1、Designation: C617/C617M 15Standard Practice forCapping Cylindrical Concrete Specimens1This standard is issued under the fixed designation C617/C617M; the number immediately following the designation indicates the yearof original adoption or, in the case of revision, the year of last revision. A numb
2、er in parentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the U.S. Department of Defense.1. Scope*1.1 This practice covers apparatus, materials, and proce
3、-dures for capping freshly molded concrete cylinders with neatcement and hardened cylinders and drilled concrete cores withhigh-strength gypsum paste or sulfur mortar.1.2 The values stated in either SI units or inch-pound unitsare to be regarded separately as standard. The values stated ineach syste
4、m may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combiningvalues from the two systems may result in non-conformancewith the standard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is therespo
5、nsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. For specificprecaution statements see 4.3.1 and 6.2.4.1.2. Referenced Documents2.1 ASTM Standards:2C109/C109M Test Method for Compress
6、ive Strength ofHydraulic Cement Mortars (Using 2-in. or 50-mm CubeSpecimens)C150 Specification for Portland CementC472 Test Methods for Physical Testing of Gypsum, Gyp-sum Plasters and Gypsum ConcreteC595 Specification for Blended Hydraulic CementsC1231/C1231M Practice for Use of Unbonded Caps inDet
7、ermination of Compressive Strength of Hardened Con-crete Cylinders2.2 ANSI Standard:3B46.1 Standard for Surface Texture (Surface, Roughness,Waviness and Lay)3. Significance and Use3.1 This practice describes procedures for providing planesurfaces on the ends of freshly molded concrete cylinders,hard
8、ened cylinders, or drilled concrete cores when the endsurfaces do not conform with the planeness and perpendicu-larity requirements of applicable standards. Practice C1231/C1231M describes alternative procedures using unbonded capsor pad caps.4. Capping Equipment4.1 Capping PlatesNeat cement caps an
9、d high-strengthgypsum-paste caps shall be formed against a glass plate at least6mm14 in. thick, a machined metal plate at least 11 mm0.45 in. thick, or a polished plate of granite or diabase at least75 mm 3 in. thick. Sulfur mortar caps shall be formed againstsimilar metal or stone plates except tha
10、t the recessed areawhich receives molten sulfur shall not be deeper than 12 mm12 in. In all cases, plates shall be at least 25 mm 1 in.greater in diameter than the test specimen and the workingsurfaces shall not depart from a plane by more than 0.05 mm0.002 in. in 150 mm 6 in. The surface roughness
11、of newlyfinished metal plates shall not exceed that set forth in Table 4of American National Standard B46.1, or 3.2 m 125 in. forany type of surface and direction of lay. The surface, whennew, shall be free of gouges, grooves, or indentations beyondthose caused by the finishing operation. Metal plat
12、es that havebeen in use shall be free of gouges, grooves, and indentationsgreater than 0.25 mm 0.010 in. deep or greater than 30 mm20.05 in.2 in surface area.NOTE 1A Rockwell hardness of 48 HRC is suggested for cappingplates of devices used to form sulfur mortar caps.4.2 Alignment DevicesSuitable al
13、ignment devices, such asguide bars or bulls-eye levels, shall be used in conjunctionwith capping plates to ensure that no single cap will departfrom perpendicularity to the axis of a cylindrical specimen by1This practice is under the jurisdiction of ASTM Committee C09 on Concreteand ConcreteAggregat
14、es and is the direct responsibility of Subcommittee C09.61 onTesting for Strength.Current edition approved April 1, 2015. Published May 2015. Originallyapproved in 1968. Last previous edition approved in 2012 as C617/C617M 12.DOI: 10.1520/C0617_C0617M-15.2For referenced ASTM standards, visit the AST
15、M website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036
16、, http:/www.ansi.org.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1more than 0.5 (See Note 2). The same requirement isapplicable to the relationship between the axis o
17、f the alignmentdevice and the surface of a capping plate when guide bars areused. In addition, the location of each bar with respect to itsplate must be such that no cap will be off-centered on a testspecimen by more than 2 mm 116 in.NOTE 2A deviation from perpendicularity of 0.5 is equal to a slope
18、of approximately 1 mm in 100 mm 18 in. in 12 in.4.3 Melting Pots for Sulfur MortarsPots used for meltingsulfur mortars shall be equipped with automatic temperaturecontrols and shall be made of metal or lined with a material thatis nonreactive with molten sulfur.4.3.1 WarningMelting pots equipped wit
19、h peripheralheating will ensure against accidents during reheating ofcooled sulfur mixture that have a crusted-over surface. Whenusing melting pots not so equipped, a build-up of pressureunder the hardened surface crust on subsequent reheating maybe avoided by use of a metal rod that contacts the bo
20、ttom of thepot and projects above the surface of the fluid sulfur mix as itcools. The rod should be of sufficient size to conduct enoughheat to the top on reheating to melt a ring around the rod firstand thus avoid the development of pressure.Alarge metal ladlecan be substituted for the rod.4.3.1.1
21、Use sulfur melting pots in a hood to exhaust thefumes to outdoors. Heating over an open flame is dangerousbecause the flash point of sulfur is approximately 207C405F and the mixture can ignite due to overheating. If themixture starts to burn, covering will snuff out the flame.Recharge the pot with f
22、resh material after the flame has beenextinguished.5. Capping Materials5.1 The strength of the capping material and the thickness ofthe caps shall conform to the requirements of Table 1.5.1.1 If sulfur mortar, high strength gypsum paste and othermaterials except neat cement paste are to be used to t
23、estconcrete with a strength greater than 50 MPa 7000 psi andtheir compressive strength is less than the cylinder compressivestrength, the manufacturer or the user of the material mustprovide documentation:5.1.1.1 That the average strength of 15 cylinders cappedwith the material is not less than 98 %
24、 of the average strengthof 15 companion cylinders capped with neat cement paste or 15cylinders ground plane to within 0.05 mm 0.002 in.5.1.1.2 That the standard deviation of the strengths of thecapped cylinders is not greater than 1.57 times that of thestandard deviation of the reference cylinders.5
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC617C617M2015STANDARDPRACTICEFORCAPPINGCYLINDRICALCONCRETESPECIMENS 压顶 圆柱 混凝土 试样 标准 实践 规程 PDF

链接地址:http://www.mydoc123.com/p-507786.html