ARMY UFGS-46 66 56-2011 OPEN-CHANNEL DISINFECTION EQUIPMENT.pdf
《ARMY UFGS-46 66 56-2011 OPEN-CHANNEL DISINFECTION EQUIPMENT.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-46 66 56-2011 OPEN-CHANNEL DISINFECTION EQUIPMENT.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-46 66 56 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 44 73 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 46 - WATER AND WASTEWATER EQUIPMENTSECTION 46 6
2、6 56OPEN-CHANNEL DISINFECTION EQUIPMENT02/11PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Operation of Existing Facility1.2.2 Design Conditions1.2.3 Performance Requirements1.2.3.1 Inactivation1.2.3.2 UV Dose1.2.3.3 Nominal Average Intensity1.2.3.4 UV Density1.2.3.5 Retention Time1.2.3.6 P
3、lug Flow1.2.3.7 Dispersion1.2.3.8 Turbulence1.2.3.9 Channel Volume1.2.3.10 Headloss1.2.3.11 Cross Sectional Area1.2.3.12 Aspect Ratio1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Contractor Qualifications1.4.2 Manufacturers Qualifications1.4.3 Equipment Parts1.4.4 System Performance1.5 PRECONSTRUCTION CO
4、NFERENCE1.6 DELIVERY, STORAGE, AND HANDLING1.7 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Standard Products2.1.2 Nameplates2.2 EQUIPMENT2.2.1 LayoutSECTION 46 66 56 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.2 Equipment Construct
5、ion2.2.2.1 UV Lamp Module2.2.2.2 UV Lamps2.2.2.3 UV Lamp Sleeve2.2.2.4 Lamp End Seal and Lamp Holder2.2.2.5 UV Lamp Module Support Rack2.2.3 Lamp Array Configuration2.2.4 Water Level Control2.3 ELECTRICAL2.3.1 Parameters2.3.2 Interconnect Cables2.3.3 Connectors and Receptors2.3.4 Ballasts2.3.5 Cable
6、way2.3.6 Instrumentation and System Controls2.3.6.1 Controls2.3.6.2 Lamp Status Indicators2.3.6.3 UV Intensity Detection System2.3.6.4 Minor Alarms2.3.6.5 Major Alarms2.3.6.6 Flow Pacing2.4 CLEANING SYSTEM2.4.1 General Requirements2.4.2 Cleaning Tank2.4.3 Cleaning Rack2.4.4 Cleaning Fluid2.5 PAINTIN
7、G2.6 ANCHOR BOLTSPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.3 FRAMED INSTRUCTIONS3.4 FIELD QUALITY CONTROL3.4.1 Operating Test3.4.2 Performance Testing3.5 MANUFACTURERS FIELD SERVICES3.5.1 Manufacturers Representative3.5.2 Site Visits3.6 ADJUSTING AND CLEANING3.7 Field Training3.7.1 Instructio
8、n Plan3.7.2 Training Outline- End of Section Table of Contents -SECTION 46 66 56 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-46 66 56 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 44 73 (A
9、pril 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 46 66 56OPEN-CHANNEL DISINFECTION EQUIPMENT02/11*NOTE: This guide specification covers the requirements for ultraviolet (UV) disinfection equipment for treatment of wastewater.Adhere to UF
10、C 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicab
11、le items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).
12、*PART 1 GENERAL*NOTE: This specification should be used to allow the Contractor to install proven “off-the-shelf“ units supplied by reputable vendors. This guide specification includes technical requirements for ultraviolet disinfection equipment and controls. This specification will not be used for
13、 disinfection of water or industrial wastes.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in SECTION 46 66 56 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without lice
14、nse from IHS-,-,-the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article.
15、 Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a pa
16、rt of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)ANSI C82.4 (2002) American National Standard for Ballasts for High-Intensity-Discharge and Low-Pressure Sodium (LPS) L
17、amps (Multiple-Supply Type)NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)NEMA ICS 1 (2000; R 2005; R 2008) Standard for Industrial Control and Systems: General RequirementsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2011) National Electrical CodeU.S. ENVIRONMENTAL P
18、ROTECTION AGENCY (EPA)EPA 625/1-86/021 (1986) Design Manual: Municipal Wastewater Disinfection1.2 SYSTEM DESCRIPTIONProvide an ultraviolet (UV) disinfection system complete and operational with controls and accessories as shown and as specified. Provide equipment suitable for outdoor open channel, g
19、ravity flow installation including, but not limited to, the following components, and appurtenances necessary for the interconnection of components, in the quantities required:(1) UV lamp module with support rack and bracket.(2) UV system instrumentation, controls, and power distribution.(3) Wireway
20、 and interconnecting cables.(4) Water level control device.(5) UV intensity monitoring system.(6) Elapsed time meter.(7) Cleaning system.SECTION 46 66 56 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(8) Spare parts.1.2.1 Operation of Existin
21、g Facility*NOTE: Include the following paragraph only where UV disinfection system is replacing another disinfection system at the existing wastewater treatment plant.*Maintain the continuous flow of wastewater and disinfection until the new system is tested, approved and fully operational. No disch
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS4666562011OPENCHANNELDISINFECTIONEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-449799.html