ASTM D6462-2003 Standard Practice for Silt Fence Installation《拦淤栅栏安装的标准实施规范》.pdf
《ASTM D6462-2003 Standard Practice for Silt Fence Installation《拦淤栅栏安装的标准实施规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM D6462-2003 Standard Practice for Silt Fence Installation《拦淤栅栏安装的标准实施规范》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 6462 03Standard Practice forSilt Fence Installation1This standard is issued under the fixed designation D 6462; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indic
2、ates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This practice covers common installation requirementsfor temporary silt fence applications. This practice is based onAASHTO M288.1.2 This practice is applicable
3、 to the use of silt fence as avertical permeable interceptor designed to remove suspendedsoil from overland, nonconcentrated water flow. The functionof a temporary silt fence is to trap and allow settlement of soilparticles from sediment laden water. The purpose is to greatlylimit the transport of e
4、roded soil from the construction site bywater runoff.1.3 The practices presented herein are intended to ensuregood workmanship and quality and are not necessarily ad-equate for all purposes in view of the wide variety of possiblesediments and performance objectives.1.4 The values stated in SI units
5、are to be regarded as thestandard. The values in inch-pound units are provided forinformation only.1.5 This practice offers an organized collection of informa-tion or a series of options and does not recommend a specificcourse of action. This document cannot replace education orexperience and should
6、 be used in conjunction with professionaljudgment. Not all aspects of this guide may be applicable in allcircumstances. This ASTM standard is not intended to repre-sent or replace the standard of care by which the adequacy ofa given professional service must be judged, nor should thisdocument be app
7、lied without consideration of a projects manyunique aspects. The word “Standard” in the title of thisdocument means only that the document has been approvedthrough the ASTM consensus process.1.6 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It
8、is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:D 653 Terminology Relating to Soil, Rock, and ContainedFluids2D 3740 Practice for
9、Minimum Requirements for AgenciesEngaged in the Testing and/or Inspection of Soil and Rockas Used in Engineering Design and Construction2D 4632 Test Method for Grab Breaking Load and Elonga-tion of Geotextiles3D 6461 Specification For Silt Fence Materials42.2 AASHTO Standard:M288-96 Standard Specifi
10、cation for Geotextile Specifica-tion for Highway Applications53. Terminology3.1 For definitions of terms used in this practice, seeTerminology D 653.4. Significance and Use4.1 Proper installation is critical to effective performance ofsilt fence. This practice presents procedures for installing silt
11、fence that have been shown to result in silt fence installationsthat effectively redirect and impound surface runoff and,thereby, provide effective sediment control.5. Controlling Material Specifications5.1 All materials used for temporary silt fence shall conformwith the specification requirements
12、of ASTM SpecificationD 6461 unless otherwise specified in the controlling projectspecifications.6. Certification6.1 The contractor shall provide to the engineer all certifi-cations required by the controlling material specification.1This practice is under the jurisdiction of ASTM Committee D18 on So
13、il andRock and is the direct responsibility of Subcommittee D18.25 on Erosion andSediment Control Technology.Current edition approved July 10, 2003. Published September 2003. Originallyapproved in 1999. Last previous edition approved in 1999 as D 646299.2Annual Book of ASTM Standards, Vol 04.08.3Ann
14、ual Book of ASTM Standards, Vol 04.13.4Annual Book of ASTM Standards, Vol 04.09.5Available from AASHTO.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.7. Sampling, Tes
15、ting, and Acceptance7.1 Silt fence materials shall be subject to sampling andtesting in accordance with and to verify conformance with thecontrolling material specification.8. Silt Fence Installation8.1 MaterialsSilt fence materials shall conform to therequirements of Section 5. Unless otherwise spe
16、cified, the siltfence installation shall conform to the following:8.1.1 The geotextile used for temporary silt fence may ormay not be supported between posts with wire or polymericmesh.8.1.2 The minimum height above ground for the silt fenceshall be 600 mm (2.0 ft). Minimum embedment depth shall be1
17、50 mm (0.5 ft).8.1.3 Maximum post spacing shall be based on the fabricsupport or, if unsupported, on elongation as measured inaccordance with Test Method D 4632. Supported silt fenceshall have a maximum post spacing of 1.2 m (4 ft). Unsup-ported silt fence with elongation $ 50 % shall also have amax
18、imum post spacing of 1.2 m (4 ft). Unsupported silt fencewith elongation 50 % shall have a maximum post spacing of2 m (6.5 ft).8.1.4 Wood, steel, or synthetic support posts having aminimum length of 1 m (3.3 ft) plus the burial depth may beused. They shall be of sufficient strength to resist damaged
19、uring installation and to support the applied loads due tomaterial build up behind the silt fence.NOTE 1It has been found that hardwood posts having dimensions ofat least 30 3 30 mm (1.2 3 1.2 in.), No. 2 Southern Pine at least 65 3 65mm (2.5 3 2.5 in.) or steel posts of UTL or C shape, weighing 600
20、 g per300 mm (1.3 lb/ft) have performed satisfactorily.8.1.5 Wire or polymer support fence shall be at least 750mm (2.5 ft) high and strong enough to support applied loads.Polymer support fences shall meet the same ultraviolet degra-dation requirements as the geotextile.NOTE 2Wire support fence havi
21、ng at least 6 horizontal wires, andbeing at least 14 gage wire have performed satisfactorily. Vertical wiresshould be a maximum of 150 mm (0.5 ft) apart.8.2 Construction:8.2.1 Trench ConstructionThe bottom of the silt fencegeotextile shall be buried in a “J” configuration to a minimumdepth of 150 mm
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD64622003STANDARDPRACTICEFORSILTFENCEINSTALLATION 栅栏 安装 标准 实施 规范 PDF

链接地址:http://www.mydoc123.com/p-522575.html