ASTM D5299 D5299M-2017 Standard Guide for Decommissioning of Groundwater Wells Vadose Zone Monitoring Devices Boreholes and Other Devices for Environmental Activities《地下水井、渗流区监测装置、.pdf
《ASTM D5299 D5299M-2017 Standard Guide for Decommissioning of Groundwater Wells Vadose Zone Monitoring Devices Boreholes and Other Devices for Environmental Activities《地下水井、渗流区监测装置、.pdf》由会员分享,可在线阅读,更多相关《ASTM D5299 D5299M-2017 Standard Guide for Decommissioning of Groundwater Wells Vadose Zone Monitoring Devices Boreholes and Other Devices for Environmental Activities《地下水井、渗流区监测装置、.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D5299 99 (Reapproved 2012)1D5299/D5299M 17Standard Guide forDecommissioning of Groundwater Wells, Vadose ZoneMonitoring Devices, Boreholes, and Other Devices forEnvironmental Activities1This standard is issued under the fixed designation D5299;D5299/D5299M; the number immediately follow
2、ing the designation indicatesthe year of original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon () indicates an editorial change since the last revision or reapproval.1 NOTEEditorial changes were m
3、ade throughout in February 2012.1. Scope Scope*1.1 This guide covers procedures that are specifically related to permanent decommissioning (closure) of the following asapplied to environmental activities. It is intended for use where solid or hazardous materials or wastes are found, or whereconditio
4、ns occur requiring the need for decommissioning. The following devices are considered in this guide:1.1.1 A borehole used for geoenvironmental purposes (see Note 1),1.1.2 Monitoring wells,1.1.3 Observation wells,1.1.4 Injection wells (see Note 2),1.1.5 Piezometers,1.1.6 Wells used for the extraction
5、 of contaminated groundwater, the removal of floating or submerged materials other thanwater such as gasoline or tetrachloroethylene, or other devices used for the extraction of soil gas,1.1.7 A borehole used to construct a monitoring well, and1.1.8 Any other well or boring that houses a vadose zone
6、 monitoring device.1.2 Temporary decommissioning of the above is not covered in this guide.NOTE 1This guide may be used to decommission boreholes where no contamination is observed at a site (see Practice D420 for details); however,the primary use of the guide is to decommission boreholes and wells
7、where solid or hazardous waste have been identified. Methods identified in this guidecan also be used in other situations such as the decommissioning of water supply wells and boreholes where water contaminated with nonhazardouspollutants (such as nitrates or sulfates) are present. This guide should
8、 be consulted in the event that a routine geotechnical investigation indicates thepresence of contamination at a site.NOTE 2The term “well” is used in this guide to denote monitoring wells, piezometers, or other devices constructed in a manner similar to a well.Some of the devices listed such as inj
9、ection and extraction wells can be decommissioned using this guide for information, but are not specifically coveredin the text.NOTE 3Details on the decommissioning of multiple-screened wells are not provided in this guide due to the many methods used to construct thesetypes of wells and the numerou
10、s types of commercially available multiple-screened well systems. However, in some instances, the methods presentedin this guide may be used with few changes. An example of how this guide may be used is the complete removal of the multiple-screened wells byoverdrilling.NOTE 1This guide may be used t
11、o decommission boreholes where no contamination is observed at a site (see Practice D420 for details); however,the primary use of the guide is to decommission boreholes and wells where solid or hazardous waste have been identified. Methods identified in this guidecan also be used in other situations
12、 such as the decommissioning of water supply wells and boreholes where water contaminated with nonhazardouspollutants (such as nitrates or sulfates) are present. This guide should be consulted in the event that a routine geotechnical study indicates the presenceof contamination at a site. Consult an
13、d follow national, state, or local regulations as they may control required decommissioning procedures.NOTE 2The term “well” is used in this guide to denote monitoring wells, piezometers, or other devices constructed in a manner similar to a well.Some of the devices listed such as injection and extr
14、action wells can be decommissioned using this guide for information, but are not specifically coveredin the text.NOTE 3Details on the decommissioning of multiple-screened wells are not provided in this guide due to the many methods used to construct thesetypes of wells and the numerous types of comm
15、ercially available multiple-screened well systems. However, in some instances, the methods presentedin this guide may be used with few changes. An example of how this guide may be used is the complete removal of the multiple-screened wells byoverdrilling.1 This guide is under the jurisdiction of AST
16、M Committee D18 on Soil and Rock and is the direct responsibility of Subcommittee D18.21 on Groundwater and VadoseZone Investigations.Current edition approved Feb. 15, 2012Dec. 15, 2017. Published December 2012January 2018. Originally approved in 1992. Last previous edition approved in 20052012as D5
17、299 99(2005).(2012)1. DOI: 10.1520/D5299-99R12E01.10.1520/D5299_D5299M-17.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately d
18、epict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.*A Summary of Changes section appears at the end of this standardCopyright ASTM Internat
19、ional, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States11.3 Most monitoring wells and piezometers are intended primarily for water quality sampling, water level observation, or soilgas sampling, or combination thereof, to determine quality. Many wells are relativel
20、y small in diameter typically 2.5 to 20 cm 1to 8 in. and are used to monitor for hazardous chemicals in groundwater. Decommissioning of monitoring wells is necessary to:1.3.1 Eliminate the possibility that the well is used for purposes other than intended,1.3.2 Prevent migration of contaminants into
21、 an aquifer or between aquifers,1.3.3 Prevent migration of contaminants in the vadose zone,1.3.4 Reduce the potential for vertical or horizontal migration of fluids in the well or adjacent to the well, and1.3.5 Remove the well from active use when the well is no longer capable of rehabilitation, or
22、has failed structurally; is nolonger requiredneeded for monitoring; is no longer capable of providing representative samples or is providing unreliable samples;oris required to be decommissioned; or to meet regulatory requirements.NOTE 4The determination of whether a well is providing a representati
23、ve water quality sample is not defined in this guide. Examples of when arepresentative water quality sample may not be collected include the biological or chemical clogging of well screens, a drop in water level to below thebase of the well screen, or complete silting of a tail pipe. the screen. The
24、se conditions may indicate that a well is not functioning properly.correctly.1.4 This guide is intended to provide information for effective permanent closure of wells so that the physical structure of thewell does not provide a means of hydraulic communication between aquifers aquifers, with above
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD5299D5299M2017STANDARDGUIDEFORDECOMMISSIONINGOFGROUNDWATERWELLSVADOSEZONEMONITORINGDEVICESBOREHOLESANDOTHERDEVICESFORENVIRONMENTALACTIVITIES

链接地址:http://www.mydoc123.com/p-519415.html