ASTM F449-2002(2014) Standard Practice for Subsurface Installation of Corrugated Polyethylene Pipe for Agricultural Drainage or Water Table Control《农业排水或地下水位控制用聚乙烯波纹管地下安装的标准实施规程》.pdf
《ASTM F449-2002(2014) Standard Practice for Subsurface Installation of Corrugated Polyethylene Pipe for Agricultural Drainage or Water Table Control《农业排水或地下水位控制用聚乙烯波纹管地下安装的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM F449-2002(2014) Standard Practice for Subsurface Installation of Corrugated Polyethylene Pipe for Agricultural Drainage or Water Table Control《农业排水或地下水位控制用聚乙烯波纹管地下安装的标准实施规程》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F449 02 (Reapproved 2014) An American National StandardStandard Practice forSubsurface Installation of Corrugated Polyethylene Pipe forAgricultural Drainage or Water Table Control1This standard is issued under the fixed designation F449; the number immediately following the designation
2、indicates the year of originaladoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A superscriptepsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice is recommended for and l
3、imited to gravityflow subsurface drainage systems or water table control, butnot recommended for sanitary or storm sewer applications.Procedures are outlined to minimize pipe deflection or struc-tural damage during and after the installation process. Theseinstallation procedures are in accordance wi
4、th “flexible con-duit” principles.1.2 This practice applies to all agricultural subsurface drain-age or water table control installations using SpecificationF405, F667 or other plastic pipe.1.3 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are m
5、athematicalconversions to SI units that are provided for information onlyand are not considered standard.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and
6、 health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D1600 Terminology forAbbreviated Terms Relating to Plas-ticsD2412 Test Method for Determination of External LoadingCharacteristics of Plastic Pipe by Parallel-Plate Lo
7、adingF405 Specification for Corrugated Polyethylene (PE) Pipeand FittingsF412 Terminology Relating to Plastic Piping SystemsF667 Specification for 3 through 24 in. Corrugated Polyeth-ylene Pipe and Fittings3. Terminology3.1 Definitions are in accordance with Terminology F412and abbreviations are in
8、accordance with Terminology D1600,unless otherwise specified.3.2 backfillmaterials used to fill the trench followinginstallation of the pipe and bedding.3.3 beddingmaterial which provides stable bottom sup-port for the pipe including the trench bottom groove supportangle or select material placed ar
9、ound the pipe, and envelopeor filter materials where used during installation.3.4 blindingthe placement of soil, bedding material overand on the sides of the pipe or envelope to ensure proper grade,alignment, support, and protection of pipe during backfillingand after installation.3.5 boot (also shi
10、eld)the protecting apparatus linked tothe rear of the installation machine in a manner which allowsplacement of the pipe on the trench bottom, protection of theworkman, or placement of envelope or filter material, or both.3.6 cradlea prefabricated rigid structure designed to pro-vide trench bottom s
11、upport for the pipe when soil support isinadequate.3.7 envelopeporous material placed around the pipe toprovide bedding, improve the flow of ground water into thedrain, or function as a filter.3.8 filteran envelope of natural or synthetic materialsplaced completely around a drain to permit free wate
12、r move-ment into the drain, provide stabilizing support at the soil-filterinterface, and restrict movement of silt and sand into the drain.3.9 gradethe slope of the pipe invert.3.10 groove support angleangle between the radii of thepipe at points of contact with the formed groove of undisturbedsoil
13、or a cradle.3.11 mineral soilssoil containing (1) less than 30 % or-ganic matter by weight provided the mineral fraction is 60 % ormore clay, or (2) less than 20 % organic matter by weightprovided the mineral fraction has no clay, or (3) less than aproportional content of organic matter between 20 a
14、nd 30 % ifthe clay content of the mineral fraction is between 0 and 60 %.1This practice is under the jurisdiction of ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.65 on LandDrainage.Current edition approved March 1, 2014. Published September 2014. O
15、riginallyapproved in 1976. Last previous edition approved in 2008 as F449 02(2008). DOI:10.1520/F0449-02R14.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the stan
16、dards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13.12 natural granular envelopean envelope of granularmaterial, usually highly permeable well-graded sand andgravel.3.13 organic soilsoil co
17、ntaining (1) 30 % or more organicmatter provided the mineral fraction is 60 % or more clay, or (2) 20 % or more organic matter provided the mineral fractionhas no clay, or (3) a proportional content of organic matterbetween 20 and 30 % if the clay content of mineral fraction isbetween 0 and 60 %. (I
18、t is a general rule that a soil is classedas an organic soil (histosol) either if more than one half ofupper 32 in. (80 mm) of soil is organic or if organic soilmaterial of any thickness rests on rock or on fragmentalmaterial having voids filled with organic material.)3.14 pipe stiffnessforce per un
19、it length, per unit deflectionas defined in Test Method D2412.3.15 power feedermechanism that applies force to thepipe as it passes through the boot or shield to reduce stretchduring installation.3.16 pre-rippingthe practice of making a pass with theplow without installing pipe to locate rocks and t
20、o reduce draft.3.17 start holea trench sufficiently long and wide to allowworking room for placing the boot or shield, blade or cuttingmechanism on grade to start the trench and to install connec-tions or pipe.3.17.1 DiscussionStart holes are usually dug with a back-hoe with a flat-bottom trench.3.1
21、8 stretchthe increase in length of the pipe caused bytension forces during installation. It is expressed as a percentincrease of the length prior to installation. Stretch differs fromelongation in that elongation is a material test and stretch is aninstallation test.3.19 synthetic envelopean envelop
22、e made of syntheticgeotextiles, usually thin synthetic fabrics or thicker fibrousmaterial, or both, often selected to function as a filter.3.20 trench depththe depth of the trench measured fromthe bottom of the pipe.3.21 trench widththe width of the trench measured at thetop of the pipe.3.22 Fig. 1
23、illustrates the terms bedding, vertical deflection,backfill material, cover, groove support angle, horizontaldeflection, trench width, and trench depth.Fig. 2 illustrates various support grooves or trench bottomshapes.Fig. 3 illustrates envelope and filter.Fig. 4 illustrates rodent protection device
24、s.Fig. 5 illustrates boot or shield.4. General Requirements4.1 BurialThe maximum and minimum burial depth areaffected by the following factors, groove support angle of thetrench bottom, bedding, blinding backfill soil density, envelopedensity, envelope placement, pipe stiffness, the live loadexpecte
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF44920022014STANDARDPRACTICEFORSUBSURFACEINSTALLATIONOFCORRUGATEDPOLYETHYLENEPIPEFORAGRICULTURALDRAINAGEORWATERTABLECONTROL

链接地址:http://www.mydoc123.com/p-536690.html