 25 6 2C (77 6 4F).3.1.8 shell, na rigid to semi-rigid material (generally ofgelatin) that encapsulates the fill of a paintball.4. Significance and Use4.1 This guide reco
12、mmends minimum installation require-ments to provide a reasonable degree of safety in the normaluse of paintball barrier netting.5. General Requirements5.1 Layout (see Fig. 1):5.1.1 Paintball barrier netting shall be installed not closerthan 6.10 6 0.15 m (20.0 6 0.5 ft) from the playing fieldbounda
13、ry line.1This guide is under the jurisdiction of ASTM Committee F08 on SportsEquipment and Facilities and is the direct responsibility of Subcommittee F08.24 onPaintball and Equipment.Current edition approved May 10, 2002. Published June 2002.2For referenced ASTM standards, visit the ASTM website, w
14、ww.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.5.1
15、.1.1 If the 6.10 6 0.15 m (20.0 6 0.5 ft) buffer zonecannot be respected due to space constraints, the netting mustconform to 5.2.1 at the distance of closest approach.5.1.2 A spectator exclusion zone will extend a minimum of0.61 6 0.15 m (2.0 6 0.5 ft) beyond the paintball barriernetting allowing f
16、or billowing.5.2 Paintball Barrier Netting Performance:5.2.1 At the point of closest approach as defined in 5.1 andupon discharge of a paintball from a paintball marker, thepaintball barrier netting must prevent an intact paintball frompassing the paintball barrier netting and shall not allow shellf
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF21842002STANDARDGUIDEFORINSTALLATIONOFPAINTBALLBARRIERNETTING 弹球 障碍 安装 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-537987.html