ASTM C828-2011 Standard Test Method for Low-Pressure Air Test of Vitrified Clay Pipe Lines《上釉陶土管道的低压空气试验的标准试验方法》.pdf
《ASTM C828-2011 Standard Test Method for Low-Pressure Air Test of Vitrified Clay Pipe Lines《上釉陶土管道的低压空气试验的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM C828-2011 Standard Test Method for Low-Pressure Air Test of Vitrified Clay Pipe Lines《上釉陶土管道的低压空气试验的标准试验方法》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C828 11Standard Test Method forLow-Pressure Air Test of Vitrified Clay Pipe Lines1This standard is issued under the fixed designation C828; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A n
2、umber in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope1.1 This test method defines procedures for testing vitrifi
3、edclay pipe lines, using low-pressure air, to demonstrate theintegrity of the installed line. Refer to Practice C12.1.2 This test method shall be performed on lines afterconnection laterals, if any, have been plugged and bracedadequately to withstand the test pressure, and after the trencheshave bee
4、n backfilled for a sufficient time to generate asignificant portion of the ultimate trench load on the pipe line.The time between completion of the backfill operation andlow-pressure air testing shall be determined by the approvingauthority.1.3 This test method may also be used as a preliminary test
5、,which enables the installer to demonstrate the condition of theline prior to backfill and further construction activities.1.4 This test method is suitable for testing gravity-flowsewer pipe constructed of vitrified clay or combinations of clayand other pipe materials.1.5 Terminology C896 is to be u
6、sed for clarification ofterminology in this test method.1.6 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.7 This standard does not pu
7、rport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C
8、12 Practice for Installing Vitrified Clay Pipe LinesC1091 Test Method for Hydrostatic Infiltration Testing ofVitrified Clay Pipe LinesC896 Terminology Relating to Clay Products3. Summary of Test Method3.1 The section of the line to be tested is plugged.Air, at lowpressure, is introduced into the plu
9、gged line. The line passesthe test if the rate of air loss, as measured by pressure drop,does not exceed a specified amount in a specified time. Thismay be determined by the use of Table 1, or calculated by useof the formulas in Appendix X1.4. Hazards4.1 The low-pressure air test may be dangerous to
10、 personnelif, through lack of understanding or carelessness, a line isover-pressurized or plugs are installed improperly. It is ex-tremely important that the various plugs be installed so as toprevent the sudden expulsion of a poorly installed or partiallyinflated plug. As an example of the hazard,
11、a force of 250 lbf(1110 N) is exerted on an 8-in. (205-mm) plug by an internalpressure of 5 psi (35 kPa). Observe the following safetyprecautions:4.1.1 No one shall be allowed in the manholes during testingbecause of the hazards.4.1.2 Install all plugs securely.4.1.3 When lines are to be tested, it
12、may be necessary thatthe plugs be braced as an added safety factor.4.1.4 Do not over-pressurize the lines.5. Preparation of the Line5.1 Air may pass through the walls of dry pipe. A wettedinterior pipe surface is desirable and will produce moreconsistent test results. Usually moisture absorbed from
13、thebackfill is sufficient to cope with this situation. Where practi-cal, clean the line prior to testing to wet the pipe surface andeliminate debris.6. Procedure6.1 Determine the test time for the section of line to betested using Table 1 or Table X1.1 or the formulas inAppendixX1.6.2 Plug all openi
14、ngs in the test section.1This test method is under the jurisdiction ofASTM Committee C04 on VitrifiedClay Pipe and is the direct responsibility of Subcommittee C04.20 on Methods ofTest and Specifications.Current edition approved Jan. 1, 2011. Published January 2011. Originallyapproved in 1975. Last
15、previous edition approved in 2006 as C828 06. DOI:10.1520/C0828-11.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM we
16、bsite.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.6.3 Add air until the internal pressure of the line is raised toapproximately 4.0 psi (28 kPa). After this pressure is reached,allow the pressure to stabilize. The pressure will n
17、ormally dropas the air temperature stabilizes. This usually takes 2 to 5 min,depending on the pipe size. The pressure should be reduced to3.5 psi (24 kPa) before starting the test.6.4 Start the test when the pressure is at 3.5 psi (24 kPa). Ifa 1 psi (6.9 kPa) drop does not occur within the test tim
18、e, theline has passed. If the pressure drop is more than 1 psi (6.9 kPa)during the test time, the line is presumed to have failed the test.If the line fails the test, segmental testing may be utilized solelyto determine the location of leaks, if any, but not for theacceptance test as required by thi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC8282011STANDARDTESTMETHODFORLOWPRESSUREAIRTESTOFVITRIFIEDCLAYPIPELINES 上釉 陶土 管道 低压 空气 试验 标准 方法 PDF

链接地址:http://www.mydoc123.com/p-508455.html