ASTM C1611 C1611M-2009be1 Standard Test Method for Slump Flow of Self-Consolidating Concrete《自成块混凝土坍落流动性试验方法》.pdf
《ASTM C1611 C1611M-2009be1 Standard Test Method for Slump Flow of Self-Consolidating Concrete《自成块混凝土坍落流动性试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1611 C1611M-2009be1 Standard Test Method for Slump Flow of Self-Consolidating Concrete《自成块混凝土坍落流动性试验方法》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1611/C1611M 09b1Standard Test Method forSlump Flow of Self-Consolidating Concrete1This standard is issued under the fixed designation C1611/C1611M; the number immediately following the designation indicates the yearof original adoption or, in the case of revision, the year of last revi
2、sion. A number in parentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEAdded research report information to Section 11 editorially in September 2010.1. Scope*1.1 This test method covers the determination o
3、f slump flowof self-consolidating concrete.1.2 The values stated in either SI units or inch-pound unitsare to be regarded separately as standard. The values stated ineach system may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combiningvalues from the two
4、 systems may result in non-conformancewith the standard.1.3 The text of this standard references notes and footnotesthat provide explanatory material. These notes and footnotes(excluding those in tables and figures) shall not be consideredas requirements of the standard.1.4 This standard does not pu
5、rport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. (WARNINGFresh hydraulic cementitious mixtur
6、es are caustic and maycause chemical burns to skin and tissue upon prolongedexposure.2)2. Referenced Documents2.1 ASTM Standards:3C125 Terminology Relating to Concrete and Concrete Ag-gregatesC143/C143M Test Method for Slump of Hydraulic-CementConcreteC172 Practice for Sampling Freshly Mixed Concret
7、eC173/C173M Test Method for Air Content of FreshlyMixed Concrete by the Volumetric MethodC670 Practice for Preparing Precision and Bias Statementsfor Test Methods for Construction Materials3. Terminology3.1 For definitions of terms used in this test method, refer toTerminology C125.3.2 Definitions o
8、f Terms Specific to This Standard:3.2.1 halo, nan observed cement paste or mortar ring thathas clearly separated from the coarse aggregate, around theoutside circumference of concrete after flowing from the mold.3.2.2 spread, nthe distance of lateral flow of concreteduring the slump-flow test.3.2.3
9、stability, nthe ability of a concrete mixture to resistsegregation of the paste from the aggregates.3.2.4 viscosity, nresistance of a material to flow under anapplied shearing stress.4. Summary of Test Method4.1 A sample of freshly mixed concrete is placed in a moldeither in the upright or inverted
10、position. The concrete is placedin one lift without tamping or vibration. The mold is raised, andthe concrete is allowed to spread. After spreading ceases, twodiameters of the concrete mass are measured in approximatelyorthogonal directions. Slump flow is the average of the twodiameters.5. Significa
11、nce and Use5.1 This test method provides a procedure to determine theslump flow of self-consolidating concrete in the laboratory orthe field.5.2 This test method is used to monitor the consistency offresh, unhardened self-consolidating concrete and its uncon-fined flow potential.5.3 It is difficult
12、to produce self-consolidating concrete thatis both flowable and nonsegregating using coarse aggregateslarger than 25 mm 1 in. Therefore, this test method isconsidered applicable to self-consolidating concrete havingcoarse aggregate up to 25 mm 1 in. in size. Appendix X1provides non-mandatory visual
13、rating criteria that may be used1This test method is under the jurisdiction of ASTM Committee C09 onConcrete and Concrete Aggregates and is the direct responsibility of SubcommitteeC09.47 on Self-Consolidating Concrete.Current edition approved Aug. 1, 2009. Published September 2009. Originallyapprov
14、ed in 2009. Last previous edition approved in 2009 as C1611/C1611M09a.DOI: 10.1520/C1611_C1611M-09B.2Section on Safety Precautions, Manual of Aggregate and Concrete Testing,Annual Book of ASTM Standards, Vol. 04.02.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM
15、Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshoho
16、cken, PA 19428-2959, United States.to classify the ability of a self-consolidating concrete mixtureto resist segregation (stability).5.4 The rate at which the concrete spreads is related to itsviscosity. Appendix X1 provides a non-mandatory procedurethat may be used to provide an indication of relat
17、ive viscosityof self-consolidating concrete mixtures.6. Apparatus6.1 MoldThe mold used in this test method shall conformto that described in Test Method C143/C143M.6.2 Base PlateAnonabsorbent, smooth, rigid plate havinga minimum diameter of 915 mm 36 in. (See Note 1).NOTE 1Field experience and resul
18、ts from the round robin testprogram have shown that base plates made from sealed/laminatedplywood, acrylic plastic, or steel are suitable for performing this test.6.3 Strike-off BarAs described in Test Method C173/C173M.6.4 Measuring DeviceA ruler, metal roll-up measuringtape, or similar rigid or se
19、mi-rigid measuring instrumentmarked in increments of 5 mm 14 in. or less.7. Sample7.1 The sample of concrete from which test specimens aremade shall be representative of the entire batch. It shall beobtained in accordance with Practice C172.8. Procedure8.1 Perform the test on a flat, level, nonabsor
20、bent surfacesuch as a concrete floor or a base plate. Use the base plate inconditions where a flat, level surface is not available, such ason a construction site. When the base plate is used, position andshim the base plate so that it is fully supported, flat, and level.Pre-moisten the work surface
21、or base plate with a damp towel,rag, or sponge.8.1.1 When performing the slump flow test for a given studyor project, do not change the base plate surface type for theduration of the study or project.8.2 Filling the Mold: Fill the mold by following eitherProcedure A or Procedure B (See Note 2).8.2.1
22、 Filling Procedure A (Upright Mold): Dampen themold and place it on the work surface, or centered on the baseplate, with the larger opening facing down. Hold the moldfirmly in place during filling by standing on the two footpieces. Fill the mold in a continuous manner (See Note 3).Overfill the mold
23、slightly above its top.8.2.2 Filling Procedure B (Inverted Mold): Dampen themold and place it on the work surface, or centered on the baseplate, with the smaller opening facing down (See Note 4). Fillthe mold in a continuous manner (See Note 3). Overfill themold slightly above its top.NOTE 2During t
24、he development of this test method, it was found thatsome of the users preferred to perform the test with the large opening ofthe mold facing down as is performed in Test Method C143/C143M. Theprovision of a collar to the top of the mold is useful to reduce theprobability of concrete spilling over t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC1611C1611M2009BE1STANDARDTESTMETHODFORSLUMPFLOWOFSELFCONSOLIDATINGCONCRETE 成块 混凝土 流动性 试验 方法 PDF

链接地址:http://www.mydoc123.com/p-465296.html