1、Designation: E557 00 (Reapproved 2006)1Standard Guide forThe Installation of Operable Partitions1This standard is issued under the fixed designation E557; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A
2、 number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1NOTE1.3, units of measure statement, was editorially inserted an
3、d Fig. 3 and 5.3.3 and 5.4 were editorially revised in May2010.1. Scope1.1 This guide describes options of intructions recom-mended to be considered in preparation for, and applicationand installation of, operable partitions and, to some extent, inthe design of the building in which they are install
4、ed. Operablepartitions are those that are quickly movable.1.2 Excluded from this guide are those partitions that areclassified by the building products industry as demountable.Demountable partitions are those that are designed and in-stalled with the intent of later being taken down and re-erectedby
5、 a crew over a period of time, with the components beingreusable.1.3 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.4 This standard do
6、es not purport to address all of thesafety problems, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Sta
7、ndards:2E90 Test Method for Laboratory Measurement of AirborneSound Transmission Loss of Building Partitions and Ele-mentsE336 Test Method for Measurement of Airborne SoundAttenuation between Rooms in BuildingsE413 Classification for Rating Sound InsulationE497 Practice for Installing Sound-Isolatin
8、g LightweightPartitions3E1155 Test Method for Determining FFFloor Flatness andFLFloor Levelness NumbersE1155M Test Method for Determining FFFloor Flatnessand FLFloor Levelness Numbers (Metric)3. Significance and Use3.1 Rooms formed by operable partitions must often beisolated acoustically. Sound-iso
9、lating properties of operablepartitions are specified by architects in terms of sound trans-mission class (STC) and so advertised by the manufacturer onthe basis of laboratory tests in accordance with Test MethodE90 and Classification E413.3.2 Because normal building design and construction prac-tic
10、es are not the same as those used in acoustical laboratories,actual field performance of operable partitions will probably beless than that of test specimens. Sound transmission betweenareas to be isolated will occur through all of the connectingbuilding components in addition to the operable partit
11、ion, thatis, floor and ceiling slabs, ceiling plenums, common walls, etc.All possible paths between the areas being isolated should havea sound insulation performance at least equal to the operablepartition. Unless good acoustical practice is followed in bothbuilding design and installation, there m
12、ay be a significantdiscrepancy between the sound isolation expected and thatachieved.3.3 Because of the complex nature of the sound flankingpaths adjacent to operable partitions, it is highly recommendedthat all related construction details be reviewed by a personqualified in acoustical construction
13、.3.4 This guide does not specify requirements. However,persons desiring to write installation and construction specifi-cations may find the contents useful in developing require-ments for the site preparation, and installation practices nec-essary to minimize leakage and flanking sound around theope
14、rable partition.1This guide is under the jurisdiction of ASTM Committee E33 on Building andEnvironmentalAcoustics and is the direct responsibility of Subcommittee E33.04 onApplication of Acoustical Materials and Systems.Current edition approved Sept. 1, 2006. Published September 2006. Originallyappr
15、oved in 1975. Last previous edition approved in 2000 as E557 - 00. DOI:10.1520/E0557-00R06E01.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document
16、 Summary page onthe ASTM website.3Withdrawn. The last approved version of this historical standard is referencedon www.astm.org.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.4. Properties of Operable Partitions4.1 There are several
17、 types of operable partitions: hingedpanel groups, individual panel and continuously hinged parti-tion systems. Some are supported by overhead track with orwithout a floor guide or track. Some are floor supported with anoverhead track to guide them. They may be manual orpower-operated. One type cons
18、ists of movable panels securedin place by vertical expansion to seal against the floor andceiling. Seals or gaskets are of many kinds; some consist ofresilient material that maintains continuous flexible contactwith floor or ceiling, and some include a mechanical, hydraulicor pneumatic mechanism tha
19、t maintains clearance when inmotion and a positive seal when finally closed.4.2 Sound Leaks:4.2.1 The seals at the top of the partitions should makecontinuous contact with smooth surfaces on both sides of theoperable partitions. The sound path through an insufficient seal,up and over the track, and
20、out on the other side through theinsufficient seal constitutes a serious sound leak.4.2.2 When a partition consists of several panels, leaks mayoccur at the vertical joints when the seals at the joint are nottight.4.2.3 Pass-through doors in partitions will generally reducethe overall sound isolatio
21、n of the wall. For this reason,pass-through doors should be equipped with full perimetergasketing, including seals at head.4.2.4 Track assemblies installed outside the partition storagepocket area to form cross-through paths (90 to each other )primarily for the transport of partitions from one locat
22、ion to theother should be avoided unless a satisfactory method isprovided to reduce the flanking path created through the tracksection from one side of the partition to the other.4.3 Sound Flanking PathsAlthough the operable partitionmay be an adequate barrier itself, sound may pass from oneside to
23、the other by going over, around, or under the partition.The passage of sound by paths other than directly through thepartition itself is called flanking transmission.5. Recommendations5.1 Area Above Track:5.1.1 If there is a plenum above the partition, sound maypass up through the ceiling on one sid
24、e and down through theceiling on the other. A barrier should be erected directly abovethe operable partitions. This barrier, in conjunction with theceiling, should have a sound transmission loss equal to orgreater than that of the partition. The barrier is best designed aspart of the building and no
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME55720002006E18125STANDARDGUIDEFORTHEINSTALLATIONOFOPERABLEPARTITIONS 活动 间壁 安装 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-533028.html