ASTM C1385 C1385M-1998(2004)e1 Standard Practice for Sampling Materials for Shotcrete《喷浆混凝土用取样材料的标准实施规程》.pdf
《ASTM C1385 C1385M-1998(2004)e1 Standard Practice for Sampling Materials for Shotcrete《喷浆混凝土用取样材料的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1385 C1385M-1998(2004)e1 Standard Practice for Sampling Materials for Shotcrete《喷浆混凝土用取样材料的标准实施规程》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 1385/C 1385M 98 (Reapproved 2004)e1Standard Practice forSampling Materials for Shotcrete1This standard is issued under the fixed designation C 1385/C 1385M; the number immediately following the designation indicates theyear of original adoption or, in the case of revision, the year of
2、 last revision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon (e) indicates an editorial change since the last revision or reapproval.e1NOTEThe title was changed to a dual designation editorially to reflect the existing measurements in the standardin September 2
3、004.1. Scope1.1 This practice covers procedures for obtaining represen-tative samples of materials to be shotcreted. The practicecovers sampling from stationary and truck mixers, volumetricand continuous mixing equipment, and bag and bulk delivery.1.2 The values stated in either inch-pound or SI uni
4、ts are tobe regarded separately as standard. Within the text, the SI unitsare shown in brackets. The values stated in each system are notexact equivalents; therefore, each system shall be used inde-pendently of the other. Combining values from the two systemsmay result in nonconformance with this pr
5、actice.2. Significance and Use2.1 This practice is used to obtain representative samples ofmaterials delivered to the shotcrete machine. These samplesare used to perform tests to determine compliance with thespecifications under which the material is furnished.3. Procedure3.1 Composite samples are r
6、equired by this practice, unlessspecifically made exempt by procedures governing the tests tobe performed, such as tests to determine uniformity of consis-tency and mixer efficiency. Procedures used to select thespecific test batches are not described in this practice, but it isrecommended that rand
7、om sampling be used to determineoverall specification compliance.3.2 The size of an individual sample shall be a minimum of25 lb 12 kg, the size of the composite sample shall be aminimum of 75 lb 35 kg. The composite sample shall be largeenough to perform the required tests.3.3 Sampling shall be per
8、formed as the shotcrete material isdelivered to the shotcrete machine. The procedures used insampling shall include the use of every precaution that willassist in obtaining samples that are truly representative of thenature and condition of the material sampled as follows:3.3.1 Sampling Dry Process
9、Shotcrete MaterialsSamplethe material by collecting two or more portions taken atregularly spaced intervals during discharge of the middle of thebatch or two or more random portions from the discharge ofcontinuous mixers. Combine the portions into one sample fortesting purposes. Do not obtain portio
10、ns of the compositesample from the first 15 % or the last 15 % of the discharge.3.3.2 Sampling Wet Process Shotcrete MaterialSample asdescribed in 3.3.1 within the following limits.3.3.2.1 The elapsed time between obtaining the first and lastportions of the composite sample shall be as short as poss
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC1385C1385M19982004E1STANDARDPRACTICEFORSAMPLINGMATERIALSFORSHOTCRETE 喷浆 混凝土 取样 材料 标准 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-464443.html