ASTM E2840-2011(2015) Standard Practice for Pavement Condition Index Surveys for Interlocking Concrete Roads and Parking Lots《联锁混凝土道路和停车场的路面状况指数调查的标准实施规程》.pdf
《ASTM E2840-2011(2015) Standard Practice for Pavement Condition Index Surveys for Interlocking Concrete Roads and Parking Lots《联锁混凝土道路和停车场的路面状况指数调查的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM E2840-2011(2015) Standard Practice for Pavement Condition Index Surveys for Interlocking Concrete Roads and Parking Lots《联锁混凝土道路和停车场的路面状况指数调查的标准实施规程》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E2840 11 (Reapproved 2015)Standard Practice forPavement Condition Index Surveys for InterlockingConcrete Roads and Parking Lots1This standard is issued under the fixed designation E2840; the number immediately following the designation indicates the year oforiginal adoption or, in the c
2、ase of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice is used to assess the condition of roads andparking lots surfaced with inte
3、rlocking concrete pavementthrough visual surveys using the Pavement Condition Index(PCI) method of quantifying pavement condition.1.2 The PCI for roads and parking lots was developed by theU.S. Army Corps of Engineers (1, 2). It is further verified andadopted by DOD and APWA. This standard is an ada
4、ptation ofthe PCI method for interlocking concrete pavements.1.3 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.2. Terminology2.1 Defini
5、tions of Terms Specific to This Standard:2.1.1 additional sample, na sample unit inspected inaddition to the random sample units to include non represen-tative sample units in the determination of pavement conditionindex. This includes very poor or excellent samples that are nottypical of the sectio
6、n and sample units. If a sample unitcontaining an unusual distress is chosen at random, it should becounted as an additional sample and another random sampleunit should be chosen. If all sample units are inspected, thenthere are no additional samples.2.1.2 interlocking concrete pavement, ndiscrete,
7、hand-sized paving units with rectangular or dentated shapes manu-factured from concrete and conforming toASTM C 936. Eithertype of unit shape is placed in an interlocking pattern withvarious jointing and bedding materials over an unbound orbound base layer.2.1.3 pavement branch, na branch is an iden
8、tifiable part ofthe pavement network that is a single entity and has a distinctfunction. For example, each roadway or parking area is aseparate branch of a pavement network.2.1.4 pavement condition index (PCI), na numerical rat-ing of the pavement condition that ranges from 0 to 100 with0 being the
9、worst possible condition and 100 being the bestpossible condition.2.1.5 pavement condition rating, na verbal description ofpavement condition as a function of the PCI value that variesfrom “failed” to “excellent” as shown in Fig. 1.2.1.6 pavement distress, nexternal indicators of pavementdeteriorati
10、on caused by loading, environmental factors, con-struction deficiencies, or a combination thereof. Typical dis-tresses include depressions, damaged pavers, horizontal creepand faulting. Distress types and severity levels detailed inAppendix X1 must be used to obtain an accurate PCI value.2.1.7 pavem
11、ent sample unit, na sample unit is a subdivi-sion of the pavement section. Each pavement section is dividedinto sample units for the purpose of pavement inspection. Thesample units for inspection shall be 2500 ft26 1000 ft2(225m26 90 m2).2.1.8 pavement section, na contiguous pavement areahaving unif
12、orm construction, maintenance, usage history, andcondition. A section should have the same traffic volume andload intensity.2.1.9 random sample, na sample unit of the pavementsection selected for inspection by random sampling techniques.3. Summary of Practice3.1 The pavement is divided into branches
13、 that are thendivided into sections. Each section is divided into sample units.The type and severity of pavement distress is assessed byvisual inspection of the pavement sample units. The quantity ofdistress is measured as described in Appendix X1 and Appen-dix X2. The distress data is used to calcu
14、late the PCI for eachsample unit. The PCI of a pavement section is determinedbased on the PCI of the inspected sample units within thesection.4. Significance and Use4.1 The PCI is a numerical indicator that rates the surfacecondition of the pavement. The PCI provides a measure of thepresent conditio
15、n of the pavement based on the distressobserved on the surface of the pavement, which also indicates1This practice is under the jurisdiction of ASTM Committee E17 on Vehicle -Pavement Systems and is the direct responsibility of Subcommittee E17.42 onPavement Management and Data Needs.Current edition
16、 approved Sept. 1, 2015. Published December 2015. Originallyapproved in 2011 as E2840 11. DOI: 10.1520/E284011R15Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1the structural integrity and surface operational condition (lo-calized ro
17、ughness and safety). The PCI does not measurestructural capacity nor does it provide direct measurement ofskid resistance or roughness. It provides an objective andrational basis for determining maintenance and repair needsand priorities. Regular monitoring of the PCI is used toestablish the rate of
18、 pavement deterioration, which permitsearly identification of major rehabilitation needs. The PCI canalso provide feedback on pavement performance for validationor improvement of current pavement design and maintenanceprocedures.4.2 The PCI procedure for interlocking concrete pavementswas developed
19、by surveying many sample units. Additionalverification of the accuracy and repeatability of the PCIprocedure for interlocking concrete pavements remains to beperformed.5. Apparatus5.1 Data Sheets, or other field recording instruments thatrecord the date, location, branch, section, sample unit size,d
20、istress types, severity levels, quantities, and names of survey-ors. Example data sheets are shown in Fig. 2 and Fig. 3.5.2 Hand Odometer Wheel, that reads to the nearest 0.1 ft(30 mm).5.3 Straightedge or String Line,10ft(3m).5.4 Scale, 12 in. (300 mm) that reads to 1/16 in. (1 mm).Anadditional 12 i
21、n. (300 mm) ruler or straightedge is needed tomeasure faulting.5.5 Layout Plan, for network to be inspected.6. Hazards6.1 Traffic is a hazard as inspectors may walk on thepavement to perform the condition survey.7. Sampling and Sample Units7.1 Identify branches of the pavement with different usessuc
22、h as roadways and parking on the network layout plan.7.2 Divide each branch into sections based on the pavementtype, construction history, traffic, and condition.7.3 Divide the pavement sections into sample units.7.4 Individual sample units to be inspected should bemarked or identified in a manner t
23、o allow inspectors andquality control personnel to easily locate them on the pavementsurface. Paint marks along the edge and sketches with locationsconnected to physical pavement features are acceptable. It isnecessary to be able to accurately relocate the sample units toallow verification of curren
24、t distress data, to examine changesin condition with time of a particular sample unit, and to enablefuture inspections of the same sample unit if desired.7.5 Select the sample units to be inspected. The number ofsample units to be inspected may vary from the following: allof the sample units in the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME284020112015STANDARDPRACTICEFORPAVEMENTCONDITIONINDEXSURVEYSFORINTERLOCKINGCONCRETEROADSANDPARKINGLOTS

链接地址:http://www.mydoc123.com/p-531980.html