《ASTM F2019-2003 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Thermos.pdf》由会员分享,可在线阅读,更多相关《ASTM F2019-2003 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Thermos.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2019 03An American National StandardStandard Practice forRehabilitation of Existing Pipelines and Conduits by thePulled in Place Installation of Glass Reinforced Plastic(GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP)1This standard is issued under the fixed designation F 2019; the
2、 number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1.
3、Scope1.1 This practice covers the procedures for the reconstruc-tion of pipelines and conduits (4 to 48 in. (100 to 1200 mm)diameter) by the pulled-in place installation of a resin-impregnated, flexible fabric tube into an existing conduitfollowed by inflation with compressed air (see Fig. 1). There
4、sin/fabric tube can be cured by either the flow through thefabric tube of mixed air and steam or by use of ultraviolet light.When cured, the finished cured-in-place pipe will be continu-ous and tight fitting. This reconstruction process can be used ina variety of gravity flow applications such as sa
5、nitary sewers,storm sewers, process piping, electrical conduits, ventilationsystems, and pressure applications.1.2 The values stated in inch-pound units are to be regardedas the standard. The values given in parentheses are forinformational purposes only.1.3 This standard does not purport to address
6、 all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D 543 Testing Met
7、hod of Resistance of Plastics to ChemicalReagentsD 578 Specifications for Glass Fiber StrandsD 638 Testing Method for Tensile Properties of PlasticsD 790 Test Methods for Flexural Properties of Unreinforcedand Reinforced Plastics and Electrical Insulating MaterialsD 1600 Terminology for Abbreviated
8、Terms Relating toPlasticsD 1682 Test Method for Breaking Load and Elongation ofTextile Fabrics3D 3039/D 3039M Test Method for Tensile Properties ofPolymer Matrix Composite MaterialsD 3567 Practice for Determining Dimensions of ReinforcedThermosetting Resin Pipe (RTRP) and FittingsD 5813 Specificatio
9、n for Cured-in-Place ThermosettingResin Sewer PipeF 412 Terminology Relating to Plastic Piping SystemsF 1216 Practice for Rehabilitation of Existing Pipelines andConduits by the Inversion and Curing of a Resin-Impregnated TubeF 1417 Test Method for Installation Acceptance of GravityPlastic Sewer Lin
10、es Using Low Pressure Air TestingF 1743 Practice for Rehabilitation of Existing Pipelines andConduits by Pulled- in-Place Installation of Cured-in PlaceThermosetting Resin Pipe (CIPP)2.2 AWWA Standard:Manual on Cleaning and Lining Water Mains, M2842.3 NASSCO Standard:Recommended Specifications for S
11、ewer Collection SystemRehabilitation53. Terminology3.1 General:3.1.1 Definitions are in accordance with Terminology F 412.Abbreviations are in accordance with Abbreviations D 1600,unless otherwise indicated.3.2 Definitions of Terms Specific to This Standard:3.2.1 calibration hosean impermeable bladd
12、er installedinside the fabric tube, and inflated with air or steam, or both topress the tube firmly against the wall of the existing pipe untilthe resin is cured with air and steam or ultraviolet light. Thecalibration hose is removed when the installation is finished.3.2.2 cured-in-place pipe (CIPP)
13、a hollow cylinder con-sisting of a glass reinforced plastic (GRP) fabric tube with1This practice is under the jurisdiction of ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.67 onTrenchless Plastic Pipeline Technology.Current edition approved Sept. 10
14、, 2003. Published November 2003.Originally approved in 2000. Last previous edition approved in 2000 asF 2019 00.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the
15、standards Document Summary page onthe ASTM website.3Withdrawn.4Available from American Water Works Association (AWWA), 1401 New YorkAve., NW, Suite 640, Washington, DC 20005.5Available from National Association of Sewer Service Companies, 423 W.King Street, Suite 3000, Chambersburg, PA 172011Copyrig
16、ht ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.cured thermosetting resin. External foils are included. TheCIPP is formed within an existing pipe and takes the shape ofthe pipe.3.2.3 delaminationseparation of the layers in the sand-wich cons
17、tructed CIPP3.2.4 dry spotan area of the fabric tube, where thefinished CIPP is deficient or devoid of resin.3.2.5 fiberglass compositea material that is resistant tonormal sewer effluents as tested in accordance with 6.4.1 and6.4.2 of Specification D 5813.3.2.6 fabric tubeflexible fiberglass materi
18、als formed intoa tubular shape which is saturated with resin prior to installa-tion and holds the resin in place as a permanent part of theinstalled cured-in-place pipe as further described in 5.2.1.3.2.7 lifta portion of the CIPP that is a departure from theexisting conduit well forming a section o
19、f reverse curvature inthe CIPP.3.2.8 sliding foila plastic foil installed prior to the fabrictube covering the lower third of the circumference of theexisting pipe to reduce friction.4. Significance and Use4.1 This practice is for use by designers and specifiers,regulatory agencies, owners and inspe
20、ction organizations whoare involved in the rehabilitation of conduits through the use ofa resin-impregnated fabric tube, pulled in place through anexisting conduit and subsequently inflated and cured. As forFIG. 1 Cured-In-Place Pipe Installation Method (Air/Steam)F2019032any standard practice, modi
21、fications may be required forspecific job conditions.5. Recommended Materials and Manufacture5.1 GeneralThe fabric tube, resin and external prelinersshall produce a CIPP that meets the requirements of thesespecifications.5.2 CIPP Wall CompositionThe wall shall consist of acorrosion resistant fibergl
22、ass fabric tube (Fig. 2) saturated witha thermosetting (cross-linked) resin, and if used a fillermaterial.5.2.1 Fabric TubeThe fabric tube shall consist of at leasttwo separate tubes made of corrosion resistant (E-CR) glassfibers in accordance with Specification D 578. The internalsurface shall cons
23、ist of a veil preferably made of polyester. Thefabric tube shall further be constructed with longitudinalunidirectional glass roving of sufficient strength to negotiate aFIG. 2 Composition of Fabric TubeF2019033pulling force at least equal to the weight of the liner. The fabrictube shall tolerate up
24、 to 10 % circumferential changes in theexisting conduit.5.2.2 External FoilsThe external foils (Layer 1 in Figs. 2and 3) shall consist of one or more layers of styrene resistantor light proof, or both, tube-shaped plastic foils.5.2.3 Calibration hoseThe calibration hose (Layer 6 inFig. 2 and Layer 5
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF20192003STANDARDPRACTICEFORREHABILITATIONOFEXISTINGPIPELINESANDCONDUITSBYTHEPULLEDINPLACEINSTALLATIONOFGLASSREINFORCEDPLASTICGRPCUREDINPLACETHERMOSPDF

链接地址:http://www.mydoc123.com/p-536309.html