ASTM D4537-2012(2018) Standard Guide for Establishing Procedures to Qualify and Certify Personnel Performing Coating and Lining Work Inspection in Nuclear Facilities.pdf
《ASTM D4537-2012(2018) Standard Guide for Establishing Procedures to Qualify and Certify Personnel Performing Coating and Lining Work Inspection in Nuclear Facilities.pdf》由会员分享,可在线阅读,更多相关《ASTM D4537-2012(2018) Standard Guide for Establishing Procedures to Qualify and Certify Personnel Performing Coating and Lining Work Inspection in Nuclear Facilities.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D4537 12 (Reapproved 2018)Standard Guide forEstablishing Procedures to Qualify and Certify PersonnelPerforming Coating and Lining Work Inspection in NuclearFacilities1This standard is issued under the fixed designation D4537; the number immediately following the designation indicates th
2、e year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide delineates the requirements for develop
3、mentof procedures for the qualification and certification of person-nel who perform inspection of coating and lining work.Establishment of qualification requirements to verify confor-mance to specified requirements for nuclear facility coatingand lining work is necessary to assure satisfactory perfo
4、rmanceof the inspections and to avoid compromising safety-relatedcoating systems.1.2 The intent of this guide is to provide a uniform inter-pretation of the requirements in ANSI/ASME N45.2.6 orANSI/ASME NQA-1 as applicable, for the inspection ofcoating and lining work in nuclear facilities.1.3 It is
5、 the intent of this guide to provide a recommendedbasis for qualification and certification, not to mandate asingular basis for all qualifications. Variations or simplifica-tions of the qualifications described in this guide may beappropriate for special coating and lining work other thansafety-rela
6、ted coating and lining systems. Similarly, the quali-fication and certification process might be abbreviated for workof minor scope such as touch-up.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this s
7、tandard to establish appro-priate safety, health, and environmental practices and deter-mine the applicability of regulatory limitations prior to use.1.5 This international standard was developed in accor-dance with internationally recognized principles on standard-ization established in the Decisio
8、n on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2D4538 Terminology Relating to Protective Coating andLining Work for Power Generation
9、 FacilitiesD5144 Guide for Use of Protective Coating Standards inNuclear Power PlantsD5498 Guide for Developing a Training Program for Per-sonnel Performing Coating and Lining Work Inspectionfor Nuclear Facilities2.2 ANSI/ASME Standards:3ANSI/ASME N45.2.6 Qualifications of Inspection,Examination, an
10、d Testing Personnel for Nuclear PowerPlantsANSI/ASME NQA-1 Quality Assurance Program Require-ments for Nuclear Facilities3. Terminology3.1 DefinitionsDefinitions for use with this standard areshown in Terminology D4538 or other applicable standards.3.2 Definitions of Terms Specific to This Standard:
11、3.2.1 certification, nwritten documentation of qualifica-tion.3.2.2 coating and lining work inspection, na phase ofquality control that, by means of examination, observation, ormeasurement, determines the conformance of safety-relatedcoating or lining system applications to predetermined qualityrequ
12、irements. The term inspection as used in this standard shallbe understood to mean coating and lining work inspection.3.2.3 Level I, II, and III inspection, nindicative of the timein grade classification for personnel who perform coating andlining work inspection. Each level reflects progressive expe
13、ri-ence and responsibility. This term is separate from and differsdistinctly from Coating Service Levels. The latter term reflects1This guide is under the jurisdiction of ASTM Committee D33 on ProtectiveCoating and Lining Work for Power Generation Facilities and is the directresponsibility of Subcom
14、mittee D33.04 on Quality Systems and Inspection.Current edition approved Aug. 1, 2018. Published August 2018. Originallyapproved in 1986. Last previous edition approved in 2012 as D4537 12. DOI:10.1520/D4537-12R18.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM C
15、ustomer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036, http:/www.ansi.org.Copyright ASTM Inter
16、national, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards,
17、Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.1differing locations throughout a nuclear plant where safety-related and other coatings are found. (See Terminology sectionof Guide D5144 for definitions of Coating Service Levels I, II,and
18、III.)3.2.4 personnel performing coating work inspection,nindividuals whose job functions include but are not neces-sarily limited to coating and lining work inspection.3.2.5 qualifications, nskills, training, and experience re-quired for personnel to perform properly the duties and executethe respon
19、sibilities of the appropriate certification level.3.2.6 safety-related coating or lining system, na coating orlining system used inside or outside of the reactor containment,the detachment of which could adversely affect the safetyfunction of safety-related structures, systems, or components(SSC).3.
20、2.7 training, nthe program developed to ensure thatpersonnel receive the knowledge and skills necessary forqualification.4. Significance and Use4.1 The requirements of this guide apply to personnel whoperform coating and lining work inspection during (1)fabrication, (2) receipt of items at the const
21、ruction site, (3)construction, (4) pre-operational and startup testing, and (5)operational phases of nuclear facilities.4.2 It is the responsibility of each organization participatingin the project to ensure that only those personnel within theirrespective organizations who meet the requirements of
22、thisguide are permitted to perform coating and lining workinspection activities covered by this guide.4.3 The organization(s) responsible for establishing theapplicable requirements for activities covered by this guideshall be identified, and the scope of their responsibility shall bedocumented. Del
23、egation of this responsibility to other qualifiedorganizations is permitted and shall be documented.4.4 It is the responsibility of the organization performingthese activities to specify the detailed methods and proceduresfor meeting the requirements of this guide, unless thosemethods and procedures
24、 are otherwise specified in the contractdocuments.4.5 In the event of conflict, users of this guide mustrecognize that the licensees plant-specific quality assuranceprogram and licensing commitments shall prevail with respectto the process of qualifying personnel performing inspection ofcoating and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD453720122018STANDARDGUIDEFORESTABLISHINGPROCEDURESTOQUALIFYANDCERTIFYPERSONNELPERFORMINGCOATINGANDLININGWORKINSPECTIONINNUCLEARFACILITIESPDF

链接地址:http://www.mydoc123.com/p-517319.html