ASTM C969M-2002(2009) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric)《安装的预制混凝土污水管道的表面渗入和渗出的验收检验的标准实施规.pdf
《ASTM C969M-2002(2009) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric)《安装的预制混凝土污水管道的表面渗入和渗出的验收检验的标准实施规.pdf》由会员分享,可在线阅读,更多相关《ASTM C969M-2002(2009) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines (Metric)《安装的预制混凝土污水管道的表面渗入和渗出的验收检验的标准实施规.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 969M 02 (Reapproved 2009)Standard Practice forInfiltration and Exfiltration Acceptance Testing of InstalledPrecast Concrete Pipe Sewer Lines (Metric)1This standard is issued under the fixed designation C 969M; the number immediately following the designation indicates the year oforigi
2、nal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers procedures for testing installedprecast con
3、crete pipe sewer lines using either water infiltrationor exfiltration acceptance limits to demonstrate the integrity ofthe installed materials and construction procedure.1.2 This practice is the SI companion of Practice C 969.NOTE 1The owner shall specify the following: who will conduct,observe, and
4、 furnish labor, furnish material and measuring devices, andpay for the tests; who is responsible for determining local groundwaterconditions; and which test is to be conducted, that is, an infiltration test oran exfiltration test.NOTE 2The user of this practice is advised that test criteria presente
5、din this practice are similar to those in general use. Pipe, 600-mm diameteror larger, may be accepted by visual inspection when testing forinfiltration.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of th
6、is standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C 822 Terminology Relating to Concrete Pipe and RelatedProducts3. Terminology3.1 DefinitionsFor definitions of terms re
7、lating to con-crete pipe, see Terminology C 822.4. Summary of Practice4.1 Determine the groundwater conditions surrounding thesection of sewer to be tested and select the type of test to beconducted.4.2 For the infiltration test, the amount of water leaking intothe sewer line is measured, and the ra
8、te of infiltration isdetermined. If the rate is less than or equal to the allowablelimit, the section of sewer tested is acceptable.4.3 For the exfiltration test, the sewer line is filled withwater to the specified test head and the rate of water loss isdetermined. If the rate is less than or equal
9、to the allowablelimit, the section of sewer tested is acceptable.5. Significance and Use5.1 This is not a routine test. The values recorded areapplicable only to the sewer being tested and at the time oftesting.6. Preparation of the Sewer Line6.1 The sewer line shall be free of debris prior to testi
10、ng.6.2 The manholes, the ends of the branches, laterals, wyes,and stubs to be included in the test shall be plugged. All plugsshall be secured to prevent leakage blowout due to testingpressure.7. Procedure7.1 Infiltration Testing:7.1.1 Conduct testing from manhole to manhole or betweenmore than two
11、manholes. The length of main tested shall notexceed 213 m.7.1.2 Stop all dewatering operations and allow the ground-water to return to its normal level. Infiltration testing shall notbe used unless the groundwater level is at least 0.6 m above thecrown of the pipe for the entire length of the test s
12、ection.7.1.3 Plug all pipe outlets discharging into the upstreammanhole.7.1.4 Measure the groundwater elevation and determine theaverage head over the test section.7.1.5 Measure infiltration leakage at the outlet of the testsection. Because leakage allowances are small, measurementsare best made by
13、either timing the filling of a small containerof known volume, or by directing flow into a container for aspecified time and measuring the content, or by using smallweirs.7.1.6 If the measured rate of leakage is less than or equal tothe allowable leakage in accordance with 8.1, the section ofsewer t
14、ested is acceptable.1This practice is under the jurisdiction of ASTM Committee C13 on ConcretePipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved June 1, 2009. Published July 2009. Originally approvedin 1982. Last previous edition approved in 2002
15、 as C 969M 02.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor
16、Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.7.1.7 If the test section tails, it is not prohibited that it berepaired and retested in accordance with this practice.7.2 Exfiltration Testing:7.2.1 Conduct testing from manhole to manhole or betweenmore than two manholes. The leng
17、th of main tested shall notexceed 213 m.7.2.2 Determine the groundwater elevation at both ends ofthe test section. If the groundwater level is less than 0.6 mabove the crown of the pipe measured from the highestelevation of the sewer, the exfiltration test shall be used.7.2.3 Plug all pipe outlets d
18、ischarging into the upstreammanhole and the test section outlet, and fill the sewer line withwater.7.2.4 At the upstream manhole, the test head shall beestablished as a minimum of 0.6 m above the crown of thepipe, or at least 0.6 m above existing groundwater, whicheveris higher.7.2.5 Allow the pipe
19、to remain saturated for a period longenough to allow water absorption in the pipe, a minimum of 4h and up to a maximum of 72 h. After the absorption period,refill the pipe to the required test head.7.2.6 Measure the leakage loss over a timed test period. Theminimum test period shall be 15 min and th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC969M20022009STANDARDPRACTICEFORINFILTRATIONANDEXFILTRATIONACCEPTANCETESTINGOFINSTALLEDPRECASTCONCRETEPIPESEWERLINESMETRIC

链接地址:http://www.mydoc123.com/p-509008.html