ASTM E2110-2017 Standard Terminology for Exterior Insulation and Finish Systems (EIFS)《外部绝缘和精加工系统(EIFS)的标准术语》.pdf
《ASTM E2110-2017 Standard Terminology for Exterior Insulation and Finish Systems (EIFS)《外部绝缘和精加工系统(EIFS)的标准术语》.pdf》由会员分享,可在线阅读,更多相关《ASTM E2110-2017 Standard Terminology for Exterior Insulation and Finish Systems (EIFS)《外部绝缘和精加工系统(EIFS)的标准术语》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E2110 17Standard Terminology forExterior Insulation and Finish Systems (EIFS)1This standard is issued under the fixed designation E2110; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A numb
2、er in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This terminology covers terms and definitions pertain-ing to materials and processes used in the design and applica-tion of exterior insula
3、tion and finish systems (EIFS).2. Referenced Documents2.1 ASTM Standards:2E2112 Practice for Installation of Exterior Windows, Doorsand Skylights3. Terminology3.1 Definitions:accessories, npreformed metal, fiberglass, or plastic mem-bers for use to form corners, edges, control joints, ordecorative e
4、ffects.aesthetic joint, na deprecated term. See aesthetic reveal.aesthetic reveal, na groove cut into the insulation boardwhich serves the function of decoration or to provide astarting or stopping point for finish-coat application, or both.back wrap, na means of terminating an EIFS by continuingthe
5、 reinforced base coat from the exterior side of theinsulation board around its edge to the substrate. In theprocess of back wrapping, the reinforcing mesh is mechani-cally or adhesively secured to the substrate prior to installa-tion of the insulation board. (See Fig. 1.)DISCUSSIONAs an alternative
6、method, back wrapping is achieved bywrapping the edge, back, and exterior side of the insulation board withreinforced base coat prior to fastening the insulation board to thesubstrate. This is referred to as prewrap.base coat, nthe initial wet-state material, either factory orfield-mixed, used to en
7、capsulate the nonmetallic reinforcingmesh or fasten the insulation to the substrate.cold joint, nthe visible junction in a finish coat.cure, vto develop the ultimate properties of a wet-statematerial by a chemical process.drainage mat, ncomponent used in some EIFS-clad drain-age wall assemblies, a c
8、orrosion resistive material used as aspacer to provide a drainage path between the EIFS and theweather resistive barrier.dry, vto develop the ultimate properties of a wet-statematerial solely by evaporation of volatile ingredients.durability, nthe capability of a building assembly,component, product
9、, or construction to maintain serviceabil-ity over not less than a specified time.edge wrap, nthe condition of the perimeter at the EIFSwhere the reinforced base coat is terminated by wrapping thereinforced base coat onto the edge of the substrate. (See Fig.2.)EIFS, nsee exterior insulation and fini
10、sh system (EIFS).EIFS-clad barrier wall assembly, na wall assembly forwhich the EIFS cladding provides weather resistance for theEIFS clad portion of the assembly.EIFS-clad drainage wall assembly, na wall assemblyincorporating a means of drainage between the EIFS and aweather resistive barrier, for
11、incidental moisture resultingfrom a breach in the EIFS, to the exterior of the EIFS cladportion of the assembly.embed, vto encapsulate the nonmetallic reinforcing mesh inthe base coat.expansion joint, na structural separation between buildingelements that allow independent movement without damageto
12、the assembly.exterior insulation and finish system (EIFS), nnonloadbearing, exterior wall cladding system that consists of aninsulation board attached either adhesively or mechanically,or both, to the substrate; an integrally reinforced base coat;and a textured protective finish coat.factory mix, na
13、 material that is prepared at the point ofmanufacture and is ready to use without the addition of othermaterials, except possibly water to adjust consistency.1This terminology is under the jurisdiction of ASTM Committee E06 onPerformance of Buildings and is the direct responsibility of Subcommittee
14、E06.58on Exterior Insulation and Finish Systems (EIFS).Current edition approved Jan. 15, 2017. Published January 2017. Originallyapproved in 2000. Last previous edition approved in 2011 as E2110 11. DOI:10.1520/E2110-17.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME21102017STANDARDTERMINOLOGYFOREXTERIORINSULATIONANDFINISHSYSTEMSEIFS 外部 绝缘 精加工 系统 EIFS 标准 术语 PDF

链接地址:http://www.mydoc123.com/p-530304.html