ASTM D4071-1984(2005) Standard Practice for Use of Portland Cement Concrete Bridge Deck Water Barrier Membrane Systems《硅酸盐水泥混凝土桥面防水膜的使用规程》.pdf
《ASTM D4071-1984(2005) Standard Practice for Use of Portland Cement Concrete Bridge Deck Water Barrier Membrane Systems《硅酸盐水泥混凝土桥面防水膜的使用规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM D4071-1984(2005) Standard Practice for Use of Portland Cement Concrete Bridge Deck Water Barrier Membrane Systems《硅酸盐水泥混凝土桥面防水膜的使用规程》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 4071 84 (Reapproved 2005)Standard Practice forUse of Portland Cement Concrete Bridge Deck Water BarrierMembrane Systems1This standard is issued under the fixed designation D 4071; the number immediately following the designation indicates the year oforiginal adoption or, in the case o
2、f revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers liquid applied, preformed, orbuilt-up water barrier membrane systems and
3、 their application;overlaid with bituminous concrete wearing courses, for use inthe protection of bridge decks from deleterious effects ofdeicing salts. Material use and specifications should be adaptedto conform to job and user requirements for new constructionor existing structures. This practice
4、is written as a guide for theuse of bridge deck water barrier systems only.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determin
5、e the applica-bility of regulatory limitations prior to use. Specific precau-tionary statements are given in Section 10.2. Referenced Documents2.1 ASTM Standards:2D 3743 Terminology Relating to Bridge Deck and Sub-structure Protection32.2 Other Documents:NCHRP Synthesis Report 57 Durability of Concr
6、ete BridgeDecks43. Terminology3.1 For definitions of terms used in this practice, refer toTerminology D 3743.4. Significance and Use4.1 This practice provides a guide for factors to be consid-ered prior to waterproofing bridge decks with water barriermembrane systems. It will provide guidance for sp
7、ecificationof materials, application of membrane systems, and placementof bituminous wearing courses. It may be used as a guide fornew construction or for rehabilitation of existing structures.5. Bridge Design and Specification Consideration5.1 Proper use of water barrier membranes with bituminousco
8、ncrete wearing courses requires consideration of certainelements during the design stage of new or existing bridges tobe treated and covered with a bituminous concrete wearingcourse.5.2 New bridge deck designs must include provision fordead loads including future systems.5.3 The deck surface finish
9、should be specified to allowproper use of the intended membrane system. Manufacturersrecommendations for surface finish should be reviewed forguidance on finishing freshly placed concrete or for repair ofexisting deck surfaces.5.4 Surface drains should be designed to allow positivedrainage to minimi
10、ze the penetration of water through thebituminous wearing course.5.5 Joint systems should be designed to provide adequatetermination points for the membrane. Membranes should notbe placed over expansion joints. Dams or expansion assembliesshould be provided to the height of the bituminous wearingcou
11、rse.5.6 Curbs or parapets, or both, should be designed forfunctional terminations. Manufacturers of membrane systemsshould be consulted for recommended termination details. Ifrough surfaces (such as granite curbs) are specified, a treatmentshould be specified to provide the surface smoothness requir
12、edfor the proper use of the membrane. Treatment of rough curbsmay be achieved with a leveling surface treatment with epoxymortar or other suitable materials.5.7 Decks should include weepholes to provide drainage forwater which penetrates through the bituminous wearing courseto the membrane level.5.8
13、 For bridges with significant grades (usually over 4 %) orthose which are subject to traffic acceleration, deceleration, orradial stresses (such as on ramps), the use of membranesystems may cause overlay movement. Membrane manufac-turers should be consulted for limitations on membrane use.1This prac
14、tice is under the jurisdiction of ASTM Committee D04 on Road andPaving Materials and is the direct responsibility of Subcommittee D04.32 onBridges and Structures.Current edition approved June 1, 2005. Published June 2005.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact
15、 ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Withdrawn.4Available from the National Cooperative Highway Reseacrh Program(NCHRP), Keck Center of the National Academies Transportation Re
16、search Board,500 Fifth Street, NW Washington, DC 20001.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.5.9 Service life and maintenance requirements should beconsidered when designing the water barrier and wearingsurface.5.10 Specifi
17、ed materials should be chemically and physi-cally compatible with specific emphasis on proper adhesion ofthe membrane and the bituminous wearing course.6. Bridge Construction6.1 A preconstruction conference should be held to assurethat the contractor is aware of all construction requirementswhich af
18、fect the membrane system.6.2 Inspectors should ensure that surface finish of theconcrete deck is acceptable for the use of the intendedmembrane system, usually an even float finish.6.3 Concrete decks or other components should be curedand dried for the required minimum time before installation ofthe
19、 membrane. Limitations on curing methods or curingmaterials should be observed. In most cases, the use ofmembrane curing compounds containing wax or oil should beprohibited.6.4 Care should be exercised to avoid the use of materialswhich are chemically or physically incompatible with themembrane syst
20、em to be used.7. Membrane Application7.1 Apreconstruction conference should be held to schedulemembrane application and placement of the bituminous wear-ing course.7.2 Prior to application, the bridge deck should be in-spected, deficiencies noted, and repairs made.7.3 Cleaning should be done prior t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD407119842005STANDARDPRACTICEFORUSEOFPORTLANDCEMENTCONCRETEBRIDGEDECKWATERBARRIERMEMBRANESYSTEMS

链接地址:http://www.mydoc123.com/p-516211.html