1、Designation: C172/C172M 14C172/C172M 14aStandard Practice forSampling Freshly Mixed Concrete1This standard is issued under the fixed designation C172/C172M; the number immediately following the designation indicates the yearof original adoption or, in the case of revision, the year of last revision.
2、 A number in parentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This practice covers procedures for obtaining representative samples of fresh concrete as delivered to the project site onwhich tes
3、ts are to be performed to determine compliance with quality requirements of the specifications under which the concreteis furnished (Note 1). The practice includes sampling from stationary, paving and truck mixers, and from agitating and nonagitatingequipment used to transport central-mixed concrete
4、 and from continuous mixing equipment as described in SpecificationC685/C685M.1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in eachsystem may not be exact equivalents; therefore, each system shall be used independently of th
5、e other. Combining values from thetwo systems may result in non-conformance with the standard.NOTE 1Composite samples are required by this practice, unless specifically excepted by procedures governing the tests to be performed such as teststo determine uniformity of consistency and mixer efficiency
6、. Procedures used to select the specific test batches are not described in this practice, but itis recommended that random sampling be used to determine overall specification compliance.1.3 This practice also covers the procedures to be used for preparing a sample of concrete for further testing whe
7、re it is desirableor necessary to remove the aggregate larger than a designated size. This removal of larger aggregate particles is preferablyaccomplished by wet-sieving.1.4 The text of this standard references notes and footnotes which provide explanatory material and shall not be considered asrequ
8、irements of the practice.1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatorylimitations prior
9、 to use. (WarningFresh hydraulic cementitious mixtures are caustic and may cause chemical burns to skin andtissue upon prolonged exposure.2)2. Referenced Documents2.1 ASTM Standards:3E11 Specification for Woven Wire Test Sieve Cloth and Test SievesC685/C685M Specification for Concrete Made by Volume
10、tric Batching and Continuous Mixing3. Significance and Use3.1 This practice is intended to provide standard requirements and procedures for sampling freshly mixed concrete fromdifferent containers used in the production or transportation of concrete. The detailed requirements as to materials, mixtur
11、es, aircontent, temperature, number of specimens, slump, interpretation of results, and precision and bias are in specific test methods.4. Sampling4.1 The elapsed time shall not exceed 15 min. between obtaining the first and final portions of the composite sample.1 This practice is under the jurisdi
12、ction ofASTM Committee C09 on Concrete and ConcreteAggregates and is the direct responsibility of Subcommittee C09.60 on TestingFresh Concrete.Current edition approved Feb. 1, 2014Oct. 1, 2014. Published February 2014November 2014. Originally approved in 1942. Last previous edition approved in 20102
13、014as C17210.14. DOI: 10.1520/C0172_C0172M-14.10.1520/C0172_C0172M-14A.2 Section on Safety Precautions, Manual of Aggregate and Concrete Testing, Annual Book of ASTM Standards, Vol 04.02.3 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceas
14、tm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becau
15、seit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.*A Summary of Changes section appear
16、s at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States14.1.1 Transport the individual samples to the place where fresh concrete tests are to be performed or where test specimens areto be molded. They shall be com
17、bined and remixed with a shovel the minimum amount necessary to ensure uniformity andcompliance with the maximum time limits specified in 4.1.2.4.1.2 Start tests for slump, temperature, and air content within 5 min after obtaining the final portion of the composite sample.Complete these tests expedi
18、tiously. Start molding specimens for strength tests within 15 min after fabricating the compositesample. Expeditiously obtain and use the sample and protect the sample from the sun, wind, and other sources of rapid evaporation,and from contamination.5. Procedure5.1 Size of SampleMake the samples to
19、be used for strength tests a minimum of 28 L 1 ft3. Smaller samples are notprohibited for routine air content, temperature, and slump tests. The size of the samples shall be dictated by the maximumaggregate size.5.2 The procedures used in sampling shall include the use of every precaution that will
20、assist in obtaining samples that are trulyrepresentative of the nature and condition of concrete sampled as follows:NOTE 2Sampling should normally be performed as the concrete is delivered from the mixer to the conveying vehicle used to transport the concreteto the forms; however, specifications may
21、 require other points of sampling, such as the discharge of a concrete pump.5.2.1 Sampling from Stationary Mixers, Except Paving MixersSample the concrete by collecting two or more portions takenat regularly spaced intervals during discharge of the middle portion of the batch. Obtain these portions
22、within the time limitspecified in Section 4. Combine into one composite sample for testing purposes. Do not obtain portions of the composite samplefrom the very first or last part of the batch discharge (Note 3). Perform sampling by passing a receptacle completely through thedischarge stream, or by
23、completely diverting the discharge into a sample container. If discharge of the concrete is too rapid to divertthe complete discharge stream, discharge the concrete into a container or transportation unit sufficiently large to accommodate theentire batch and then accomplish the sampling in the same
24、manner as given above. Take care not to restrict the flow of concretefrom the mixer, container, or transportation unit so as to cause segregation. These requirements apply to both tilting and nontiltingmixers.NOTE 3No samples should be taken before 10 % or after 90 % of the batch has been discharged
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC172C172M2014ASTANDARDPRACTICEFORSAMPLINGFRESHLYMIXEDCONCRETE 搅拌 混凝土 取样 标准 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-465644.html