《ASTM C969M-2017 Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric)《已安装预制混凝土污水管线渗漏验收试验的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C969M-2017 Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric)《已安装预制混凝土污水管线渗漏验收试验的标准实施规程》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C969M 02 (Reapproved 2009)C969M 17Standard Practice forInfiltration and Exfiltration Acceptance Testing of InstalledPrecast Concrete Pipe Sewer Lines (Metric)1This standard is issued under the fixed designation C969M; the number immediately following the designation indicates the year o
2、foriginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers procedures for testing installed prec
3、ast concrete pipe sewer lines using either water infiltration orexfiltration acceptance limits to demonstrate the integrity of the installed materials and construction procedure.1.2 This practice is the SI companion of Practice C969.NOTE 1The owner shall specify the following: who will conduct, obse
4、rve, and furnish labor, furnish material and measuring devices, and pay forthe tests; who is responsible for determining local groundwater conditions; and which test is to be conducted, that is, an infiltration test or an exfiltrationtest.NOTE 2The user of this practice is advised that test criteria
5、 presented in this practice are similar to those in general use. Pipe, 600-mm diameter orlarger, may be accepted by visual inspection when testing for infiltration.1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof th
6、e user of this standard to establish appropriate safety and health practices and determine the applicability of regulatorylimitations prior to use.1.4 This international standard was developed in accordance with internationally recognized principles on standardizationestablished in the Decision on P
7、rinciples for the Development of International Standards, Guides and Recommendations issuedby the World Trade Organization Technical Barriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and Related Products3. Terminology3.1 Definitio
8、nsFor definitions of terms relating to concrete pipe, see Terminology C822.4. Summary of Practice4.1 Determine the groundwater conditions surrounding the section of sewer to be tested and select the type of test to beconducted.4.2 For the infiltration test, the amount of water leaking into the sewer
9、 line is measured, and the rate of infiltration is determined.If the rate is less than or equal to the allowable limit, the section of sewer tested is acceptable.4.3 For the exfiltration test, the sewer line is filled with water to the specified test head and the rate of water loss is determined.If
10、the rate is less than or equal to the allowable limit, the section of sewer tested is acceptable.5. Significance and Use5.1 This is not a routine test. The values recorded are applicable only to the sewer being tested and at the time of testing.6. Preparation of the Sewer Line6.1 The sewer line shal
11、l be free of debris prior to testing.1 This practice is under the jurisdiction of ASTM Committee C13 on Concrete Pipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved June 1, 2009April 15, 2017. Published July 2009May 2017. Originally approved in 19
12、82. Last previous edition approved in 20022009 asC969M 02.C969M 02(2009). DOI: 10.1520/C0969M-02R09.10.1520/C0969M-17.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to
13、 the standards Document Summary page on the ASTM website.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes
14、 accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. Unite
15、d States16.2 The manholes, the ends of the branches, laterals, wyes, and stubs to be included in the test shall be plugged. All plugs shallbe secured to prevent leakage blowout due to testing pressure.7. Procedure7.1 Infiltration Testing:7.1.1 Conduct testing from manhole to manhole or between more
16、than two manholes. The length of main tested shall not exceed213 m.7.1.2 Stop all dewatering operations and allow the groundwater to return to its normal level. Infiltration testing shall not be usedunless the groundwater level is at least 0.6 m above the crown of the pipe for the entire length of t
17、he test section.7.1.3 Plug all pipe outlets discharging into the upstream manhole.7.1.4 Measure the groundwater elevation and determine the average head over the test section.7.1.5 Measure infiltration leakage at the outlet of the test section. Because leakage allowances are small, measurements are
18、bestmade by either timing the filling of a small container of known volume, or by directing flow into a container for a specified timeand measuring the content, or by using small weirs.7.1.6 If the measured rate of leakage is less than or equal to the allowable leakage in accordance with 8.1, the se
19、ction of sewertested is acceptable.7.1.7 If the test section tails, it is not prohibited that it be repaired and retested in accordance with this practice.7.2 Exfiltration Testing:7.2.1 Conduct testing from manhole to manhole or between more than two manholes. The length of main tested shall not exc
20、eed213 m.7.2.2 Determine the groundwater elevation at both ends of the test section. If the groundwater level is less than 0.6 m abovethe crown of the pipe measured from the highest elevation of the sewer, the exfiltration test shall be used.7.2.3 Plug all pipe outlets discharging into the upstream
21、manhole and the test section outlet, and fill the sewer line with water.7.2.4 At the upstream manhole, the test head shall be established as a minimum of 0.6 m above the crown of the pipe, or at least0.6 m above existing groundwater, whichever is higher.7.2.5 Allow the pipe to remain saturated for a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC969M2017STANDARDPRACTICEFORINFILTRATIONANDEXFILTRATIONACCEPTANCETESTINGOFINSTALLEDPRECASTCONCRETEPIPESEWERLINESMETRIC

链接地址:http://www.mydoc123.com/p-509009.html