《ASTM C969-2002 Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《安装的预制混凝土污水管道的表面渗入和渗出的验收检验的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C969-2002 Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines《安装的预制混凝土污水管道的表面渗入和渗出的验收检验的标准实施规程》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 969 02Standard Practice forInfiltration and Exfiltration Acceptance Testing of InstalledPrecast Concrete Pipe Sewer Lines1This standard is issued under the fixed designation C 969; the number immediately following the designation indicates the year oforiginal adoption or, in the case
2、of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope1.1 This practi
3、ce covers procedures for testing installedprecast concrete pipe sewer lines using either water infiltrationor exfiltration acceptance limits to demonstrate the integrity ofthe installed materials and construction procedure.1.2 A complete metric companion to this practice has beendevelopedC 969M; the
4、refore, no metric equivalents arepresented in this practice.NOTE 1The owner shall specify the following: who will conduct,observe, and furnish labor, furnish material and measuring devices, andpay for the tests; who is responsible for determining local groundwaterconditions; and which test is to be
5、conducted, that is, an infiltration test oran exfiltration test.NOTE 2The user of this practice is advised that test criteria presentedin this practice are similar to those in general use. Pipe, 24-in. diameter orlarger, may be accepted by visual inspection when testing for infiltration.1.3 This sta
6、ndard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1
7、ASTM Standards:C 822 Terminology Relating to Concrete Pipe and RelatedProducts23. Terminology3.1 DefinitionsFor definitions of terms relating to con-crete pipe, see Terminology C 822.4. Summary of Practice4.1 Determine the groundwater conditions surrounding thesection of sewer to be tested and selec
8、t the type of test to beconducted.4.2 For the infiltration test, the amount of water leaking intothe sewer line is measured, and the rate of infiltration isdetermined. If the rate is less than or equal to the allowablelimit, the section of sewer tested is acceptable.4.3 For the exfiltration test, th
9、e sewer line is filled withwater to the specified test head and the rate of water loss isdetermined. If the rate is less than or equal to the allowablelimit, the section of sewer tested is acceptable.5. Significance and Use5.1 This is not a routine test. The values recorded areapplicable only to the
10、 sewer being tested and at the time oftesting.6. Preparation of the Sewer Line6.1 The sewer shall should be free of debris prior to testing.6.2 The manholes, the ends of the branches, laterals, wyesand stubs to be included in the test shall be plugged. All plugsshall be secured to prevent leakage bl
11、owout due to testingpressure.7. Procedure7.1 Infiltration Testing:7.1.1 Conduct testing from manhole to manhole or betweenmore than two manholes. The length of main tested shall notexceed 700 ft.7.1.2 Stop all dewatering operations and allow the ground-water to return to its normal level. Infiltrati
12、on testing shall notbe used unless the groundwater level is at least 2 ft above thecrown of the pipe for the entire length of the test section.7.1.3 Plug all pipe outlets discharging into the upstreammanhole.7.1.4 Measure the groundwater elevation and determine theaverage head over the test section.
13、7.1.5 Measure infiltration leakage at the outlet of the testsection. Because leakage allowances are small, measurementsare best made by either timing the filling of a small containerof known volume, or by directing flow into a container for aspecified time and measuring the content, or by using smal
14、lweirs.7.1.6 If the measured rate of leakage is less than or equal to1This practice is under the jurisdiction of ASTM Committee C13 on ConcretePipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved Aug 10, 2002. Published October 2002. Originallypubl
15、ished as C 96982. Last previous edition C 96994(2000).2Annual Book of ASTM Standards, Vol 04.05.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.the allowable leakage in accordance with 8.1, the section ofsewer tested is acceptable.7.
16、1.7 If the test section fails, it is not prohibited that it berepaired and retested in accordance with this practice.7.2 Exfiltration Testing:7.2.1 Conduct testing from manhole to manhole or betweenmore than two manholes. The length of main tested shall notexceed 700 ft.7.2.2 Determine the groundwat
17、er elevation at both ends ofthe test section. If the groundwater level is less than 2 ft abovethe crown of the pipe measured from the highest elevation ofthe sewer, the exfiltration test shall be used.7.2.3 Plug all pipe outlets discharging into the upstreammanhole and the test section outlet. Fill
18、the sewer line withwater.7.2.4 At the upstream manhole the test head shall beestablished as minimum of 2 ft above the crown of the pipe, orat least 2 ft above existing groundwater, whichever is higher.7.2.5 Allow the pipe to remain saturated for a period longenough to allow water absorption in the p
19、ipe, a minimum of 4h and up to a maximum of 72 h. After the absorption period,refill the pipe to the required test head.7.2.6 Measure the leakage loss over a timed test period. Theminimum test period shall be 15 min and the maximum shallnot exceed 24 h.7.2.7 If the measured rate of leakage is less t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC9692002STANDARDPRACTICEFORINFILTRATIONANDEXFILTRATIONACCEPTANCETESTINGOFINSTALLEDPRECASTCONCRETEPIPESEWERLINES

链接地址:http://www.mydoc123.com/p-509004.html