1、Designation: D6825 141Standard Guide forPlacement of Riprap Revetments1This standard is issued under the fixed designation D6825; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses in
2、dicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEEditorially updated units of measurement statement in April 2018.1. Scope*1.1 This guide covers methods to place riprap with associ-ated filters for erosion control p
3、urposes. This guide does notrecommend a specific course of action because of the diversemethods and procedures that are capable of producing afunctional product. This guide identifies favorable riprap quali-ties and recommends practices best suited to obtain thosequalities. The production of rock, u
4、se of recycled materials,rock with cut dimensions, and engineering and revetmentdesign are beyond the scope of this guide. Special forms ofriprap, including hand placed riprap, grouted riprap, or keyed(plated) riprap that is tamped into place to smooth the surface,are also beyond the scope of this g
5、uide.1.2 This guide offers an organized collection of informationor a series of options and does not recommend a specific courseof action. This document cannot replace education or experi-ence and should be used in conjunction with professionaljudgment. Not all aspects of this guide may be applicabl
6、e in allcircumstances. This ASTM standard is not intended to repre-sent or replace the standard of care by which the adequacy ofa given professional service must be judged, nor should thisdocument be applied without consideration of a projects manyunique aspects. The word “Standard” in the title of
7、thisdocument means only that the document has been developedand approved through the ASTM consensus process1.3 The values stated in SI units are to be regarded asstandard. The values given in parentheses after SI units areprovided for information only and are not considered standard.1.4 This standar
8、d may involve hazardous operations andequipment. This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regula
9、tory requirements prior to use.1.5 This international standard was developed in accor-dance with internationally recognized principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Or
10、ganization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2C33 Specification for Concrete AggregatesC136 Test Method for Sieve Analysis of Fine and CoarseAggregatesD75 Practice for Sampling AggregatesD653 Terminology Relating to Soil, Rock, and ContainedFluidsD4
11、992 Practice for Evaluation of Rock to be Used forErosion ControlD5519 Test Methods for Particle Size Analysis of Naturaland Man-Made Riprap MaterialsD6092 Practice for Specifying Standard Sizes of Stone forErosion Control2.2 AASHTO Standard:3M 288 Geotextile Specification for Highway Applications3.
12、 Terminology3.1 DefinitionsSee Terminology D653 for general defini-tions.3.2 Definitions of Terms Specific to This Standard:3.2.1 beddingan aggregate mixture placed below the rip-rap. Bedding material is usually sand and gravel sized, but mayinclude cobble sized material. If placed without a geotext
13、ile,the bedding material may be used as a filter. If placed inconjunction with a geotextile, the bedding may provide acushion for protection of the geotextile during riprap placement1This guide is under the jurisdiction ofASTM Committee D18 on Soil and Rockand is the direct responsibility of Subcomm
14、ittee D18.17 on Rock for ErosionControl.Current edition approved Feb. 1, 2014. Published March 2014. Originallyapproved in 2002. Last previous edition approved in 2008 as D6825 02 (Reap-proved 2008)1. DOI: 10.1520/D6825-14E01.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orco
15、ntact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American Association of State Highway and TransportationOfficials (AASHTO), 444 N. Capitol St., NW, Suite 249, Washingt
16、on, DC 20001,http:/www.transportation.org.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with internationally rec
17、ognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.1and provide confinement of the geotextile. It is possible to h
18、avemore than one bedding layer.3.2.2 chinkingthe practice of filling riprap surface voidswith smaller sized rock or aggregate.3.2.3 clam shella bucket tool that is operated from adragline or crane. The bucket is hinged at the top and openslike a clam so that rock can be placed without dropping it.3.
19、2.4 Dxthe particle diameter at which x % by weight(dry) of the particles of a particular sample are finer.3.2.5 filterany substance, as geotextile or layer of sand/aggregate, placed to provide separation and retention ofmaterials, while allowing water to pass.3.2.6 floatera individual rock within th
20、e riprap layer thatis not interlocked with the surrounding rocks.3.2.7 maximum aspect ratiothe ratio of the greatest to theleast dimension, measured across mutually perpendicular axes,for any piece of rock; synonym, slabbiness.3.2.8 orange peela bucket tool that is operated from adragline or crane a
21、nd resembles the shape of an orange peeling.The sides lift up and out so that rock can be placed withoutdropping it.3.2.9 pit run materialrock that has been blasted but notprocessed to remove undersize pieces; synonym, shot rock orquarry run.3.2.10 revetmentbank protection by armor, that is, byfacin
22、g of a bank or embankment with erosion-resistant mate-rial.3.2.11 riprapmaterial generally less than 2 tons (1.8tonnes) in mass, specially selected and graded. When properlyplaced, riprap prevents erosion through minor wave action, orstrong currents and thereby preserves the shape of a surface,slope
23、, or underlying structure. Riprap may be specificallyproduced for the intended purpose, or it may be a by-productfrom a mining operation, structure demolition, or industrialprocess.3.2.12 rockany naturally formed aggregate of mineralmatter occurring in large masses or fragments. Rock may beeither in
24、situ or excavated material.4. Significance and Use4.1 Riprap is a commonly used form of scour protection andgeneral slope protection. Riprap provides a long term solutionwhen properly sized and installed. Riprap has structural flex-ibility so it will conform to irregular surfaces and adapt tominor s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD68252014E10625STANDARDGUIDEFORPLACEMENTOFRIPRAPREVETMENTS 护岸 放置 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-523697.html