ASTM D5680-2014 3039 Standard Practice for Sampling Unconsolidated Solids in Drums or Similar Containers《圆筒或类似容器内未固结粒子取样的标准实施规程》.pdf
《ASTM D5680-2014 3039 Standard Practice for Sampling Unconsolidated Solids in Drums or Similar Containers《圆筒或类似容器内未固结粒子取样的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM D5680-2014 3039 Standard Practice for Sampling Unconsolidated Solids in Drums or Similar Containers《圆筒或类似容器内未固结粒子取样的标准实施规程》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D5680 14Standard Practice forSampling Unconsolidated Solids in Drums or SimilarContainers1This standard is issued under the fixed designation D5680; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revi
2、sion. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers typical equipment and methods forcollecting samples of unconsolidated solids in drums or similarcontainers
3、. These methods are adapted specifically for sam-pling drums having a volume of 110 U.S. gal (416 L) or less.These methods are applicable to hazardous material, product,or waste. Specific sample collection and handling requirementsshould be described in the site-specific work plan.1.2 The values sta
4、ted in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its us
5、e. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C702 Practice for Reducing Samples ofAggregate to TestingSizeD4547 Guide fo
6、r Sampling Waste and Soils for VolatileOrganic CompoundsD4687 Guide for General Planning of Waste SamplingD4700 Guide for Soil Sampling from the Vadose ZoneD6009 Guide for Sampling Waste PilesD6044 Guide for Representative Sampling for Managementof Waste and Contaminated MediaD6051 Guide for Composi
7、te Sampling and Field Subsam-pling for Environmental Waste Management ActivitiesD6063 Guide for Sampling of Drums and Similar Containersby Field PersonnelD6311 Guide for Generation of Environmental Data Relatedto Waste Management Activities: Selection and Optimiza-tion of Sampling DesignD6323 Guide
8、for Laboratory Subsampling of Media Relatedto Waste Management ActivitiesD5088 Practice for Decontamination of Field EquipmentUsed at Waste SitesD5283 Practice for Generation of Environmental Data Re-lated to Waste Management Activities: Quality Assuranceand Quality Control Planning and Implementati
9、onD5451 Practice for Sampling Using a Trier SamplerE300 Practice for Sampling Industrial ChemicalsD5633 Practice for Sampling with a Scoop2.2 NSC Document:Accident Prevention Manual for Industrial Operations,199232.3 Government Documents:4EPA/600/2-86/013 Drum Handling Practices at HazardousWaste Si
10、tes, January 1986EPA/540/4-91/001 Soil Sampling and Analysis for VolatileCompounds, February 1991Occupational Safety and Health Guidance Manual for Haz-ardous Waste Site Activities, National Institute for Occu-pational Safety and Health (NIOSH), Occupational Safetyand Health Administration (OSHA), U
11、.S. Coast Guard(USCG), and U.S Environmental Protection Agency(EPA), October 19853. Terminology3.1 Definitions:3.1.1 bondingtouching the sample equipment to the drumto form an electrically conductive path to minimize potentialelectrical differences between the sampling equipment and thedrum, reducin
12、g the buildup of static electricity.3.1.2 bungusually a 2-in. (5.1-cm) or34-in. (1.3-cm)diameter threaded plug designed specifically to close a bunghole.1This practice is under the jurisdiction of ASTM Committee D34 on WasteManagement and is the direct responsibility of Subcommittee D34.01.02 onSamp
13、ling Techniques.Current edition approved June 1, 2014. Published June 2014. Originallyapproved in 1995. Last previous edition approved in 2010 as D5680 10. DOI:10.1520/D5680-14.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. F
14、or Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from National Safety Council, P.O. Box 558, Itasca, IL 60143-0558.4Available from the Superintendent of Documents, U. S. Government PrintingOffice, Washington, DC 20402.Copy
15、right ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13.1.3 bung holean opening in a barrel or drum throughwhich it can be filled, emptied, or vented.3.1.4 deheadingremoval of the lid of a closed-head drum;usually accomplished with a drum dehea
16、der.3.1.5 druma cylindrical non-bulk container of 5 to 110U.S. gal (19 to 416 L) capacity.3.1.6 paila small container, usually with a capacity of 5U.S. gal. Pails typically have bungs or spouts, or the entire lidcan be removed.3.1.7 paperworkall required site documentation, whichmay include the mani
17、fests, waste profiles, material safety datasheets (MSDS), site forms, sample labels, custody seals, andchain of custody forms.3.1.8 unconsolidatedfor solid material, the characteristicof being uncemented or uncompacted, or both, and separatedeasily into smaller particles.3.1.9 work plana plan specif
18、ic to a particular site; forconducting activities specified in the plan.4. Summary of Practice4.1 The drum and its contents are inspected, and appropriatesampling equipment is selected. A clean sampling device isthen used to auger, shovel, scoop, or core into the unconsoli-dated solid material to be
19、 sampled. The sample is collected andplaced in a sample container. After use the sampling device isthen either disposed of or cleaned and decontaminated beforere-use.5. Significance and Use5.1 This practice is intended for use in collecting samples ofunconsolidated solid materials from drums or simi
20、larcontainers, including those that are unstable, ruptured, orcompromised otherwise. Special handling procedures (forexample, remote drum opening, over pressurized drumopening, drum deheading, etc.) are described in EPA/600/2-86/013 Drum Handling Practices at Hazardous Waste Sites.6. Interferences6.
21、1 The condition of the materials to be sampled and thecondition and accessibility of the drums will have a significantimpact on the selection of sampling equipment and techniquesused to recover representative samples.7. Pre-Sampling7.1 General Principles and Precautions:7.1.1 Samples should be colle
22、cted in accordance with anappropriate work plan (Practice D5283, and Guides D4687,D6044, D6051, D6063, and D6311). This plan must include aworker health and safety section because there are potentialhazards associated with opening drums as well as potentiallyhazardous contents. See Occupational Safe
23、ty and Health Guid-ance Manual for Hazardous Waste Site Activities for informa-tion on health and safety at hazardous waste sites.7.1.2 Correct sampling procedures must be applied to theconditions as they are encountered. It is impossible to specifyrigid rules describing the exact manner of sample c
24、ollectionbecause of unknowns associated with each solid samplingsituation. It is essential that the samples be collected by atrained and experienced sampler because of the various con-ditions under which drummed solids must be sampled.7.1.3 To be able to make probability or confidence state-ments co
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD568020143039STANDARDPRACTICEFORSAMPLINGUNCONSOLIDATEDSOLIDSINDRUMSORSIMILARCONTAINERS 圆筒 类似 容器 固结

链接地址:http://www.mydoc123.com/p-520429.html