ASTM B788 B788M-2009(2014) Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe《安装工厂制波纹铝涵管和雨水管的标准实施规程》.pdf
《ASTM B788 B788M-2009(2014) Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe《安装工厂制波纹铝涵管和雨水管的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM B788 B788M-2009(2014) Standard Practice for Installing Factory-Made Corrugated Aluminum Culverts and Storm Sewer Pipe《安装工厂制波纹铝涵管和雨水管的标准实施规程》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: B788/B788M 09 (Reapproved 2014)Standard Practice forInstalling Factory-Made Corrugated Aluminum Culverts andStorm Sewer Pipe1This standard is issued under the fixed designation B788/B788M; the number immediately following the designation indicates the yearof original adoption or, in the
2、 case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the U.S. Department of Defense.1. Scope*1.1
3、This practice describes procedures, soils, and soil place-ment for the proper installation of corrugated aluminumculverts and storm sewers in either trench or projectioninstallations. A typical trench installation is shown in Fig. 1,and a typical embankment (projection) installation is shown inFig.
4、2. The pipes described in this practice are manufactured ina factory and furnished to the job in lengths ordinarily from 10to 30 ft 3 to 9 m, with 20 ft 6 m being common, for fieldjoining. This practice applies to structures designed in accor-dance with Practice B790/B790M.1.2 The values stated in e
5、ither SI units or inch-pound unitsare to be regarded separately as standard. The values stated ineach system may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combiningvalues from the two systems may result in non-conformancewith the standard.1.2.1 SI Unit
6、sSI units are shown in the text in brackets,and they are the applicable values for metric installation.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and h
7、ealth practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2B745/B745M Specification for Corrugated Aluminum Pipefor Sewers and DrainsB790/B790M Practice for Structural Design of CorrugatedAluminum Pipe, Pipe-Arches, and Arches f
8、or Culverts,Storm Sewers, and Other Buried ConduitsD698 Test Methods for Laboratory Compaction Character-istics of Soil Using Standard Effort (12 400 ft-lbf/ft3(600kN-m/m3)D1556 Test Method for Density and Unit Weight of Soil inPlace by Sand-Cone MethodD2167 Test Method for Density and Unit Weight o
9、f Soil inPlace by the Rubber Balloon MethodD2487 Practice for Classification of Soils for EngineeringPurposes (Unified Soil Classification System)D2937 Test Method for Density of Soil in Place by theDrive-Cylinder MethodD6938 Test Method for In-Place Density and Water Contentof Soil and Soil-Aggrega
10、te by Nuclear Methods (ShallowDepth)3. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.1 bedding, nthe earth or other material on which apipe is supported.3.1.2 haunch, nthe portion of the pipe cross sectionbetween the maximum horizontal dimension and the top of thebedding.3.1.3 in
11、vert, nthe lowest point on the pipe cross section;also, the bottom portion of a pipe.3.1.4 pipe, na conduit having full circular shape; also, ina general context, all structure shapes covered by this practice.3.1.5 pipearch, na pipe with an approximate semicircu-lar crown, small-radius corners, and
12、large-radius invert.4. Significance and Use4.1 Corrugated aluminum pipe functions structurally as aflexible ring which is supported by and interacts with thecompacted surrounding soil. The soil constructed around thepipe is thus an integral part of the structural system. It istherefore important to
13、ensure that the soil structure or backfillis made up of acceptable material and is well-constructed.Field verification of soil structure acceptability using TestMethods D1556, D2167, D2937,orD6938 as applicable, andcomparing the results with Test Method D698 in accordance1This practice is under the
14、jurisdiction of ASTM Committee B07 on LightMetals and Alloys and is the direct responsibility of Subcommittee B07.08 onCorrugated Aluminum Pipe and Corrugated Aluminum Structural Plate.Current edition approved May 1, 2014. Published June 2014. Originallyapproved in 1988. Last previous edition approv
15、ed in 2009 as B788/B788M 09.DOI: 10.1520/B0788_B0788M-09R14.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.*
16、A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1with the specifications for each project, is the most reliablebasis for installation of an acceptable structure. The requi
17、reddensity and method of measurement are not specified by thispractice, but they must be established in the specifications foreach project.5. Trench Excavation5.1 To obtain anticipated structural performance of corru-gated aluminum pipe it is not necessary to control trench widthbeyond the minimum r
18、equired for proper installation of pipeand backfill. However, the soil on each side beyond theexcavated trench must be able to support anticipated loads.When a construction situation calls for a relatively wide trench,it shall be made as wide as required, for its full depth if sodesired. However, tr
19、ench excavation must be in compliancewith any local, state, and federal codes and safety regulations.6. Foundation6.1 The supporting soil beneath the pipe must provide areasonably uniform resistance to the imposed load, bothlongitudinally and laterally. Sharp variations in the foundationmust be avoi
20、ded. When rock is encountered, it must beexcavated and replaced with soil. If the pipe runs along acontinuous rock foundation, it is necessary to provide asuitable soil bedding under the pipe. See Fig. 3.6.2 Lateral changes in foundation should never be such thatthe pipe is firmly supported while th
21、e backfill alongside is not.When soft material is encountered during construction andmust be removed in order to provide an adequate foundation,remove the soft material for a distance of three pipe widths,unless the engineer has set another limit. See Fig. 4.6.3 Performance of buried pipe is enhance
22、d by allowing thepipe to settle slightly under load compared to the columns ofsoil alongside. Thus, for larger pipes it can be beneficial topurposely create a foundation under the pipe itself which willyield under load more than will the foundation under thecolumns of soil to each side. It can usual
23、ly be obtained byplacing a layer of compressible soil of a suitable thickness, lessdensely compacted than the soil alongside, beneath the struc-ture. This creates favorable relative movement between pipeand the soil on each side. It is of particular importance onpipe-arches.FIG. 1 Typical Trench Ins
24、tallationFIG. 2 Typical Embankment (Projection) Installationd =12 in./ft 40 mm/m of fill over pipe, with a 24-in. 600-mm maximum.NOTE 1Section B-B is applicable to all continuous rock foundations.FIG. 3 Foundation Transition Zones and Rock FoundationsFIG. 4 Soft Foundation TreatmentB788/B788M 09 (20
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMB788B788M20092014STANDARDPRACTICEFORINSTALLINGFACTORYMADECORRUGATEDALUMINUMCULVERTSANDSTORMSEWERPIPE

链接地址:http://www.mydoc123.com/p-462274.html