《ASTM F2019-2003(2009) Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place T.pdf》由会员分享,可在线阅读,更多相关《ASTM F2019-2003(2009) Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place T.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2019 03 (Reapproved 2009)An American National StandardStandard Practice forRehabilitation of Existing Pipelines and Conduits by thePulled in Place Installation of Glass Reinforced Plastic(GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP)1This standard is issued under the fixed desig
2、nation F 2019; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision
3、or reapproval.1. Scope1.1 This practice covers the procedures for the reconstruc-tion of pipelines and conduits (4 to 48 in. (100 to 1200 mm)diameter) by the pulled-in place installation of a resin-impregnated, flexible fabric tube into an existing conduitfollowed by inflation with compressed air (s
4、ee Fig. 1). Theresin/fabric tube can be cured by either the flow through thefabric tube of mixed air and steam or by use of ultraviolet light.When cured, the finished cured-in-place pipe will be continu-ous and tight fitting. This reconstruction process can be used ina variety of gravity flow applic
5、ations such as sanitary sewers,storm sewers, process piping, electrical conduits, ventilationsystems, and pressure applications.1.2 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for infor
6、mation onlyand are not considered standard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulato
7、ry limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D 543 Practices for Evaluating the Resistance of Plastics toChemical ReagentsD 578 Specification for Glass Fiber StrandsD 638 Test Method for Tensile Properties of PlasticsD 790 Test Methods for Flexural Properties of Unreinforce
8、dand Reinforced Plastics and Electrical Insulating MaterialsD 1600 Terminology for Abbreviated Terms Relating toPlasticsD 1682 Test Method for Breaking Load and Elongation ofTextile Fabrics3D 3039/D 3039M Test Method for Tensile Properties ofPolymer Matrix Composite MaterialsD 3567 Practice for Dete
9、rmining Dimensions of “Fiber-glass” (Glass-Fiber-Reinforced Thermosetting Resin) Pipeand FittingsD 5813 Specification for Cured-In-Place ThermosettingResin Sewer Piping SystemsF 412 Terminology Relating to Plastic Piping SystemsF 1216 Practice for Rehabilitation of Existing Pipelines andConduits by
10、the Inversion and Curing of a Resin-Impregnated TubeF 1417 Test Method for Installation Acceptance of PlasticGravity Sewer Lines Using Low-Pressure AirF 1743 Practice for Rehabilitation of Existing Pipelines andConduits by Pulled-in-Place Installation of Cured-in-PlaceThermosetting Resin Pipe (CIPP)
11、2.2 AWWA Standard:Manual on Cleaning and Lining Water Mains, M2842.3 NASSCO Standard:Recommended Specifications for Sewer Collection SystemRehabilitation53. Terminology3.1 General:3.1.1 Definitions are in accordance with Terminology F 412.Abbreviations are in accordance with Abbreviations D 1600,unl
12、ess otherwise indicated.3.2 Definitions of Terms Specific to This Standard:3.2.1 calibration hosean impermeable bladder installedinside the fabric tube, and inflated with air or steam, or both topress the tube firmly against the wall of the existing pipe untilthe resin is cured with air and steam or
13、 ultraviolet light. Thecalibration hose is removed when the installation is finished.1This practice is under the jurisdiction of ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.67 onTrenchless Plastic Pipeline Technology.Current edition approved Aug.
14、1, 2009. Published November 2003. Originallyapproved in 2000. Last previous edition approved in 2003 as F 2019 03.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to th
15、e standards Document Summary page onthe ASTM website.3Withdrawn. The last approved version of this historical standard is referencedon www.astm.org.4Available from American Water Works Association (AWWA), 6666 W. QuincyAve., Denver, CO 80235, http:/www.awwa.org.5Available from National Association o
16、f Sewer Service Companies, 423 W.King Street, Suite 3000, Chambersburg, PA 172011Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.3.2.2 cured-in-place pipe (CIPP)a hollow cylinder con-sisting of a glass reinforced plastic (GRP) fabric
17、tube withcured thermosetting resin. External foils are included. TheCIPP is formed within an existing pipe and takes the shape ofthe pipe.3.2.3 delaminationseparation of the layers in the sand-wich constructed CIPP3.2.4 dry spotan area of the fabric tube, where thefinished CIPP is deficient or devoi
18、d of resin.3.2.5 fiberglass compositea material that is resistant tonormal sewer effluents as tested in accordance with 6.4.1 and6.4.2 of Specification D 5813.3.2.6 fabric tubeflexible fiberglass materials formed intoa tubular shape which is saturated with resin prior to installa-tion and holds the
19、resin in place as a permanent part of theinstalled cured-in-place pipe as further described in 5.2.1.3.2.7 lifta portion of the CIPP that is a departure from theexisting conduit well forming a section of reverse curvature inthe CIPP.3.2.8 sliding foila plastic foil installed prior to the fabrictube
20、covering the lower third of the circumference of theexisting pipe to reduce friction.4. Significance and Use4.1 This practice is for use by designers and specifiers,regulatory agencies, owners and inspection organizations whoare involved in the rehabilitation of conduits through the use ofa resin-im
21、pregnated fabric tube, pulled in place through anFIG. 1 Cured-In-Place Pipe Installation Method (Air/Steam)F 2019 03 (2009)2existing conduit and subsequently inflated and cured. As forany standard practice, modifications may be required forspecific job conditions.5. Recommended Materials and Manufac
22、ture5.1 GeneralThe fabric tube, resin and external prelinersshall produce a CIPP that meets the requirements of thesespecifications.5.2 CIPP Wall CompositionThe wall shall consist of acorrosion resistant fiberglass fabric tube (Fig. 2) saturated witha thermosetting (cross-linked) resin, and if used
23、a fillermaterial.5.2.1 Fabric TubeThe fabric tube shall consist of at leasttwo separate tubes made of corrosion resistant (E-CR) glassfibers in accordance with Specification D 578. The internalsurface shall consist of a veil preferably made of polyester. TheFIG. 2 Composition of Fabric TubeF 2019 03
24、 (2009)3fabric tube shall further be constructed with longitudinalunidirectional glass roving of sufficient strength to negotiate apulling force at least equal to the weight of the liner. The fabrictube shall tolerate up to 10 % circumferential changes in theexisting conduit.5.2.2 External FoilsThe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF201920032009STANDARDPRACTICEFORREHABILITATIONOFEXISTINGPIPELINESANDCONDUITSBYTHEPULLEDINPLACEINSTALLATIONOFGLASSREINFORCEDPLASTICGRPCUREDINPLACETPDF

链接地址:http://www.mydoc123.com/p-536310.html