ASTM E1699-2013 Standard Practice for Performing Value Engineering (VE) Value Analysis (VA) of Projects Products and Processes《项目 产品和过程的价值工程 (VE)和价值分析 (VA)的标准实施规程》.pdf
《ASTM E1699-2013 Standard Practice for Performing Value Engineering (VE) Value Analysis (VA) of Projects Products and Processes《项目 产品和过程的价值工程 (VE)和价值分析 (VA)的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM E1699-2013 Standard Practice for Performing Value Engineering (VE) Value Analysis (VA) of Projects Products and Processes《项目 产品和过程的价值工程 (VE)和价值分析 (VA)的标准实施规程》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E1699 10E1699 13Standard Practice forPerforming Value Engineering (VE)/Value Analysis (VA) ofBuildings Projects, Products and BuildingProcessesSystems1and Other Constructed Projects1,2This standard is issued under the fixed designation E1699; the number immediately following the designa
2、tion indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers a procedure
3、for defining and satisfying the functions of a project.project, product, or process (hereafterreferred to as focus of study). Projects include construction of commercial and residential buildings and other engineered systems.2Products include components, systems and equipment.3 Processes include pro
4、curement, materials management, work flow,fabrication and assembly, quality control, and services.1.2 A multidisciplinary team uses the procedure to convert stakeholder constraints, needs, and desires into descriptions ofproject functions and then relates these functions to revenues and cost.resourc
5、es.1.3 Examples of costs are all relevant costs over a designated study period, including the costs of obtaining funds, designing,purchasing/leasing, constructing/installing,constructing/manufacturing/installing, operating, maintaining, repairing, replacing anddisposing of the particular building de
6、sign or system focus of study (see Terminologies E631 and E833). While not the onlycriteria, cost is an important basis for comparison in a value analysis study of a project. VE/VA study. Therefore, accurate andcomprehensive cost data is an important element of the analysis.1.4 This is a procedure t
7、o develop alternatives that meet the projects functions. functions of the focus of study. Estimate thecosts for each alternative. Provide the owner/user/stakeholder with specific, technically accurate alternatives, appropriate to thestage of project development, alternatives which can be implemented
8、. The owner/user/stakeholder selects the alternative(s) thatbest satisfies their constraints, needs and desires.1.5 Apply this practice to an entire project focus of study, or to any subsystem. subsystem/element thereof. Theuser/owner/stakeholder can utilize the VAVE/VA procedure to select the eleme
9、nt or scope of the project to be studied.study.2. Referenced Documents2.1 ASTM Standards:4E631 Terminology of Building ConstructionsE833 Terminology of Building EconomicsE917 Practice for Measuring Life-Cycle Costs of Buildings and Building SystemsE1369 Guide for Selecting Techniques for Treating Un
10、certainty and Risk in the Economic Evaluation of Buildings and BuildingSystemsE1557 Classification for Building Elements and Related SiteworkUNIFORMAT IIE1765 Practice forApplyingAnalytical Hierarchy Process (AHP) to Multiattribute DecisionAnalysis of Investments Related toBuildings and Building Sys
11、temsE2013 Practice for Constructing FAST Diagrams and Performing Function Analysis During Value Analysis StudyE2103 Classification for Bridge ElementsUNIFORMAT II1 This practice is under the jurisdiction of ASTM Committee E06 on Performance of Buildings and is the direct responsibility of Subcommitt
12、ee E06.81 on BuildingEconomics.Current edition approved April 1, 2010Nov. 1, 2013. Published August 2010November 2013. Originally approved in 1995. Last previous edition approved in 20052010as E1699 00 (2005).E1699 10. DOI: 10.1520/E1699-10.10.1520/E1699-13.2 Value analysis (VA) is also referred to
13、as value engineering.Projects also include analytical studies that provide the technical basis for standards development or identifyalternative means for achieving organizational objectives and research and development activities that support the deployment of new products and processes.3 Typical co
14、nstruction-related products for each product type are: (1) componentsstructural steel members; (2) systemsfire protection systems such as sprinklers; and(3) equipmentmotorized vehicles for excavation and earthmoving, and transporting, lifting, and placing materials and components.4 For referencedAST
15、M standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.This document is not an ASTM standard and is intended only to provide the user o
16、f an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as pu
17、blished by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13. Terminology3.1 Definitions: For definitions of general terms related to building construction used in this practice, refer to
18、Terminology E631;and for general terms related to building economics, refer to Terminology E833.3.2 Definitions of Terms Specific to This Standard:3.2.1 value, nAn expression of the relationship between function and resources, where function is measured by theperformance requirements of the customer
19、 and resources are measured in cost for materials, labor, and time required to accomplishthat function.3.2.2 value engineering (VE), nThe application of value methodology to projects, products, and processes for the purpose ofachieving the essential functions at the lowest life-cycle cost consistent
20、 with the required performance, reliability, quality, andsafety (syn. value analysis (VA).3.2.3 value methodology, na systematic process used to improve the value of a project/product/process by examining itsfunctions and resources using analytical, creative, and evaluation techniques.3.2.3.1 Discus
21、sionThe process, normally conducted in a collaborative and multi-disciplined team workshop format, includes: (1) information phase;(2) function analysis phase; (3) creative phase; (4) evaluation phase; (5) development phase; and (6) presentation phase. Theprocess is referred to as the job plan.4. Su
22、mmary of Practice4.1 This practice outlines the procedures for developing alternatives to a proposed design that best fulfill the needs andrequirements of the owner/user/stakeholder of the building or building system. focus of study. The practice shows how to identifythe functions of the project and
23、 its systems; focus of study; develop alternatives to fulfill the projects its functions; and evaluatethe alternatives in their ability to satisfy defined criteria.5. Significance and Use5.1 Perform VA Use of this practice increases performance; maintains/improves schedule; maintains/enhances qualit
24、y withinbudget; provides a more efficient use of resources; reduces risk; and enhances safety or effectiveness, or both. Perform VE/VA asearly as possible in the life cycle of the focus of study, and anytime conditions change, to allow greatest flexibility and effectivenessof any recommended changes
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME16992013STANDARDPRACTICEFORPERFORMINGVALUEENGINEERINGVEVALUEANALYSISVAOFPROJECTSPRODUCTSANDPROCESSES

链接地址:http://www.mydoc123.com/p-529270.html