ASTM D3147-2006(2013) Standard Test Method for Testing Stop-Leak Additives for Engine Coolants《发动机冷却剂用止漏添加剂的标准试验方法》.pdf
《ASTM D3147-2006(2013) Standard Test Method for Testing Stop-Leak Additives for Engine Coolants《发动机冷却剂用止漏添加剂的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM D3147-2006(2013) Standard Test Method for Testing Stop-Leak Additives for Engine Coolants《发动机冷却剂用止漏添加剂的标准试验方法》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D3147 06 (Reapproved 2013)Standard Test Method for TestingStop-Leak Additives for Engine Coolants1This standard is issued under the fixed designation D3147; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of l
2、ast revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope1.1 This test method covers screening proc
3、edures for thepreliminary evaluation of leak-stopping materials intended foruse in engine cooling systems. (Heavy-duty users are referredto X1.2.21 in Specification D4485 for additional information.)1.2 The values stated in SI units are to be regarded as thestandard. The values given in parentheses
4、are for informationonly.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prio
5、r to use. Specific warningstatements are given in 10.1.2. Referenced Documents2.1 ASTM Standards:2D1176 Practice for Sampling and Preparing Aqueous Solu-tions of Engine Coolants or Antirusts for Testing Purposes3. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.1 leakingfrequent dr
6、ops forming (more than 5 drops/min).3.1.2 sealedcompletely plugged with no leaking or seep-ing.3.1.3 seepingoccasional drops forming (fewer than 5drops/min).4. Summary of Test Method4.1 Aheated test solution is circulated through a pressurizedcubical metal reservoir which contains a slit and holes t
7、osimulate leaks in an engine cooling system. The effectivenessof the stop-leak material is measured by its ability to seal theleaks under the prescribed conditions of flow rate, temperature,pressure, and time.4.2 The presence of particles in the test material that arelarger than 0.84 mm (0.033 in.)
8、or the presence of gumming orgelling in stop-leak additives is determined by screening a testsolution through a 850-m (U.S. No. 20) standard sieve. Thescreening is done both before and after the circulating test.Particles that remain on the sieve may be too large to passthrough some passages of the
9、cooling system.5. Significance and Use5.1 The screening procedures simulate the conditions oftemperature, pressure, and circulation encountered in service.This test method will indicate whether a product is suitable forfurther evaluation in vehicles.6. Apparatus (See Fig. 1)6.1 Reservoir:6.1.1 The r
10、eservoir shall be constructed of stainless steel,aluminum, or brass, 260 by 175 by 260-mm (10 by 7 by 10 in.)high, and the total capacity of the assembled unit shall bebetween 12 and 13.5 L (3.2 to 3.6 gal). The reservoir shall havea 20-mm (34-in.) flange at the top, to which a cover plate isfitted.
11、6.1.2 The reservoir and cover shall have a minimum thick-ness of 1.6 mm (0.06 in.) in order to withstand a pressure of140 kPa (20 psi).6.1.3 A drain shall be located either on one side or thebottom of the reservoir to facilitate drainage of the testsolution. The reservoir outlet to the circulating p
12、ump (suctionside) shall be located near the bottom of Side C. The reservoirinlet from the circulating pump (discharge side) shall belocated near the top of Side D. A13-mm (12-in.) elbow shall bewelded to the reservoir inlet opening (inner surface of Side D)so that the liquid flow is directed towards
13、 Side A.6.1.4 The cover plate of the reservoir shall be attached withbolts and sealed with neoprene gasket material. Openingsaccommodate a pressure gage (0 to 10 kPa (0 to 30 psi)minimum)/vent valve assembly.1This test method is under the jurisdiction of ASTM Committee D15 on EngineCoolants and Rela
14、ted Fluids and is the direct responsibility of SubcommitteeD15.09 on Simulated Service Tests.Current edition approved May 1, 2013. Published June 2013. Originallyapproved in 1972. Last previous edition approved in 2006 as D3147 06. DOI:10.1520/D3147-06R13.2For referenced ASTM standards, visit the AS
15、TM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. Unite
16、d States16.1.5 Openings, 64 by 64 mm (212 by 212 in.), centered onSide A and Side B accommodate test plates (as described inSection 7). An inlet for regulated air at 103 6 14 kPa (15 6 2psi) and a thermocouple probe are shown in Side C.6.1.6 A liquid collection pan or pans shall be placed underthe r
17、eservoir in a position that will allow collection of coolantthat has leaked from test openings during operation of theapparatus. A transparent safety shield shall enclose the reser-voir fully. This shield will be arranged to deflect any spray intothe collection pans. The safety shield must be in pla
18、ce any timethe reservoir is hot or pressurized, or both.6.2 Circulation Pump,3capable of circulating a minimum of30 L (8 gal) of water per minute against zero head pressure,shall be used. The packing seal of the pump shall be capable ofwithstanding 140 kPa (20 psi) and 104C (220F). Inlet andoutlet c
19、onnections shall be not less than12 in. (12 mm)standard water pipe.6.3 Heating Element, shall be of the immersion cartridgetype and shall have a power rating of approximately 1500 W.It shall be installed above the suction pipe of the circulationpump and shall be capable of heating the filled system
20、to 88C(190F). A temperature controller shall be used with thethermocouple to control power to the heating element andcoolant temperature. An electrical pressure switch should alsobe used to interrupt power to the heater, in the event that excesspressure is generated.6.4 The reservoir should be equip
21、ped with a suitable pres-sure relief valve to prevent an over-pressure in the event of aproblem with the regulated air source.3An Eastern Industries Model P34C, manufactured by Eastern IndustriesDivision Laboratory for Electronics Inc., 1525 Concord Pike, Wilmington, DE19803, and a Graingers catalog
22、ue pump No. IP787 have been used successfully.A,B,C,DSides of reservoir RRegulated air, 103 kPa (15 psi)GPressure gage, 0-210 kPa, (0-30 psi) vent valve TThermocouple foil, temperature controller, and wellHBrass test section, holes VFill opening (ball valve)SBrass test section, slit WPressure relief
23、 valve, 137 kPa (20 psi)FIG. 1 Leak Test ApparatusD3147 06 (2013)26.5 A means of interrupting power to the heater in the eventof excessive fluid loss or overheating is necessary.6.6 U.S.A. Standard Testing Sieve, per SpecificationE1195, 850 m in an 8 in. (203 mm) or 10 in. (254 mm) FHframe.7. Test P
24、lates (See Fig. 2)7.1 The test plates shall be constructed of solid brass plates,102 by 102 by 0.20 to 0.25 mm (4 by 4 by 0.008 to 0.010 in.),with bolt holes for attachment to the reservoir. Neoprene gasketmaterial shall be used to seal the plates. A complete set shallconsist of fifteen plates: two
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD314720062013STANDARDTESTMETHODFORTESTINGSTOPLEAKADDITIVESFORENGINECOOLANTS 发动机 冷却剂 用止漏 添加剂 标准 试验

链接地址:http://www.mydoc123.com/p-514154.html