1、Designation: E2166 16Standard Practice forOrganizing and Managing Building Data1This standard is issued under the fixed designation E2166; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in paren
2、theses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the organization of building infor-mation to support informed decision making. The kinds of dataconsidered in this practice inclu
3、des text, numeric, and graphicdata. The system of organization is applicable to a wide rangeof data collection and organization tasks from routine in-depthanalysis of a single building, to situations where many build-ings must be evaluated and prioritized in a short time frame.1.2 The organizational
4、 structure is based on Classificationfor Building Elements and Related SiteworkUNIFORMATII (Classification E1557), a system which groups buildingelements according to the way buildings are constructed andfunction.1.3 The use of UNIFORMAT II provides a set of recognizedsummary levels that are relevan
5、t throughout the industries thatdesign, construct, and manage buildings.2. Referenced Documents2.1 ASTM Standards:2E631 Terminology of Building ConstructionsE833 Terminology of Building EconomicsE917 Practice for Measuring Life-Cycle Costs of Buildingsand Building SystemsE1334 Practice for Rating th
6、e Serviceability of a Building orBuilding-Related Facility (Withdrawn 2013)3E1557 Classification for Building Elements and RelatedSiteworkUNIFORMAT IIE1699 Practice for Performing Value Engineering (VE)/Value Analysis (VA) of Projects, Products and ProcessesE1765 Practice for Applying Analytical Hie
7、rarchy Process(AHP) to Multiattribute Decision Analysis of InvestmentsRelated to Projects, Products, and ProcessesE1836/E1836M Practice for Building Floor Area Measure-ments for Facility ManagementE2083 Classification for Building Construction FieldRequirements, and Office Overhead and for general t
8、erms related to building economics,refer to Terminology E833.4. Significance and Use4.1 Use this practice to organize information that describesnew or existing buildings of any size. The concepts presentedhere can also be applied to other categories of constructionwhere a standard corresponding to U
9、NIFORMAT II does notyet exist.4.2 The hierarchical structure of UNIFORMAT II enablesthe user to focus on building elements in functionally consis-tent groups. It can be applied by an administrator initiating adata system as a facility standard, as well as a consultantreporting on building conditions
10、.4.2.1 Aconsistent method of arrangement for subject matterexpedites the preparation and use of source documents, andsimplifies the process of comparing information from severalsources.4.3 This practice is suitable for arranging the content ofindividual reports, managing physical files, as well as a
11、uto-mated data applications. Personal computers operating com-mercially available software are able to meet the functionalrequirements of this practice.4.4 This practice provides a consistent and comprehensiveoutline suitable to track the evolution of specific buildingconditions in one or many build
12、ings. It can be applied tohistorical building data as well as new information.4.5 Administration of this practice will reveal categories ofbuilding data that have been overlooked in prior data gatheringefforts that did not rely on a systems approach. The compre-hensive hierarchy of Systems and Eleme
13、nts, readily displaysthe amount and depth of information distributed among thecategories and levels. The pattern of available informationhighlights voids among the categories. It is also possible toquickly focus on the quality and sufficiency of cataloged data1This practice is under the jurisdiction
14、 of ASTM Committee E06 on Perfor-mance of Buildings and is the direct responsibility of Subcommittee E06.81 onBuilding Economics.Current edition approved Oct. 1, 2016. Published October 2016. Originallyapproved in 2001. Last previous edition approved in 2012 as E216612. DOI:10.1520/E2166-16.2For ref
15、erenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3The last approved version of this historical standard is referenced
16、onwww.astm.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1to determine whether an appropriate level of detail exists toaddress the needs of decision-makers.5. Procedure5.1 Organize existing physical information to correspond toth
17、e categories of UNIFORMAT II. Initial data-gathering effortsfor new or existing buildings can easily make informationconform to the hierarchical structure of UNIFORMAT II.5.2 Legacy data and pre-existing text are likely to be foundin the prevailing style of the preparer. In order to preserve theclar
18、ity and continuity of concept presented in text which wasarranged in a non-UNIFORMAT II outline, it will be necessaryin many instances, to associate the same block of text to severalhierarchical levels in order to adequately communicate condi-tions or intent.5.3 Where a large body of existing data i
19、s available, theinitial organizing effort will involve some degree of judgmentbased on the quality of existing historical data, the presentcondition of the subject building, and some expectation of therange of potential uses for the building. Make objectivedecisions on the acquisition, retention, an
20、d application of data.Avoid stacking data to force outcomes that are situationallyperceived to be “obvious” or “inevitable.”5.3.1 Many buildings lack significant existing data forcertain Systems. In order to reliably establish baselineconditions, consult with relevant building specialists. Directcon
21、sultants to provide copies of new studies in formatscompatible with the facilitys resident system.5.4 Inventory a complete list of rooms or named spaces.Each room or space is delimited by a finite set of constructedentities such as floors, walls, and ceilings that corresponddirectly to a UNIFORMAT I
22、I element. Make on-site observa-tions of existing building conditions, or compile available datafrom the drawings of a proposed building to develop a suitableinventory. Reference UNIFORMAT II elements to the con-structed entities of the room inventory.5.5 Develop a list of elements within the third
23、level ofUNIFORMAT II. Make distinctions among the functionalattributes of similar elements. These distinctions form subsetsof elements or types. A type refers to a kind of assembly thatpossesses a unique combination of function and componentsconsistent with, and subordinate to, elements within the t
24、hirdlevel of the UNIFORMAT II outline. Elements which superfi-cially appear to be similar are constructed with purposefulphysical variations in order to accommodate a variety offunctional or situational requirements. For example, the exte-rior envelope of certain buildings is uniform on all sides an
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME21662016STANDARDPRACTICEFORORGANIZINGANDMANAGINGBUILDINGDATA 组织 管理 建筑 数据 标准 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-530450.html