ASTM D7488-2010 5625 Standard Test Method for Open Time of Latex Paints《乳胶涂料开放时间的标准试验方法》.pdf
《ASTM D7488-2010 5625 Standard Test Method for Open Time of Latex Paints《乳胶涂料开放时间的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM D7488-2010 5625 Standard Test Method for Open Time of Latex Paints《乳胶涂料开放时间的标准试验方法》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 7488 10Standard Test Method forOpen Time of Latex Paints1This standard is issued under the fixed designation D 7488; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses
2、indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers a procedure to determine thelength of time a latex paint remains “wet” or “open” enough toallow for brush-in and repair.1.2 This stan
3、dard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 A
4、STM Standards:2D3924 Specification for Environment for Conditioning andTesting Paint, Varnish, Lacquer, and Related MaterialsD5068 Practice for Preparation of Paint Brushes for Evalu-ationD5301 Practice for Physical Characterization of PaintBrushesE177 Practice for Use of the Terms Precision and Bia
5、s inASTM Test MethodsE691 Practice for Conducting an Interlaboratory Study toDetermine the Precision of a Test Method3. Terminology3.1 Definitions:3.1.1 open time, nthe length of time a coating remains wetor open enough to allow for brush-in without the edges of thefirst coat becoming visible and al
6、lowing for repair within thepreviously painted area.4. Summary of Test Method4.1 Since environmental conditions such as temperature,humidity and air flow can result in variable results, it isrecommended that this test method be performed in a constanttemperature / humidity room (23 6 2C (73.5 6 3.5F
7、) / 506 5 % relative humidity. Test paints are applied to the center ofa sealed chart with a 76 microns (3 mil) wet film thickness. Xmarks are made immediately. The number of X marks willdepend on how many can fit on one drawdown (see Fig. 1). Thetest paint is then applied in perpendicular sections,
8、 brushingeach section across the initial painted section. The perpendicu-lar sections are repeated at agreed upon time intervals. Afterdrying, wet edge is recorded as the last time the test paint couldbe brushed into the initial painted section without the edges ofthe first coat being visible. The t
9、ime at which the X marksbecome visible is also noted.5. Significance and Use5.1 Latex paints dry very quickly which often causesdifficulty in final appearance of painted areas, especially paintsformulated below 100g/L VOC where lower amounts ofsolvents are in the formulated latex paint. This method
10、is ameans of determining the time available before a test paintcannot be worked into a previously painted area.6. Apparatus6.1 Constant Temperature/Humidity Room (23 6 2C (73.56 3.5F) / 50 6 5 % relative humidity in accordance withSpecification D3924.6.2 Contrasting Sealed Chart (that is, black seal
11、ed chart forwhite paints or white sealed chart for tinted paints), typically30 by 60 cm (1 by 2 ft.).6.3 Glass Plate, 30 by 60 cm (1 by 2 ft.) or vacuum plate.6.3.1 If using a glass plate, tape to secure sealed chart toglass plate.6.4 Good Quality Brush, 50 mm (2 in.) wide with straightedge, polyest
12、er bristles in accordance with Practice D5301.6.5 Timer or Clock to record time intervals.6.6 Film Applicator, capable of applying a film with a widthof 7.5 cm (3 in.) and approximate wet film thickness of 75microns (3 mil).7. Procedure7.1 Condition the brush in accordance with Practice D5068.7.2 Ta
13、pe the edges of the chart to a smooth glass plate or usea vacuum plate.7.3 Along the length of the panel, drawdown 76 microns (3mil) wet film thickness of the test paint (see Fig. 1). Thedrawdown must be free of ridges, craters, or other imperfec-tions.1This test method is under the jurisdiction of
14、ASTM Committee D01 on Paintand Related Coatings, Materials, and Applications and is the direct responsibility ofSubcommittee D01.42 on Architectural Coatings.Current edition approved Dec. 1, 2010. Published February 2011. DOI: 10.1520/D748810.2For referenced ASTM standards, visit the ASTM website, w
15、ww.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.7.4
16、 Start the timer or record the time.7.5 Immediately make X marks approximately in 4 cm (112in.) wide and 4 cm (112 in.) long in four to five different areason the drawdown, as shown in Fig. 1.NOTE 1The wide curved end of a wooden tongue blade/paint brush orthe end of a tongue depressor/metal spatula
17、 has been found suitable forthis purpose.7.6 Re-wet the brush by dipping it into the test paint.Remove excess paint by lightly scraping both sides of the brushacross the top edge of the can.NOTE 2The objective is to keep the brush wet; but not to addsignificantly more paint to the area being tested.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD748820105625STANDARDTESTMETHODFOROPENTIMEOFLATEXPAINTS 乳胶 涂料 开放 时间 标准 试验 方法 PDF

链接地址:http://www.mydoc123.com/p-525639.html