ASHRAE OR-10-031-2010 An Innovative Ventilation System for Cleanrooms with High Cooling Loads《带有高冷却负载的洁净室用创新通风系统》.pdf
《ASHRAE OR-10-031-2010 An Innovative Ventilation System for Cleanrooms with High Cooling Loads《带有高冷却负载的洁净室用创新通风系统》.pdf》由会员分享,可在线阅读,更多相关《ASHRAE OR-10-031-2010 An Innovative Ventilation System for Cleanrooms with High Cooling Loads《带有高冷却负载的洁净室用创新通风系统》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、2010 ASHRAE 293ABSTRACTIn a traditional ventilation arrangement, a wall returnsystem containing a ceiling air supply and wall exhaust is usedin non-unidirectional airflow type cleanrooms. In industrialcleanrooms, such as semiconductor cleanrooms, however,larger process tools result in smaller passag
2、e of airflowstowards the wall-exhaust vents due to larger footprints andvolumes of process tools. Additionally, only sub-micron parti-cles are a concern for semiconductor cleanrooms (Hu and Wu,2003) and these particles are with very small magnitudes ofterminal velocities when moving in cleanroom air
3、 (Hinds.1999). The conventional wall return system used in existinghigh cooling load cleanrooms aims to create a uniform airtemperature distribution and a diluted particle concentrationenvironment in which the downward cold supply air from ceil-ing filters encounters upward air currents due to exhau
4、st heatas well as particle sources from process tools. To address theproblem, this study proposes a unique local air exhaust systemthat can significantly improve the air cleanliness level andremove heat loads efficiently. The main component is a Fan DryCoil Unit (FDCU) installed on the ceiling above
5、 the processtool in order to extract heat and particles released from thetool. The new proposed system is therefore referred as theFDCU system. An experimental study was conducted in a full-scale cleanroom with real process tools to compare the perfor-mance of both systems. Results show that more th
6、an 50% ofparticles were eliminated by the proposed FDCU system ascompared to that of the conventional wall return system. Theproposed FDCU system is also useful for solving problemssuch as a high negative static pressure in the supply chamberand high flow resistance in the flow path of the conventio
7、nalwall return system. The measured pressure in the supply cham-ber was 2 Pa (2.9 104psi) for the FDCU system, while thatof the wall return system was a negative value which variedproportionally to the air change rates of the cleanroom.INTRODUCTIONIn the traditional arrangement of the airflow path i
8、n acleanroom, shown in Figure 1, supply air (SA) is introducedfrom the ceiling and return air (RA) is located on the wall ata low level (IEST, 1995 and Whyte 2001). This system ishereafter referred to as a wall return system cleanroom. In thissystem, the direction of airflow is maintained consistent
9、 withthe movement of gravitationally settling particles (or bio-aerosols in a bio-cleanroom such as a pharmaceutical clean-room or hospital operating room). In this type of cleanroom,the return air shaft (RAS) occupies space in the cleanroomand increases the power input of fan-filter units (FFU) due
10、 toa long flow path to/from the FFU. Moreover, the return air-flow is significantly influenced by production tools anddevices, as well as the movements of operators. In summary,existing problems in the wall return system are as follows:(1) the external static pressure of FFU must be high (to over-co
11、me pressure resistance of the return air grill (RAG), RAS,and dry cooling coils (DCC), (2) the downward cold supplyair from the FFU encounters upward air currents due to theheat-load from process tools, and (3) fixed positions of theRAS and DCC. Installation of supply inlets and exhaust out-lets on
12、the ceiling conflicts with the traditional concept ofcleanroom airflow path arrangement. Murakami et al. (1992)indicated that changes in arrangement or in the number of ex-haust openings do not have a significant effect on the entireflow field; however, such changes often have a large influenceon th
13、e particle diffusion field (for 0.3 m particles) since theAn Innovative Ventilation System for Cleanrooms with High Cooling LoadsTi Lin Shih-Cheng Hu, PhDMember ASHRAEAndy Chang Cheng-Yan LinTi Lin and Andy Chang are PhD students, Shih-Cheng Hu is professor and Cheng-Yan Lin is MS student, in the De
14、partment of Energy andRefrigerating Air-Conditioning Engineering, National Taipei University of Technology, Taipei Taiwan.OR-10-031 2010, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions 2010, Vol. 116, Part 1. For per
15、sonal use only. Additional reproduction, distribution, or transmission in either print or digital form is not permitted without ASHRAEs prior written permission. 294 ASHRAE Transactionsparticle transportation path is changed by the position of theexhaust outlets. Murakami et al. (1989) also indicate
16、d that alocally balanced supply-exhaust airflow system (the supplyand exhaust airflow rates balanced locally within a flow unit)exhibits better exhaust particle performance than that of awall return type cleanroom. For industrial cleanrooms with ahigh cooling load, such as semiconductor cleanrooms f
17、orsemiconductor testing and for thin filming (with furnaceequipment), the cleanliness level must be maintained andtemperature controlled within a strict interval, and currently,the size of the particles of concern fall into the sub-micronregion due to advances in semiconductor manufacturing tech-nol
18、ogy. To solve the problems mentioned above, this studyproposes a unique local air distribution scheme that can main-tain the cleanliness level within the requirements while re-moving cooling load efficiently. The new proposed system(see Figure 2) is referred as a Fan Dry Coil Unit system, inwhich th
19、e supply inlet and exhaust outlet are installed in theceiling and heat is removed by a dry coil located just above theprocess tools. This study aims to evaluate the performance ofthe proposed system and to compare the system with the tra-ditional wall return system by experimental measurements in(a)
20、(b)Figure 1 (a) An existing wall return system and (b) the proposed FDCU system. 2010, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions 2010, Vol. 116, Part 1. For personal use only. Additional reproduction, distributi
21、on, or transmission in either print or digital form is not permitted without ASHRAEs prior written permission. ASHRAE Transactions 295a full-scale cleanroom with a typical cooling load using asemiconductor testing machine.EXPERIMENTAL SET-UPA full-scale cleanroom was set up with dimensions of4.8 m 6
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASHRAEOR100312010ANINNOVATIVEVENTILATIONSYSTEMFORCLEANROOMSWITHHIGHCOOLINGLOADS 带有 冷却 负载 洁净室 创新 通风 系统

链接地址:http://www.mydoc123.com/p-455693.html