1、Designation: D7780 12Standard Practice forGeospatial Data for Representing Coal Mining Features1This standard is issued under the fixed designation D7780; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A
2、 number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice defines a set of terms, procedures, and datarequired to define the accurate location and description ofgeospatial data f
3、or surface coal mining operations (CMO),underground coal mining extents, land reclamation and perfor-mance bond statuses, lands unsuitable for mining petitions(LUMP) and designated areas, coal spoil and refuse features,coal preparation plants, environmental resource monitoringlocations (ERMLs), and
4、postmining land uses.1.2 This practice addresses mining geospatial data relativeto the Surface Mining Control and Reclamation Act of 1977(SMCRA). This geospatial data shall be obtained from eachstate, tribal, or federal coal mining regulatory authority (RA),or combinations thereof, authorized under
5、SMCRA to regulateCMOs.1.3 UnitsThe values stated in inch-pound units are to beregarded as standard. No other units of measurement areincluded in this standard1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user
6、of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulator limitations prior to use.1.4.1 This practice offers a set of instructions for performingone or more specific operations. This document cannot replaceeducation or experience and should
7、 be used in conjunction withprofessional judgment. Not all aspects of this practice may beapplicable in all circumstances. This ASTM standard is notintended to represent or replace the adequacy of a professionalservice, nor should this document be applied without consid-eration of a projects many un
8、ique aspects. The word “Stan-dard” in the title of this document means only that thedocument has been approved through the ASTM consensusprocess.1.5 This practice applies to pre-SMCRA or post-SMCRAcoal mining features or both.1.6 Surface CMOsAs used in this practice, a surfaceCMO represents an area
9、where coal removal, reclamation, andrelated supporting activities have occurred, is occurring, ispending authorization or is authorized by the RA within adefined surface CMO or any other unpermitted area that hasbeen identified by the RA prior to SMCRA.1.6.1 This practice addresses coal mining geosp
10、atial datarelative to SMCRA, interim permits, permanent programpermits, as well as CMOs before the enactment of SMCRA.Each RA shall be the authoritative data source (ADS) for coalmining geospatial data.1.7 Underground Coal Mining ExtentsThis practice ad-dresses underground coal mining extents that r
11、epresent an areawhere coal removal has occurred within a defined undergroundCMO.1.8 Land Reclamation StatusThis practice addresses theland reclamation status of surface areas within a permittedCMO where coal removal, reclamation and related supportingactivities has occurred, is occurring, or is plan
12、ned and autho-rized by the RA.1.9 Performance Bond StatusThis practice shows thestatus of coal mine reclamation as outlined by each phase ofreclamation that can result in bond release, according toSMCRA, 30 CFR Part 700 et seq, and 30 CFR Part 800, et seq.In addition to defining the status of indivi
13、dual areas covered bya performance bond, use of this standard will identify thechanges of the reclamation and bond status to mined areas asthey change over time. Reference to bond status meansperformance bond status.NOTE 1A single bond may cover multiple permits or multiple bondsmay cover a single p
14、ermit.1.10 Lands Unsuitable for Mining PetitionThis practiceaddresses boundary data pertaining to areas that have beenpetitioned and designated as unsuitable for mining relative toTitle V Section 522 of the SMCRA. It also addresses thoselands that have been found by the RAs process to bedesignated u
15、nsuitable for all or certain types of mining. Theseareas may be petitioned to be unsuitable for CMOs becausethey meet criterion that include, but are not limited to: fragile,historic, cultural, scientific, having esthetic values and naturalsystems such as aquifers that could be significantly damaged
16、due to a CMO.1This practice is under the jurisdiction of ASTM Committee D18 on Soil andRock and is the direct responsibility of Subcommittee D18.01.03 on GeospatialTechnology.Current edition approved Jan. 1, 2012. Published February 2012. DOI: 10.1520/D7780-12.1Copyright ASTM International, 100 Barr
17、 Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.1.11 Refuse StructuresThis practice addresses excessspoil and refuse features produced by CMOs. These featuresinclude excess spoil structures, coal refuse structures, and coalpreparation plants.1.11.1 Excess Spoil Structures
18、These structures are cre-ated when the total spoil produced during mining exceeds thevolume of material that can be utilized for reclamation. Thisoccurrence is common in steep slope areas, where the finalgrade of reclaimed slopes is limited by stability requirements.It also occurs where overburden v
19、olume is significantly largerthan the volume of minable coal. Spoil also exhibits a netincrease in volume due to the introduction of void spaces infragmented rock when overburden is removed to exposeunderlying coal seams. The production of excess spoil requiresthe creation of disposal structures tha
20、t extend outside the minedarea.1.11.2 Coal Preparation PlantsFacilities where impuri-ties are removed from coal and potentially crushed, resized,and blended with other grades of coal. Preparation plantsproduce refuse as a byproduct.1.11.3 RefuseA waste byproduct of coal processing, gen-erally catego
21、rized as either coarse or fine. Fine coal refuseoften is handled as a slurry containing a blend of water, finecoal, silt, sand, and clay particles.1.11.4 Impounding Refuse StructuresThese structures cre-ate a holding area for slurry that allows solids to settle out andwater to be recovered. Cross-va
22、lley and diked impoundmentsutilize an embankment, often constructed of coarse coal refuse,which forms a basin for slurry retention, as shown in Fig. 1 andFig. 2, respectively. Incised impoundments dispose of slurry inan excavated area below the natural surface and do not utilizea significant embankm
23、ent for slurry retention, see Fig. 3.1.11.5 Non-Impounding Refuse StructuresThese struc-tures may contain slurry that has been dewatered and stabilizedprior to disposal. Non-impounding slurry cells are used todispose of fine refuse. Methods that significantly reduce thewater content of fine coal ref
24、use may allow a refuse structureto avoid being classified as an impoundment.1.12 ERMLThis practice addresses locations where moni-toring and sampling (such as water, air, soil sampling, andsubsidence or air blasting monitoring) has occurred, is occur-ring, or is planned.1.13 Postmining Land UsesThis
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD778020123125STANDARDPRACTICEFORGEOSPATIALDATAFORREPRESENTINGCOALMININGFEATURES 表示 煤矿 特征 地理 空间 数据

链接地址:http://www.mydoc123.com/p-526307.html