ASTM D2962-1997(2007) Standard Test Method for Calculating Volume-Temperature Correction For Coal-Tar Pitches《计算煤焦油沥青体积-温度修正值的标准试验方法》.pdf
《ASTM D2962-1997(2007) Standard Test Method for Calculating Volume-Temperature Correction For Coal-Tar Pitches《计算煤焦油沥青体积-温度修正值的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM D2962-1997(2007) Standard Test Method for Calculating Volume-Temperature Correction For Coal-Tar Pitches《计算煤焦油沥青体积-温度修正值的标准试验方法》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 2962 97 (Reapproved 2007)An American National StandardStandard Test Method forCalculating Volume-Temperature Correction For Coal-TarPitches1This standard is issued under the fixed designation D 2962; the number immediately following the designation indicates the year oforiginal adopti
2、on or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers calculation of the amount ofexpansion or contract
3、ion of a volume of liquid coal-tar pitchdue to a change of temperature.2. Referenced Documents2.1 ASTM Standards:2D70 Test Method for Density of Semi-Solid BituminousMaterials (Pycnometer Method)D71 Test Method for Relative Density of Solid Pitch andAsphalt (Displacement Method)3. Summary of Test Me
4、thod3.1 Different pitches expand or contract at different rateswhich vary in relation to the relative density of the material.The corresponding values are listed in Table 1.4. Significance and Use4.1 Coal tar pitch is shipped or stored, or both, at varioustemperatures, consequently a means is requir
5、ed to correctvolume to a specified temperature.5. Procedure5.1 Determine the relative density of the pitch at 60/60F(15.6/15.6C) in accordance with Test Methods D70orD71,whichever is most suitable.5.2 Find the coefficient of expansion per degree Celsius orFahrenheit for the particular material from
6、Table 1.5.3 Multiply the coefficient by the number of degreesbetween the standard temperature and the actual temperature ofthe material as measured.5.4 To the product of 5.3 add 1.000. The result is expansionfactor A.5.5 If the temperature of the material as measured is abovethe standard temperature
7、, divide the measured volume byfactor A (5.4). If the temperature of the material as measured isbelow the standard temperature, multiply the measured volumeby factor A (5.4).5.6 ExampleA tank of pitch contains 95,000 gal at 350F(177C). Calculate the volume at 60F (15.6C) as follows:The relative dens
8、ity 60/60F (15.6/15.6C) according to TestMethod D70is 1.28.From Table 1 the coefficient is 280 3 106per F.The temperature difference of 350 60 = 290 .290 3 280 3 106= 0.0812A = 1.0812The corrected volume is 95,000/1.0812 = 87 865 gal at 60F(15.6C).6. Keywords6.1 coal tar pitch; correction factor; pi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD296219972007STANDARDTESTMETHODFORCALCULATINGVOLUMETEMPERATURECORRECTIONFORCOALTARPITCHES 计算 煤焦油

链接地址:http://www.mydoc123.com/p-513850.html