ASTM D8173-2018 7500 Standard Guide for Site Preparation Layout Installation and Hydration of Geosynthetic Cementitious Composite Mats《土工合成水泥复合垫的现场准备、布置、安装和水合的标准指南》.pdf
《ASTM D8173-2018 7500 Standard Guide for Site Preparation Layout Installation and Hydration of Geosynthetic Cementitious Composite Mats《土工合成水泥复合垫的现场准备、布置、安装和水合的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM D8173-2018 7500 Standard Guide for Site Preparation Layout Installation and Hydration of Geosynthetic Cementitious Composite Mats《土工合成水泥复合垫的现场准备、布置、安装和水合的标准指南》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D8173 18Standard Guide forSite Preparation, Layout, Installation, and Hydration ofGeosynthetic Cementitious Composite Mats1This standard is issued under the fixed designation D8173; the number immediately following the designation indicates the year oforiginal adoption or, in the case o
2、f revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers directions for the installation of ageosynthetic cementitious composite mat
3、(GCCM) under fieldconditions typically present in erosion control, hydraulic struc-ture armoring and protection, and protection applications.1.2 The values in SI units are to be regarded as the standard.Values in inch-pound units are in parentheses for information.1.3 This guide contains general gui
4、delines. It is not intendedto replace project-specific installation requirements. In theevent of a conflict between the two, the requirements of theproject specifications will supersede the requirements of thisguide.1.4 This is not an all-inclusive guide, and some projects willbe beyond the scope of
5、 this guide.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety, health, and environmental practices and deter-mine the applicability of regulatory limitations
6、prior to use.1.6 This international standard was developed in accor-dance with internationally recognized principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization Technic
7、alBarriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2D4439 Terminology for Geosynthetics2.2 American Concrete Institute Standard:3ACI 306.1 Standard Specification for Cold Weather Concret-ing2.3 Further information is available on the various GCCMsfrom their manufacturers.
8、Individual GCCM manufacturersrecommendations may be more detailed with regards to spe-cific applications or details than the information found in thisstandard, and should be consulted prior to undertaking anyinstallation.3. Terminology3.1 Definitions:3.1.1 bottom layer flap, nin a GCCM installation,
9、asection of the bottom layer that extends beyond the top layer.3.1.2 butt joint, nin a GCCM installation, a connection oftwo separate segments of GCCM where the edges of eachsegment of GCCM are touching and generally in the sameplane and may be sealed with a bottom layer flap.3.1.3 hydration, nin a
10、GCCM installation, exposure of theGCCM, in this case, to water in prescribed conditions for aprescribed time.3.1.4 layer, nin a GCCM installation, the distinct materialcomponents of which a segment of GCCM material is com-posed.3.1.5 longitudinal layup, nin a GCCM installation,adeployed position of
11、the GCCM where the material is deployedin line with the greater length of the structure being lined (thatis, along the length of a channel).3.1.6 segment, nin a GCCM installation, an individualstrip or section of GCCM material.3.1.7 shingled joint, nin a GCCM, a connection method oftwo separate segm
12、ents of GCCM where a length of onesegment overlaps on top of an adjacent segment.3.1.8 transverse layup, nin a GCCM installation, a de-ployed position of the GCCM where the material is deployedtransverse to the greater length of the structure being lined (thatis, across the width of a channel).3.1.9
13、 unjointed edge, nin a GCCM installation, an edge ofthe segment of GCCM that is not secured within an anchortrench or sufficiently fixed to provide immediate contactbetween the segment and substrate and to minimize ingress.Sometimes referred to as “free ends.”1This guide is under the jurisdiction of
14、ASTM Committee D35 on Geosyntheticsand is the direct responsibility of Subcommittee D35.05 on Geosynthetic ErosionControl.Current edition approved Feb. 1, 2018. Published February 2018. Originallyapproved in 2018. DOI: 10.1520/D8173-18.2For referenced ASTM standards, visit the ASTM website, www.astm
15、.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American Concrete Institute (ACI), 38800 Country Club Dr.,Farmington Hills, MI 48331-3439, http:/www.concrete
16、.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of
17、International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.13.2 For definitions of additional terms used in this standard,refer to Terminology D4439.4. Significance and Use4.1 This guide identifies proper layout, installatio
18、n, andhydration procedures along with equipment for use by GCCMdesigners, inspectors, and installers.4.2 ApplicationsTypical GCCM applications may includebut are not limited to:4.2.1 Hydraulic structure armoring or protection, includingbut not limited to: ditches, swales, canals, flumes, and othersi
19、milar structures.4.2.2 Slope protection.4.2.3 Berm and bund lining and protection.4.2.4 Culvert invert lining.4.2.5 Scour protection at culvert inlets and outlets.4.2.6 Remediation of existing concrete channels and struc-tures.4.2.7 Lining of outfalls and spillways.4.2.8 Mow strips or weed suppressi
20、on.5. Procedure5.1 Pre-Construction Meeting and Safety:5.1.1 The methods and equipment used for the placement ofGCCMs can vary, but the primary objective of the process is tominimize damage and maximize performance. For optimumperformance, the GCCM must be installed in a manner thatdoes not negative
21、ly impact its physical, mechanical, or hydrau-lic properties.5.1.2 All applicable project safety requirements should beobserved. Prior to handling any GCCM, the manufacturersSafety Data Sheet (SDS) should be read and understood.5.1.3 With most projects, the construction means and meth-ods are the re
22、sponsibility of the installation contractor.However, pre-construction meetings between the owner ortheir representative, the contractor, the GCCM manufacturingrepresentative, or other parties should be held prior to instal-lation of the GCCM material.5.1.4 This meeting shall cover details of (at a m
23、inimum):5.1.4.1 GCCM application purpose and objectives.5.1.4.2 Review of installation procedures.5.1.4.3 Provisions for heavy lifting equipment needed forhandling and installing GCCM rolls that are too large formanual lifting, based on local requirements for manual labor.5.1.4.4 Clear understanding
24、 of each partys responsibilitiesand authority.5.1.4.5 Availability of required ancillaries which can in-clude screws, connectors, ground pegs, and adhesives to beused.5.1.4.6 Understanding the jointing of the GCCM segmentswhen connecting to appurtenant structures, concrete slabs,curbs, soil surface,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD817320187500STANDARDGUIDEFORSITEPREPARATIONLAYOUTINSTALLATIONANDHYDRATIONOFGEOSYNTHETICCEMENTITIOUSCOMPOSITEMATS

链接地址:http://www.mydoc123.com/p-526797.html