1、Designation: C 451 08Standard Test Method forEarly Stiffening of Hydraulic Cement (Paste Method)1This standard is issued under the fixed designation C 451; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision.
2、A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This test method covers the determination of earlystiffening in hydraulic-cement paste.1.2 The values stated in SI units are to be r
3、egarded asstandard. No other units of measurement are included in thisstandard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and dete
4、rmine the applica-bility of regulatory limitations prior to use.WarningFresh hydraulic-cementitious mixtures are caus-tic and may cause chemical burns to skin and tissue uponprolonged exposure. The use of gloves, protective clothing,and eye protection is recommended. Wash contact area withcopious am
5、ounts of water after contact. Wash eyes for aminimum of 15 min. Avoid exposure of the body to clothingsaturated with the liquid phase of the unhardened material.Remove contaminated clothing immediately after exposure.1.4 The text of this standard references notes and footnoteswhich provide explanato
6、ry material. These notes and footnotes(excluding those in tables and figures) shall not be consideredas requirements of the standard.2. Referenced Documents2.1 ASTM Standards:2C 150 Specification for Portland CementC 183 Practice for Sampling and the Amount of Testing ofHydraulic CementC 187 Test Me
7、thod for Normal Consistency of HydraulicCementC 219 Terminology Relating to Hydraulic CementC 305 Practice for Mechanical Mixing of Hydraulic CementPastes and Mortars of Plastic ConsistencyC 670 Practice for Preparing Precision and Bias Statementsfor Test Methods for Construction MaterialsC 1005 Spe
8、cification for Reference Masses and Devices forDetermining Mass and Volume for Use in the PhysicalTesting of Hydraulic CementsD 1193 Specification for Reagent Water3. Terminology3.1 Definitions:3.1.1 early stiffening, nthe early development of stiffnessin the working characteristics of a hydraulic-c
9、ement paste,mortar, or concrete; varieties include false set and flash set.3.1.2 false set, nthe early development of stiffness in theworking characteristics of a hydraulic-cement paste, mortar, orconcrete without the evolution of much heat, which stiffnesscan be dispelled and plasticity regained by
10、 further mixingwithout addition of water; also known as “grab set,” “prema-ture stiffening,” “ hesitation set,” and “rubber set.”3.1.3 flash set, nthe early development of stiffness in theworking characteristics of a hydraulic-cement paste, mortar, orconcrete, usually with the evolution of considera
11、ble heat,which stiffness cannot be dispelled nor can the plasticity beregained by further mixing without addition of water; alsoknown as “quick set.”3.1.4 Refer to Terminology C 219 for definitions of otherterms.4. Summary of Test Method4.1 A paste is prepared with the cement to be tested, usingsuff
12、icient water to give a required initial penetration as mea-sured by the Vicat apparatus at a stipulated time after comple-tion of mixing. A second penetration, termed the final penetra-tion, is measured at a later stipulated time. The ratio of finalpenetration to initial penetration is calculated as
13、 a percentage.5. Significance and Use5.1 The purpose of this test method is to determine thedegree to which a cement paste develops early stiffening or toestablish whether or not a cement complies with a specificationlimit on early stiffening.5.2 When used for establishing compliance with a specifi-
14、cation limit, the specification requirement is customarily statedin terms of the minimum allowable final penetration, in1This test method is under the jurisdiction of ASTM Committee C01 on Cementand is the direct responsibility of Subcommittee C01.30 on Time of Set.Current edition approved June 1, 2
15、008. Published June 2008. Originallyapproved in 1960. Last previous edition approved in 2007 as C 451 07.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standar
16、ds Document Summary page onthe ASTM website.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.percent, calculated in accordance with the Calculation Section.When used fo
17、r estimating the relative tendency of a cement tomanifest early stiffening, additional information of value maybe obtained if the remix procedure described in the ProcedureSection is employed. Under some conditions, a judgment maybe made by comparing the behavior in the initial test and in theremix
18、procedure to differentiate a relatively less serious andless persistent tendency to early stiffening (false set) from onethat is more persistent and, consequently, more serious (flashset).5.3 Severe false setting in a cement may cause difficultyfrom a placing and handling standpoint, but it is not l
19、ikely tocause difficulties where concrete is mixed for a longer timethan usual, as usually occurs in transit mixing, or where it isremixed prior to placing or transporting, as occurs in concretepumping operations. It is most likely to be noticeable whereconcrete is mixed for a short period of time i
20、n stationary mixersand transported to the forms in non-agitating equipment, suchas on some paving jobs, and when concrete is made in anon-site batch plant.5.4 Cements with severe false setting usually requireslightly more water to produce the same consistency, whichmay be expected to result in sligh
21、tly lower strengths andincreased drying shrinkage.5.5 Early stiffening resulting from false set is not likely tocause a cement to fail the applicable time of setting require-ment.5.6 Early stiffening resulting from flash set, depending onseverity, can cause a cement to fail the applicable time ofset
22、ting requirement.6. Apparatus6.1 Vicat Apparatus, conforming to the requirements of TestMethod C 187.6.2 Flat Trowel, having a sharpened straight-edged steelblade 100 to 150 mm in length. The edges when placed on aplane surface shall not depart from straightness by more than 1mm.6.3 Mixer, Bowl, Pad
23、dle, and Scraper, conforming to therequirements of Practice C 305.6.4 Glass Graduates, 200 or 250 ml capacity, conforming tothe requirements of Specification C 1005.6.5 Masses and Mass Determining Devices, conforming tothe requirements of Specification C 1005. The devices fordetermining mass shall b
24、e evaluated for precision and accuracyat a total load of 1000 g.6.6 Conical Ring, made of a rigid, non-corroding, non-absorbernt material, having a height of 40 6 1 mm, an insidediameter at the bottom of 70 6 3 mm, and an inside diameterat the top of 60 6 3 mm (see Test Method C 187, Fig. 1 itemG).6
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC4512008STANDARDTESTMETHODFOREARLYSTIFFENINGOFHYDRAULICCEMENTPASTEMETHOD 水泥 硬化 标准 试验 方法 水泥浆 PDF

链接地址:http://www.mydoc123.com/p-466609.html