《ARMY UFGS-46 61 00-2011 FILTRATION EQUIPMENT.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-46 61 00-2011 FILTRATION EQUIPMENT.pdf(40页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-46 61 00 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 43 00 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 46 - WATER AND WASTEWATER EQUIPMENTSECTION 46
2、 61 00FILTRATION EQUIPMENT02/11PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Influent Flow Characteristics1.2.2 Design Criteria1.2.3 Cartridge and Bag Influent1.2.4 Cartridge and Bag Design Criteria1.3 SUBMITTALS1.4 QUALIFICATIONS1.4.1 Installer1.4.2 Manufacturers Representative1.4.3 Media
3、 Supplier Representative1.5 DELIVERY, STORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Standard Products2.1.2 Nameplates2.1.3 Protection of Moving Parts2.1.4 Special Tools2.1.5 Steel Plates, Shapes and Bars2.1.6 Pipe and Fittings2.1.6.1 Steel Pipe2.1.6.2 Ductil
4、e Iron Pipe2.1.6.3 Stainless Steel Pipe2.1.6.4 Polyvinyl Chloride (PVC) Pipe2.1.7 Pipe Hangers and Supports2.1.8 Valves2.1.8.1 Steel Valves2.1.8.2 Cast Iron Valves2.1.8.3 PVC Valves2.1.9 Other Materials2.1.9.1 Polypropylene Support MaterialSECTION 46 61 00 Page 1Provided by IHSNot for ResaleNo repro
5、duction or networking permitted without license from IHS-,-,-2.1.9.2 Joint Compound2.1.9.3 Joint Tape2.2 ELECTRICAL EQUIPMENT2.2.1 Electrical Work2.2.2 Electric Motors2.2.3 Motor Controls2.2.4 Electrical Power Control2.2.4.1 General Requirements2.2.4.2 Control System2.2.5 Remote Alarm and Process Va
6、riable Monitoring2.2.6 Bolts, Nuts, Anchors, and Washers2.2.7 Valves2.2.8 Pumps2.2.9 Air Compressors2.2.10 Pressure Gauges2.2.11 Gauge Panel2.2.12 Tank Requirements2.2.12.1 Parameters2.2.12.2 Tank Construction Materials2.2.12.3 Site Glasses2.3 MEDIA2.3.1 High-Density Sand2.3.2 Silica Sand2.3.3 Anthr
7、acite Coal2.3.4 Support Media2.4 CONTINUOUS BACKWASH FILTRATION SYSTEM2.4.1 Equipment Capacity2.4.2 Filter Tank2.4.3 Filter Media2.4.4 Influent Dosing System2.4.5 Effluent Collection System2.4.6 Media Cleaning System2.4.6.1 Sand Lift2.4.6.2 Sand Washer2.4.6.3 Sand Distribution Equipment2.4.6.4 Rejec
8、t Collection System2.4.7 Effluent Rate Control2.4.7.1 Pneumatic Controls2.4.7.2 Headloss Switch2.4.8 Equipment Control Panel2.4.9 Flowmeters2.5 TRAVELLING BRIDGE FILTER2.5.1 Tank2.5.2 Filter Bed2.5.2.1 Cell Dividers2.5.2.2 Porous Plate2.5.3 Voids Distribution2.5.4 Rails2.5.5 Carriage Mechanism2.5.5.
9、1 Carriage Frame2.5.5.2 Carriage Drive2.5.5.3 Carriage Wheels2.5.6 Automatic Backwash System2.5.7 Washwater Removal System2.5.8 Washwater Launders2.5.9 Equipment Control2.5.9.1 Automatic Controls2.5.9.2 Control Panel2.5.9.3 MotorsSECTION 46 61 00 Page 2Provided by IHSNot for ResaleNo reproduction or
10、 networking permitted without license from IHS-,-,-2.5.9.4 Backwash Mechanism2.5.9.5 Electrification System2.5.9.6 Factory Tests2.5.10 Auxiliary Equipment2.5.10.1 Pumps2.5.10.2 Weirs2.5.10.3 Backwash Channel and Washwater Trough2.6 PRESSURE FILTERS2.6.1 Pressure Filter Tank2.6.2 Underdrain System2.6
11、.3 Pressure Filters Media2.6.4 Distributor/Collector2.6.5 Surface Wash Agitators2.6.6 Air Scour System2.6.6.1 Air Wash Distribution2.6.6.2 Air Blower2.6.7 Equipment Control2.6.7.1 Control Valves2.6.7.2 Effluent Rate Controllers2.6.7.3 Backwash Controller2.6.8 Equipment Control Panel2.6.9 Backwash Ta
12、nk2.7 CARTRIDGE FILTER2.7.1 Equipment Capacity2.7.2 Filter Material2.7.3 Cartridge Style2.7.4 Gasket or O-Ring Material2.7.5 Pore Size/Rating2.7.6 Filter Cartridge Dimensions2.7.7 Core Material2.7.8 Filter Housing2.7.8.1 Material of Construction2.7.8.2 Shell O-Ring Material2.8 BAG FILTER2.8.1 Equipm
13、ent Capacity2.8.2 Filter Material2.8.3 Gasket Material2.8.4 Pore Size/Rating2.8.5 Bag Surface Area2.8.6 Bag Support2.8.7 Filter Housing2.8.7.1 Material of Construction2.8.7.2 Shell O-Ring Material2.9 SAMPLE PORTS2.10 TURBIDIMETER2.11 DRAIN LINE2.12 CHEMICAL FEED2.13 MATERIALS PROTECTION2.14 ACCESS W
14、ALKWAYS, PLATFORMS, LADDERS AND HANDRAILSPART 3 EXECUTION3.1 EXAMINATION3.2 PREPARATION3.2.1 Fabrication3.2.2 System Installation3.3 PAINTING3.3.1 Metal surfaces3.3.2 Preparation and ApplicationSECTION 46 61 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without licens
15、e from IHS-,-,-3.3.3 Coating Testing3.3.4 Coating Repair3.4 VALVE AND PIPE INSTALLATION3.4.1 Valves3.4.2 Piping3.5 FILTER TANK3.5.1 Installion3.5.2 Erection of Equipment3.6 UNDERDRAIN3.7 SUPPORT MEDIA3.8 FILTER MEDIA INSTALLATION3.8.1 Media Layers3.8.2 Cleaning of Media3.9 IDENTIFICATION SYSTEMS3.9.
16、1 Identification Tags3.9.2 Color Coding3.10 VENT LINE INSTALLATION3.11 POSTING FRAMED INSTRUCTIONS3.12 FIELD TESTS AND INSPECTIONS3.12.1 Initial Operation3.12.2 Acceptance Testing3.13 FIELD TRAINING- End of Section Table of Contents -SECTION 46 61 00 Page 4Provided by IHSNot for ResaleNo reproductio
17、n or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-46 61 00 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 43 00 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 46 61 00FILTRATI
18、ON EQUIPMENT02/11*NOTE: This guide specification covers the requirements for filtration systems with capacity less than 750 liters (200 gallons) per minute.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new pro
19、ject specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not
20、 brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. Th
21、e publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the R
22、eference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.SECTION 46 61 00 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-References not used in the text will automatically be deleted from this section
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS4661002011FILTRATIONEQUIPMENTPDF