ASTM D5163-2005a Standard Guide for Establishing Procedures to Monitor the Performance of Service Level I Coatings in an Operating Nuclear Power Plant《核电厂运行时使用的I级涂层性能监测程序制定的标准指南》.pdf
《ASTM D5163-2005a Standard Guide for Establishing Procedures to Monitor the Performance of Service Level I Coatings in an Operating Nuclear Power Plant《核电厂运行时使用的I级涂层性能监测程序制定的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM D5163-2005a Standard Guide for Establishing Procedures to Monitor the Performance of Service Level I Coatings in an Operating Nuclear Power Plant《核电厂运行时使用的I级涂层性能监测程序制定的标准指南》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 5163 05aStandard Guide forEstablishing Procedures to Monitor the Performance ofCoating Service Level I Coating Systems in an OperatingNuclear Power Plant1This standard is issued under the fixed designation D 5163; the number immediately following the designation indicates the year ofo
2、riginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers procedures for establishing a programto m
3、onitor the performance of Coating Service Level I coatingsystems in operating nuclear power plants. Monitoring is an ongoing process of evaluating the condition of the in-servicecoating systems.1.2 It is the intent of this guide to provide a recommendedbasis for establishing a coatings monitoring pr
4、ogram, not tomandate a singular basis for all programs. Variations orsimplifications of the program described in this guide may beappropriate for each operating nuclear power plant dependingon their licensing commitments. Similar guidelines are appli-cable for Coating Service Level III and other are
5、as outsidecontainment.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior
6、to use.2. Referenced Documents2.1 ASTM Standards:2D 610 Test Method for Evaluating Degree of Rusting onPainted Steel SurfacesD 714 Test Method for Evaluating Degree of Blistering ofPaintsD 1186 Test Methods for Nondestructive Measurement ofDry Film Thickness of Nonmagnetic Coatings Applied toa Ferro
7、us BaseD 3359 Test Methods for Measuring Adhesion by Tape TestD 4537 Guide for Establishing Procedures to Qualify andCertify Personnel Performing Coating Work Inspection inNuclear FacilitiesD 4541 Test Method for Pull-Off Strength of CoatingsUsing Portable Adhesion TestersD 6677 Test Method for Eval
8、uating Adhesion by KnifeF 1130 Practice for Inspecting the Coating System of a Ship2.2 ANSI Standard:N45.2.6Qualification of Inspection, Examination, andTesting Personnel for Nuclear Power Plants32.3 SSPC Standard:SSPC-PA 2Measurement of Dry Paint Thickness WithMagnetic Gages4SSPC-VIS 2Standard Meth
9、od of Evaluating Degree ofRusting on Painted Steel Surfaces43. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.1 coating maintenance work, nall-inclusive term as-sociated with coating work that expressly relates to repair,refurbishment, or replacement of an existing coating. (See a
10、lsocoating work.)3.1.2 in-service coatings monitoring, nsystematic pro-gram established to assess and document the condition of anexisting coating system with respect to prescribed performanceattributes.4. Significance and Use4.1 Establishment of an in-service coatings monitoring pro-gram permits pl
11、anning and prioritization of coatings mainte-nance work as needed to maintain coating integrity andperformance in nuclear Coating Service Level I coating sys-tems. For additional information on nuclear maintenancecoating work, refer toASTM Manual on Maintenance Coatingsfor Nuclear Power Plants.54.2
12、A coatings monitoring program enables early identifica-tion and detection of potential problems in coating systems.1This guide is under the jurisdiction of ASTM Committee D33 on ProtectiveCoating and Lining Work for Power Generation Facilities and is the directresponsibility of Subcommittee D33.04 o
13、n Quality Systems and Inspection.Current edition approved March 1, 2005. Published April 2005. Originallyapproved in 1991. Last previous edition approved in 2005 as D 5163 05.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For
14、 Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036.4Available from SSPC: The Society for Protective Coatings, 40 24th St., 6thFloo
15、r, Pittsburgh, PA 15222-4656.5Available from ASTM International Headquarters, 100 Barr Harbor Dr., WestConshohocken, PA 19428-2959.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.Some Coating Service Level I coating systems may be kn
16、ownin advance to be suspect, deficient, or unqualified. Monitoringcoating performance will assist in developing follow-up pro-cedures to resolve any significant deficiency relative to coatingwork.4.3 Degraded coatings may generate debris under designbasis accident conditions that could adversely aff
17、ect the per-formance of the post-accident safety systems. A coatingsmonitoring program may be required to fulfill safety analysisreport and generic letter commitments for Coating ServiceLevel I coating work in a nuclear power plant facility.5. Responsibility5.1 The owner/operator shall identify the
18、department orgroup within the organization to be responsible for establishingthe applicable requirements for activities or procedures cov-ered by this guide and shall document the scope of theirresponsibility. Owner/operator delegation of this responsibilityto other outside qualified organizations i
19、s permitted and shallbe documented.5.2 It is the responsibility of the owner/operator or hisdesignee performing these activities to specify the detailedmethods and procedures for meeting the applicable require-ments of this guide.5.3 The owner/operator or his designee shall assign acoordinator to be
20、 responsible for supervising coating inspec-tion activities, data collection and documentation, and forensuring that inspection personnel are adequately trained andqualified.5.4 The owner/operator shall assign responsibility for evalu-ating the results of inspection activities carried out under thec
21、oatings performance monitoring program.5.5 In the event of conflict, users of this guide mustrecognize that the licensees plant-specific quality assuranceprogram and licensing commitments shall prevail with respectto the coating performance monitoring process.6. Frequency6.1 Frequency of in-service
22、coating inspection monitoringshall be determined by the owner/operator. In operating nuclearpower plants certain monitoring activities may be restricted tomajor maintenance outages or refueling outages. It is a goodpractice to perform inspections during each refueling outage orduring other major mai
23、ntenance outages as needed.7. Records and Past History7.1 Coating performance will depend on the operatingconditions experienced by the coating systems. Records ofthese conditions shall be obtained for each operating unit.These may include, but not be limited to, ambient conditions,temperatures, hum
24、idity, immersion, splash and spillage, chemi-cal exposures, radiation exposures, previous decontaminationprocedures, abrasion and physical abuse, and start-up/shutdown frequency. Any change in service criteria or modi-fications of the physical design shall be identified and dated.7.2 The last two pe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD51632005ASTANDARDGUIDEFORESTABLISHINGPROCEDURESTOMONITORTHEPERFORMANCEOFSERVICELEVELICOATINGSINANOPERATINGNUCLEARPOWERPLANT

链接地址:http://www.mydoc123.com/p-519030.html