《ASTM C1091-2003a Standard Test Method for Hydrostatic Infiltration Testing of Vitrified Clay Pipe Lines《上釉陶土管道的水压渗入和渗出试验的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1091-2003a Standard Test Method for Hydrostatic Infiltration Testing of Vitrified Clay Pipe Lines《上釉陶土管道的水压渗入和渗出试验的标准试验方法》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 1091 03aStandard Test Method forHydrostatic Infiltration Testing of Vitrified Clay Pipe Lines1This standard is issued under the fixed designation C 1091; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of la
2、st revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method defines procedures for hydrostaticinfiltration testing of new installations of vitrified clay pipeline
3、s, to demonstrate the structural integrity of the installedline. Refer to Practice C 12.1.2 This test method is suitable for testing gravity-flow pipelines constructed of vitrified clay pipe or combinations of claypipe and other pipe materials.1.3 This test method is applicable to the testing of the
4、 pipelines only. Manholes or other structures should be testedseparately.1.4 The values stated in inch-pound units are to be regardedas the standard. The values given in parentheses are providedfor information only.1.5 This standard does not purport to address all of thesafety problems, if any, asso
5、ciated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C 12 Practice for Installing Vitrified Clay Pipe LinesC 8
6、28 Test Method for Low-Pressure Air Test of VitrifiedClay Pipe LinesC 896 Terminology Relating to Clay Products3. Terminology3.1 Terminology C 896 can be used for clarifications ofterminology in this test method.4. Summary of Test Method4.1 This test method shall be performed on lines afterconnectio
7、n laterals, if any, have been plugged and adequatelybraced to withstand the test pressure, and after the trencheshave been backfilled and compacted.5. Significance and Use5.1 The tests called for herein, for their results, indicate theacceptability of installed vitrified clay pipelines.6. Preparatio
8、n of the Line6.1 To ensure the proper seating of the test plugs and theaccuracy of the test, the lines should be cleaned prior to testing.6.2 Examples of methods for cleaning the lines are thesewer cleaning ball and high pressure flushing equipment.7. Procedure7.1 The hydrostatic infiltration test p
9、rocedure is applicablewhere the measured water table is 2 ft (610 mm) or greaterabove the pipe barrel at the lower manhole of the test section.Where the ground water elevation is indeterminate, less than 2ft (610 mm) above the top of the pipe barrel, or the line ispartially below the water table, us
10、e a combination of both theair test and infiltration procedure.NOTE 1The most practical method for testing is Test Method C 828,and is recommended. However, where ground water is present and meetsthe criteria established in 7.1, the infiltration test procedure outlined in thispractice is recommended
11、.7.2 Determine the allowable infiltration rate for the testsection using Table 1.NOTE 2What can be called false infiltration represents condensate onthe pipe walls.7.3 The test rate table is based on the standard of 50 gal/in.diametermileday (4.6 L/mm diameterkilometreday).7.4 Table 1 shows the allo
12、wable infiltration rate ingallons 100 ft of pipe hour (litres per 30.5 metres hour) foreach nominal pipe size.7.5 If the test section includes more than one pipe size,calculate the allowable test rate for each size and add to arriveat the total allowable test rate for the test section.1This test met
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC10912003ASTANDARDTESTMETHODFORHYDROSTATICINFILTRATIONTESTINGOFVITRIFIEDCLAYPIPELINES 上釉 陶土 管道 水压

链接地址:http://www.mydoc123.com/p-463333.html