1、Designation: D5898/D5898M 96 (Reapproved 2013)Standard Guide forStandard Details for Adhered Sheet Waterproofing11. Scope1.1 This guide covers details for typical conditions encoun-tered in adhered sheet waterproofing on below grade structuresand plazas.1.2 This guide does not cover liquid applied w
2、aterproofing.1.3 The values stated in either SI units or inch-pound unitsare to be regarded separately as standard. The values stated ineach system may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combiningvalues from the two systems may result in non-con
3、formancewith the standard.2. Referenced Documents2.1 ASTM Standards:2D1079 Terminology Relating to Roofing and Waterproofing3. Terminology3.1 DefinitionsFor definitions of terms used in this guide,refer to Terminology D1079.3.2 Definitions of Terms Specific to This Standard:3.2.1 adhered sheet water
4、proofing, na system consistingof one or more plies of organic or glass fiber felts or fabricsapplied in hot or cold bitumens or modified bitumens, or one ormore plies of a manufactured sheet of modified bitumen thatmay be reinforced or laminated with scrim or polyethylene, ora polymeric or vulcanize
5、d elastomeric membrane. The systemis applied directly to concrete or masonry surfaces belowgrade.3.2.2 elevated slab, na framed or suspended concrete slabover a habitable or useable space.3.2.3 fillet, nliquid applied modified bitumen or masticused at internal corners before membrane application to
6、form atransition of less than 90.3.2.4 reinforcement, ngenerally, one or more strips ofmembrane, felts, or fabrics, installed at corners and overconstruction joints.3.3 Abbreviations:3.3.1 LAMliquid applied membrane.3.3.2 SSstainless steel.3.3.3 EJexpansion joint.3.3.4 NRnot recommended.3.3.5 MTLnon
7、corrosive metal.4. Significance and Use4.1 This guide illustrates general details for below grade andplaza waterproofing. It serves as a guide that will enable thedesigner to prepare complete waterproofing details for eachspecific condition that occurs on a project.5. Drawings5.1 This guide is not a
8、ll inclusive. The designer shoulddetail all typical and special conditions on the project, payingparticular attention to transitions in plane and intersection ofdifferent details. The applicator should provide shop drawingsof each condition to confirm field conditions and to verify hisunderstanding
9、of the design intent.5.2 Waterproofing membranes and reinforcement are indi-cated on the figures as a single thick line, regardless of thenumber of plies.5.3 Protection layers have been omitted for clarity. SeeSection 6.6. Protection6.1 Protection materials are required over all waterproofingto prev
10、ent damage from backfill, reinforcing chairs, andconstruction traffic, unless the membrane system incorporatesan integral protection layer. Protection also is required wheremembranes terminate above grade and may be exposed toultraviolet light.6.2 Materials for protection include: asphalt compositio
11、nboards, plastic drainage panels, low density expanded polysty-rene boards, and extruded polystyrene insulation. Low densityexpanded polystyrene boards and some types of plastic drain-age panels are not suitable for protection on horizontal sur-faces. Protection materials are loose-laid on horizonta
12、l mem-branes and attached to vertical membranes with compatibleadhesives. They should be installed as soon as possible afterthe membrane, or each portion of it, is completed or watertested.1This guide is under the jurisdiction of ASTM Committee D08 on Roofing andWaterproofing and is the direct respo
13、nsibility of Subcommittee D08.22 on Water-proofing and Dampproofing Systems.Current edition approved May 1, 2013. Published May 2013. Originallyapproved in 1996. Last previous edition approved in 2005 as D5898 96 (2005)1.DOI: 10.1520/D5898_D5898M-96R13.2For referenced ASTM standards, visit the ASTM
14、website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United S
15、tates17. Reinforcement7.1 Reinforcement is required for built-up and modifiedbitumen membranes at transitions, such as internal and externalcorners and at static concrete construction joints and cracks.Reinforcement also is required where reinforcing bars, pipes,and conduits penetrate the membrane.
16、Separate reinforcementgenerally is not required for polymeric and vulcanized elasto-meric membranes.7.2 Reinforcement usually is installed before the membranebut may be applied over it. Refer to the membrane manufac-turer for details.7.3 The minimum reinforcement is one ply. Systems using amultiple
17、ply membrane usually require two or more reinforce-ment plies, whereas single ply modified bitumen systemsgenerally require one.7.4 When additional plies are used as reinforcement, theyshould extend at least 150 mm 6 in. beyond the corner orpenetration and each succeeding ply should extend 75 mm 3in
18、. beyond the previous ply.7.5 Where reinforcing bars penetrate waterproofing, such asat rock anchors and wall to slab transitions, they should besealed with reinforcing plies finger cut around the bars or liquidapplied membrane or both.7.6 Some manufacturers require cementitious cants or aliquid app
19、lied waterproofing or mastic fillet at reentrant angles,chamfered external corners, and other special conditions to beimplemented during construction. These should be indicatedon project details.7.7 Details should recognize the normal sequencing ofconstruction. Foundation walls may be cast before or
20、 afterslabs on grade. Structural slabs are cast after walls. Water-proofing of individual elements frequently follows thissequence, for example, walls are waterproofed before thestructural slab is cast. The resultant cold joints may bedynamic.8. Penetrations8.1 Flashing at penetrations should accomm
21、odate differen-tial movement between the slab and the pipe, conduit, or drain.For built-up and modified bitumen membranes, lead reinforc-ing is recommended where pipes or drains are installed insleeves but is optional where they are cast into the wall or slab.Cast iron drains, cast into the slab wit
22、h flanges flush with orslightly below the slab, are preferred. Additional plies ofreinforcement should be installed at drains.8.2 Wearing courses on plaza decks move differentiallyfrom the structural slab. To prevent damage to the drainagesystem or flashing rupture from this movement, drains shouldb
23、e installed in the structural slab with inlets in the wearingcourse divorced from the drain body.9. Expansion Joints9.1 Structural expansion joints should be designed to permitindependent movement of structural elements on each side ofthe joint. Control joints should be located to permit non-reversi
24、ble movement and may be dynamic. The size andlocation of expansion and control joints should be determinedby the structural engineer. Expansion joint covers should bedesigned to maintain continuity at all changes in plane. Theyshould be designed to prevent displacement when subjected towater pressur
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD5898D5898M199620131875STANDARDGUIDEFORSTANDARDDETAILSFORADHEREDSHEETWATERPROOFING 粘合 防水 标准 细节 指南

链接地址:http://www.mydoc123.com/p-520995.html