1、Designation: D 6599 00Standard Practice forConstruction of Live Fascines on Slopes1This standard is issued under the fixed designation D 6599; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in p
2、arentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the material, fabrication and instal-lation work to construct live fascines.1.2 The values in this standard are in SI units
3、and are to beregarded as the standard. The inch-pound units given inparentheses are for information only.1.3 This practice offers a set of instructions for performingone or more specific operations. This document cannot replaceeducation or experience and should be used in conjunction withprofessiona
4、l judgement. Not all aspects of this practice may beapplicable in all circumstances. This ASTM standard is notintended to represent or replace standard of care by which theadequacy of a given professional service must be judged, norshould this document be applied without considerations of aprojects
5、many unique aspects. The word “Standard” in the titleof this document means only that the document has beenapproved through the ASTM consensus process.1.4 This standard may involve hazardous materials, opera-tions, and equipment. This standard does not purport toaddress all of the safety concerns, i
6、f any, associated with itsuse. It is the responsibility of the user of this standard toestablish appropriate safety and health practices and deter-mine the applicability of regulatory limitations prior to use.2. Terminology2.1 Definitions:2.1.1 live fascine, na linear bundle of live cut branches ofw
7、oody plant material that propagates easily from cuttings. Thebundle is anchored in a shallow trench and partially coveredwith soil.2.1.2 rolled erosion control product, na material manu-factured into rolls designed to reduce erosion and assist in thegermination, establishment and/or anchorage of veg
8、etation.2.1.3 dead stout stake, na wood stake approximately .75to 1 m (2.5 to 3 ft) in length. Construct dead stout stakes from3.8 3 8.9 cm (29 3 49) dimensional lumber cut diagonallyalong the 8.9 cm face.2.1.4 live stake, na woody stem or branch of vegetativelyself-propagating woody plant species.
9、Live stakes are approxi-mately 2.5 to 4 cm (.59 to 1.59) in diameter and 60 to 75 cm(249309) in length with the terminal end sharpened to a pointor a steep angular cut. Use live stakes as additional anchors andpropagating material on the downslope side of live fascinebundles.3. Summary of Practice3.
10、1 A live fascine is comprised of live cut plant stems andbranches, typically of woody plant species (e.g., willow,dogwood, poplar, etc.) that are formed into linear bundles.These bundles are installed in shallow trenches, secured in thetrench with wood stakes, then backfilled with enough soil toleav
11、e a small portion on top of the branch bundle exposed. Livefascines assist to control erosion, encourage vegetative topgrowth establishment and rooting for shallow soil stabilization.4. Significance and Use4.1 Live fascines are used to provide erosion and sedimen-tation control by increasing infiltr
12、ation, slowing or redirectingrunoff, and trapping seed and sediments. The method providesshallow mechanical surface slope stabilization, and providesenhanced values through vegetative growth and additionalshallow soil reinforcement through the development of theroots. The ability of live fascines to
13、 function properly dependson the quality and choice of the materials used to construct thelive fascine, the means and methods of fabrication and instal-lation, and proper consideration of site characteristics and timeof year. For the live fascine to function completely, it isimportant that the live
14、fascine develops suitable growth.5. Materials5.1 Live Woody Plant Materialare woody stems andbranch cuttings of vegetatively self-propagating woody plantspecies.When constructing a live fascine, use only fresh or well-preserved viable cuttings. Do not use dead plant material inlive fascines. The ste
15、ms or branches should be long, straightand flexible to allow easy assembly into bundles. Typically,plants are harvested near the project site within the sameclimatic zone. Cut the plant material in lengths ranging from 2to4m(68 to 138). Greater lengths may be used if handling andsite conditions allo
16、w. The caliper (diameter) of cuttings gen-erally range from 1.2 to 2.5 cm (.59 to 19). The greatest successresults from cutting and installing vegetation during the dor-mant season.5.2 Brush Cutting ImplementsCut live vegetation with1This practice is under the jurisdiction of ASTM Committee D18 on S
17、oil andRock and is the direct responsibility of Subcommittee D18.25 on Erosion andSediment Control Technology.Current edition approved Nov.10,2000. Published March 2001.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.tools such as pr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD65992000STANDARDPRACTICEFORCONSTRUCTIONOFLIVEFASCINESONSLOPES 斜坡 活动 建造 标准 规格 PDF

链接地址:http://www.mydoc123.com/p-522995.html