ASTM E964-2006e1 Standard Practice for Measuring Benefit-to-Cost and Savings-to-Investment Ratios for Buildings and Building Systems《建筑物和建筑物系统的效益与成本和节约与投资比率测算的标准实施规程》.pdf
《ASTM E964-2006e1 Standard Practice for Measuring Benefit-to-Cost and Savings-to-Investment Ratios for Buildings and Building Systems《建筑物和建筑物系统的效益与成本和节约与投资比率测算的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM E964-2006e1 Standard Practice for Measuring Benefit-to-Cost and Savings-to-Investment Ratios for Buildings and Building Systems《建筑物和建筑物系统的效益与成本和节约与投资比率测算的标准实施规程》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E 964 06e1Standard Practice forMeasuring Benefit-to-Cost and Savings-to-Investment Ratiosfor Buildings and Building Systems1This standard is issued under the fixed designation E 964; the number immediately following the designation indicates the year oforiginal adoption or, in the case
2、of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.e1NOTEFootnotes updated editorially in August 2007.INTRODUCTIONThis is one in a series of practices for
3、applying economic evaluation methods to building-relateddecisions. Methods covered by this practice are benefit-to-cost ratio (BCR) and savings-to-investmentratio (SIR). These are members of a family of economic evaluation methods that can be used tomeasure the economic consequences of a decision ov
4、er a specified period of time. The BCR is usedwhen the focus is on benefits (that is, advantages measured in dollars) relative to project costs. TheSIR, a variation of the BCR, is used when the focus is on project savings (that is, cost reductions)relative to project costs. The family of methods inc
5、ludes, in addition to BCR and SIR, net benefits, netsavings, life-cycle cost, internal rate-of-return, adjusted internal rate-of-return, and payback (seePractices E 917, E 1057, E 1074, and E 1121). Guide E 1185 directs you to the appropriate method fora particular economic problem.BCR and SIR are n
6、umerical ratios that indicate the economic performance of a project by the sizeof the ratio.Aratio less than 1.0 indicates a project that is uneconomic, a ratio of 1.0 indicates a projectwhose benefits or savings just equal its costs, and a ratio greater than 1.0 indicates a project that iseconomic.
7、 While it is straightforward to use ratios to determine whether a given project is economicor uneconomic, care must be taken to correctly interpret ratios when using them to choose amongalternative designs and sizes of a project, or to assign priority to projects competing for limited funds.1. Scope
8、1.1 This practice covers a procedure for calculating andinterpreting benefit-to-cost ratios (BCR) and savings-to-investment ratios (SIR) as an aid for making building-relateddecisions.1.2 A basic premise of the BCR and SIR methods is thatfuture as well as present benefits and costs arising from adec
9、ision are important to that decision, and, if measurable indollars, should be included in calculating the BCR and SIR.1.3 Dollar amounts used to calculate BCR and SIR are alldiscounted, that is, expressed in time-equivalent dollars, eitherin present value or uniform annual value terms.2. Referenced
10、Documents2.1 ASTM Standards:2E 631 Terminology of Building ConstructionsE 833 Terminology of Building EconomicsE 917 Practice for Measuring Life-Cycle Costs of Buildingsand Building SystemsE 1057 Practice for Measuring Internal Rate of Return andAdjusted Internal Rate of Return for Investments in Bu
11、ild-ings and Building SystemsE 1074 Practice for Measuring Net Benefits and Net Sav-ings for Investments in Buildings and Building SystemsE 1121 Practice for Measuring Payback for Investments inBuildings and Building SystemsE 1185 Guide for Selecting Economic Methods for Evalu-ating Investments in B
12、uildings and Building SystemsE 1369 Guide for Selecting Techniques for Treating Uncer-tainty and Risk in the Economic Evaluation of Buildings1This practice is under the jurisdiction of ASTM Committee E06 on Perfor-mance of Buildings and is the direct responsibility of Subcommittee E06.81 onBuilding
13、Economics.Current edition approved April 1, 2006. Published April 2006. Originallyapproved in 1983. Last previous edition approved in 2002 as E 964 02.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStan
14、dards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.and Building SystemsE 1765 Practice for Applying Analytical Hierarchy Process(AHP) to Multiattr
15、ibute Decision Analysis of InvestmentsRelated to Buildings and Building SystemsE 1946 Practice for Measuring Cost Risk of Buildings andBuilding SystemsE 2204 Guide for Summarizing the Economic Impacts ofBuilding-Related Projects2.2 ASTM Adjuncts:Discount Factor Tables,Adjunct to Practices E 917, E 9
16、64,E 1057, E 1074, and E 112133. Terminology3.1 DefinitionsFor definitions of terms used in thispractice, refer to Terminologies E 631 and E 833.4. Summary of Practice4.1 This practice identifies related ASTM standards andadjuncts. It outlines the recommended steps for carrying out ananalysis using
17、the BCR or SIR method, explains each step, andgives examples. This practice discusses the importance ofspecifying objectives, alternatives, and constraints at the outsetof an evaluation. It identifies data and assumptions needed forcalculating BCRs and SIRs, and shows how to calculate theratios. Thi
18、s practice emphasizes the importance of correctlyinterpreting the meaning of the ratios in different applications,and of taking into account uncertainty, unquantified effects, andfunding constraints. It identifies requirements for documenta-tion and recommends appropriate contents for a BCR or SIRre
19、port. This practice also explains and illustrates the applica-tion of the BCR and SIR methods to decide whether to acceptor reject a project, how much to invest in a project, and how toallocate limited investment funds among competing uses.5. Significance and Use5.1 The BCR and SIR provide measures
20、of economicperformance in a single number that indicates whether aproposed building or building system is preferred over amutually exclusive alternative that serves as the base forcomputing the ratio. It may be contrasted with the life-cyclecost (LCC) method that requires two LCC measures to evaluat
21、ethe economic performance of a building or building systemone for each alternative.5.2 The ratio indicates discounted dollar benefits (or sav-ings) per dollar of discounted costs.5.3 The BCR or SIR can be used to determine if a givenbuilding or building system is economic relative to the alter-nativ
22、e of not having it.5.4 The BCR or SIR computed on increments of benefits (orsavings) and costs can be used to determine if one design orsize of a building or system is more economic than another.5.5 The BCR or SIR can be used as an aid to select theeconomically efficient set of projects among many c
23、ompetingfor limited funding. The efficient set of projects will maximizeaggregate net benefits or net savings obtainable for the budget.6. Procedure6.1 The recommended steps for carrying out an economicevaluation using the BCR or SIR method are summarized asfollows:6.1.1 Identify objectives, constra
24、ints, and alternatives (seeSection 7),6.1.2 Compile data and establish assumptions for the evalu-ation (see Section 8),6.1.3 Compute BCR or SIR (see Section 9),6.1.4 Analyze the BCR or SIR results and make a decision,taking into account uncertainty, unquantified effects, and fund-ing or cash-flow co
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME9642006E1STANDARDPRACTICEFORMEASURINGBENEFITTOCOSTANDSAVINGSTOINVESTMENTRATIOSFORBUILDINGSANDBUILDINGSYSTEMS

链接地址:http://www.mydoc123.com/p-533855.html