ASTM D6276-1999a(2006) Standard Test Method for Using pH to Estimate the Soil-Lime Proportion Requirement for Soil Stabilization《用PH值估计土壤稳定要求的土壤石灰比例的标准试验方法》.pdf
《ASTM D6276-1999a(2006) Standard Test Method for Using pH to Estimate the Soil-Lime Proportion Requirement for Soil Stabilization《用PH值估计土壤稳定要求的土壤石灰比例的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM D6276-1999a(2006) Standard Test Method for Using pH to Estimate the Soil-Lime Proportion Requirement for Soil Stabilization《用PH值估计土壤稳定要求的土壤石灰比例的标准试验方法》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 6276 99a (Reapproved 2006)Standard Test Method forUsing pH to Estimate the Soil-Lime Proportion Requirementfor Soil Stabilization1This standard is issued under the fixed designation D 6276; the number immediately following the designation indicates the year oforiginal adoption or, in
2、the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This test method provides a means for estimating thesoil-lime proportion requireme
3、nt for stabilization of a soil. Thistest method is performed on soil passing the 425-m (No. 40)sieve. The optimum soil-lime proportion for soil stabilization isdetermined by tests of specific characteristics of stabilized soilsuch as unconfined compressive strength or plasticity index.1.2 Some highl
4、y alkaline by-products (lime kiln dust, ce-ment kiln dust, and so forth) have been successfully used tostabilize soil. This test method is not intended for thesematerials and any such product would need to be tested forspecific characteristics as indicated in 1.1.1.3 This test method is used to dete
5、rmine the lowestpercentage of lime that results in a soil-lime pH of 12.4.1.4 Lime is not an effective stabilizing agent for all soils.Some soil components such as sulfates, phosphates, organics,and so forth can adversely affect soil-lime reactions and mayproduce erroneous results using this test me
6、thod.1.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referen
7、ced Documents2.1 ASTM Standards:2C51 Terminology Relating to Lime and Limestone (as usedby the Industry)C 977 Specification for Quicklime and Hydrated Lime forSoil StabilizationD 421 Practice for Dry Preparation of Soil Samples forParticle-Size Analysis and Determination of Soil Con-stantsD 653 Term
8、inology Relating to Soil, Rock, and ContainedFluidsD 1193 Specification for Reagent WaterD 1293 Test Methods for pH of WaterD 2216 Test Methods for Laboratory Determination of Wa-ter (Moisture) Content of Soil and Rock by MassD 3740 Practice for Minimum Requirements for AgenciesEngaged in the Testin
9、g and/or Inspection of Soil and Rockas Used in Engineering Design and ConstructionD 4753 Guide for Evaluating, Selecting, and SpecifyingBalances and Standard Masses for Use in Soil, Rock, andConstruction Materials TestingE11 Specification for Wire Cloth and Sieves for TestingPurposesE 145 Specificat
10、ion for Gravity-Convection And Forced-Ventilation Ovens3. Terminology3.1 Definitions:3.2 Refer to Terminology C51 for definitions of termsrelating to lime.3.3 Refer to Terminology D 653 for terms relating to soil.3.4 Definitions of Terms Specific to This Standard:3.4.1 buffer solutiona solution of s
11、pecific pH value usedto calibrate the pH meter.3.4.2 free limelime in a soil-lime mixture that has notdissociated into calcium and hydroxyl ions.3.4.3 hydrated limelime that is predominately calciumhydroxide (Ca(OH)2) or a mixture of calcium hydroxide andmagnesium oxide (MgO) or magnesium hydroxide(
12、Mg(OH)2).3.4.4 limea general term which, for the purpose of thistest method, includes hydrated lime and quicklime.3.4.5 lime contentthe ratio expressed as a percentage ofthe mass of lime to the dry mass of soil.3.4.6 lime stabilizationaddition of lime to a soil in suffi-cient quantities to promote l
13、ong-term pozzolanic reactions thatresult in strength gain and permanent improvement in stability.1This test method is under the jurisdiction ofASTM Committee D18 on Soil andRock and is the direct responsibility of Subcommittee D18.15 on Stabilization andAdmixtures.Current edition approved May 1, 200
14、6. Published June 2006. Originallyapproved in 1998. Last previous edition approved in 1999 as D 6276 99a.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standar
15、ds Document Summary page onthe ASTM website.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.Textural improvement alone, such as reduced plasticity, isoften referred to
16、 as “modification.” Modification can be ef-fected by lime addition rates less than those required forstabilization and may not be permanent.3.4.7 pHthe negative logarithm of the effective hydrogen-ion concentration or hydrogen-ion activity, in gram equivalentsper litre. The pH values range from 0 to
17、 14; where pH 7represents neutrality, pH values less than 7 indicate increasingacidity, and pH values greater than 7 indicate increasingalkalinity.3.4.8 quicklimelime that is predominately calcium oxide(CaO) or calcium oxide in association with magnesium oxide(MgO).3.4.9 stabilizationa process to im
18、prove the engineeringproperties of soils at a site.4. Summary of Test Method4.1 A series of specimens is prepared containing a range ofpercentages of lime content in soil. Measurements of pH aremade on slurries of the specimens to determine the minimumlime content of the soil-lime mixture to obtain
19、a pH of at least12.4.4.2 The pH of at least 12.4 achieved in this test methodresults from free lime remaining in the soil-lime mixture.Normally, the pH of the specific lime being used for soilstabilization should be determined and used as the indicatorpH.5. Significance and Use5.1 The soil-lime pH t
20、est is performed as a test to indicatethe soil-lime proportion needed to maintain the elevated pHnecessary for sustaining the reactions required to stabilize asoil. The test derives from Eades and Grim.35.2 Performance tests are normally conducted in a labora-tory to verify the results of this test
21、method.5.3 This test method will not provide reliable informationrelative to the potential reactivity of a particular soil, nor willit provide information on the magnitude of increased strengthto be realized upon treatment of this soil with the indicatedpercentage of lime.5.4 This test method can be
22、 used to estimate the percentageof lime as hydrated lime or quicklime needed to stabilize soil.5.5 Agricultural lime (crushed limestone) will not stabilizesoil.NOTE 1Notwithstanding the statements on precision and bias con-tained in this test method: The precision of this test method is dependenton
23、the competence of the personnel performing it and the suitability of theequipment and facilities used. Agencies that meet the criteria of PracticeD 3740 are generally considered capable of competent and objectivetesting. Users of this test method are cautioned that compliance withPractice D 3740 doe
24、s not itself ensure reliable testing. Reliable testingdepends on several factors; Practice D 3740 provides a means of evalu-ating some of those factors.6. Apparatus6.1 Balance or Scale:6.1.1 A balance or scale for determining the mass of soiland lime having a minimum capacity of 600 g and meeting th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD62761999A2006STANDARDTESTMETHODFORUSINGPHTOESTIMATETHESOILLIMEPROPORTIONREQUIREMENTFORSOILSTABILIZATION

链接地址:http://www.mydoc123.com/p-522034.html